name: ln-31-delivery-plan-builder
description: "Builds dependency-ordered delivery plans from requirements and repository evidence; read-only."
---

# Delivery Plan Builder

**Goal:** Return a decision-complete, proportionate delivery plan for the requested outcome. Keep planning read-only: do not edit files, create tracker items, implement, publish, or deploy.

**Execution contract:** The ordered checkboxes are the Definition of Done. Track every item internally as `PENDING`, `PROVEN` with concrete evidence, `CLEARED` with evidence that its condition is absent, or `UNPROVEN` with a gap; reading, delegation, or tool failure is not proof. Reconcile items after each section. Before returning, resolve all `PENDING` and count only `PROVEN` and `CLEARED`; apply the skill's verdict and approval rules to every gap.
Preserve user intent, scope, and existing authorization. Continue authorized work; ask only for consequential unresolved choices or required external approval. Scale depth to material risk without silently skipping checks. Preserve dependency and safety ordering; otherwise choose the verification method appropriate to each obligation.
Treat equivalent user or repository evidence as valid input; another skill, named artifact, or complete lifecycle is not a prerequisite. Preserve source requirement and decision identifiers when available. Bind reused evidence to the relevant source version, dirty changes, configuration, and environment; invalidate only affected claims after a change.
On continuation, reconcile the task, existing authorization, current state, and unresolved evidence before resuming. For long work, return a compact continuation record or update an already authorized task artifact; read-only skills do not persist it. Distinguish artifact readiness, verified behavior, and authority to perform an external action.
Prepare authorized work before any required approval. If an instruction prevents progress, identify its exact source and explain the unresolved boundary; do not invent an approval gate from general caution.


## Tool Routing

| Need | Preferred capability | Fallback |
|---|---|---|
| Outcome and constraints | User request, requirements and accepted design decisions | Equivalent conversation or repository evidence; no mandatory upstream skill |
| Implementation ownership | Code intelligence, focused definitions and consumer/configuration reads | Narrow symbol search and direct causal tracing |
| Verification and delivery | Repository test/build/release definitions and environment contracts | Name exact missing prerequisite and feasible evidence action |

## Domain Rules

- Plan complete observable increments rather than arbitrary file batches. Separate planned work, evidence and authorization.
- Prefer existing project conventions and the smallest complete implementation; estimates are ranges with assumptions, not promises.
- A migration plan owns detailed transition semantics when supplied; reference it without inventing a competing sequence.

## Checklist

### 1. Establish the Delivery Contract

- [ ] Resolve the business outcome, acceptance, protected behavior, authorized implementation boundary and non-goals.
- [ ] Inspect repository instructions, relevant Git state, source requirements and accepted/proposed design status.
- [ ] Trace affected entrypoints, owning logic, state, consumers and integrations; identify evidence gaps that could change the plan.
- [ ] Resolve consequential intent, compatibility and external-state choices before presenting a ready plan.

### 2. Choose the Work Units

- [ ] Identify the smallest complete approach, including no change, configuration, deletion or reuse where it satisfies acceptance.
- [ ] Divide necessary work into independently verifiable outcomes with explicit inputs, owning boundaries and completion evidence.
- [ ] Map every material requirement and protected invariant to at least one work unit and acceptance check.
- [ ] Identify dependencies from contracts, data, deployment order and shared state; remove cycles or expose the required decision.
- [ ] Allow parallel work only where interfaces and mutation ownership are independent; do not mandate agent delegation.
- [ ] Specify integration checks between units and the final observable journey; local unit completion alone is insufficient.

### 3. Plan Verification and Recovery

- [ ] Map material failure and regression risks to the smallest reliable checks, their prerequisites and pass criteria.
- [ ] Reuse valid existing test evidence and strategy; identify needed additions, updates, retirements or justified no-test decisions.
- [ ] Identify migration, feature-flag, compatibility and rollout dependencies with abort and recovery conditions where applicable.
- [ ] State any irreversible step and authorized external boundary; never promise rollback where only roll-forward is viable.
- [ ] Distinguish local implementation, release publication, deployment and product-outcome verification.

### 4. Review Plan Completeness

- [ ] Check requirement coverage, dependency order, integration ownership and absence of hidden consequential decisions.
- [ ] Size effort only when useful, with assumptions and uncertainty; identify the critical path without manufactured precision.
- [ ] Return the plan in the response with source identities and explicit unresolved evidence; do not persist a tracker or document.
- [ ] Identify what requirement or source changes would invalidate each affected work unit or check.

## Verdict

- `READY`: the plan covers acceptance and integration with executable units, credible verification and resolved consequential decisions.
- `REVISE`: a usable plan has explicit gaps or conflicting dependencies to resolve.
- `BLOCKED`: essential intent, ownership or evidence is unavailable and no bounded plan can be responsibly established.

## Self-Check

- [ ] **Reconcile before returning.** Check item-level evidence, requirement coverage, contradictions, scope, verdict, and applicable cleanup. Correct the report or authorized artifacts. Reuse valid evidence; do not automatically rescan the repository or rerun successful commands. Repeat checks only for relevant changes, failures, or unresolved evidence. Disclose remaining gaps.

## Output Contract

Report in the user's language, in this order; retain all five fields and state each fact once. Small results may use one line per field; omit empty tables and do not copy linked artifacts:

1. **Result:** Skill-specific verdict and supported outcome.
2. **Scope:** Reviewed/changed scope, exclusions, baseline, and material assumptions.
3. **Evidence:** Skill-specific fields below; distinguish facts, inferences, and unverified claims. Link artifacts; use tables when useful.
4. **Verification:** Checks/results, unavailable evidence, and applicable cleanup/external state.
5. **Completion:** `Checklist: X/Y complete`; `Incomplete: None` or each `UNPROVEN` item's reason, outcome impact, and exact next action; residual risks and required decisions.

**Skill-specific evidence:** Outcome and source state; requirement-to-unit-to-verification mapping; dependencies, integration, affected boundaries, recovery, estimates when useful, and exact unresolved prerequisites.