name: milestone-close
description: >-
  Closes a tracker milestone: checks its exit criterion, triages its open issues, checks docs
  against code and puts the release in its docs MR. Use when the user asks to close, wrap up or
  review a milestone — "close milestone 4", "is M4 done", "wrap up the dogfood milestone".
argument-hint: <milestone id or title>
---

# milestone-close

Read-only until step 5, except step 2's approved gap issues. The user decides every close, move
and filed issue.

- An edit that lands in the docs MR needs no approval: the user reviews it there, once step 5
  opens the MR.
- Ask only for what leaves the docs MR or changes agent rules: issues, closes, moves, milestones,
  `CLAUDE.md` and `CLAUDE.local.md` lines, and step 4's release proposals.

## 1. Read the milestone

- The milestone is not numbered `M<n>`, `YY.MM` or `v<major>.<minor>` (SemVer past 1.0) → stop
  and tell the user the repo may not be set up for dream-team, naming `setup-dream-team`; check,
  propose or preview no later step.

Milestone description, and its roadmap row if it has one. No measurable exit
criterion → stop and ask for one; a milestone without one cannot close.

The ROADMAP and specs folder are at the paths
`<base directory>/../../references/repo-conventions.md` resolves.

A version milestone's `Gate:` bullet holds its release criteria; check each item there too.

## 2. Check the criterion

Run or read the measurement it names: gate floors, a recorded run, a deployed host. A field-evidence
gate reads its `Evidence:` issue for the deploy, the start date and how to collect.

Not met → report the gap, and propose the gap issues per `scope-issue`, light-tier ones bundled, in
this milestone. The user approves or rejects each; file the approved ones and stop. The milestone
stays open.

A failed kill-gate (the criterion names a redesign) gets no gap issues: report it and stop. The
redesign goes back to the spec.

Outside flow mode, an open headline issue in a version milestone is its own gap; file nothing for
it. Past the ship-by date, or a `YY.MM` milestone's due date, the user picks between moving the
headline to the next version and a new date. A new date for a `YY.MM` milestone renames it to the
new month and moves its due date to that month's last day.

The project `CLAUDE.md` says `Version milestones release in flow mode.` → a version milestone's
criterion is met at its due date, and an open headline is no gap.

## 3. Triage open issues

One table: issue, title, proposed action — close (done or obsolete; cite the commit or reason),
move (target from the tracker's open milestones and the roadmap's `planned` rows; a `planned`
row target → no milestone and `workflow::future`), or blocks-close. The user answers in one reply.
In a version milestone, an open backlog issue defaults to move, to the next version; in flow
mode, so does an open headline.

`Meta:` issues stay out of the table. List each meta issue with a child in
this milestone; tick the boxes of closed children in its description.

- A `Meta:` issue set to this milestone with an open child → it moves with that child.

## 4. Docs check

Collect the docs-MR edits and the proposals; fix nothing yet.

Docs-MR edits, applied in step 5 without asking:

- Architecture doc and diagram against the workspace's component list.
- Specs in the specs folder whose decision the code no longer follows, recorded on a closed issue
  or merged MR → a `Superseded by` status line. No such record → propose it.
- README, `docs/` pages, help text and comments: dispatch `dream-team:docs-reviewer`, told to
  read the milestone's merged diff with `git diff <base>..<head>`, `<base>` the first-merged MR's
  merge base and `<head>` the last-merged MR's merge commit.
- Each 🔴/🟡 `docs-reviewer` finding, as a fix; leave its 🔵 findings out. A finding you judge
  wrong → drop it and name it in the report.
- Roadmap, when the milestone has a row: status of the milestone's merged work, and the row against
  the criterion result. Feature MRs leave roadmap status to this step.
- Root-cause and behaviour sections of the milestone's merged MRs → each fact a future change must
  respect that the contributor doc lacks, as one line.
- The release, outside the two release proposals below: load `ship-it`; its bump as its own
  commit, at the version the project's `CLAUDE.md` or `AGENTS.md` sets each close, else the one
  its Propose step computes, without asking.

Proposals, each approved or rejected by the user:

- Each `planned` roadmap row with no tracker milestone of its title, whose every `Depends on:`
  entry is a closed milestone or this one → propose it as a tracker milestone, numbered with the
  next free `M<n>`, with a `<due date>` and the parked issues that belong to it, in ROADMAP order
  until 3 `M<n>` milestones would be open, this one not counted; it is approved only once the user
  sets its `<due date>`.
- Each project `CLAUDE.md` and `CLAUDE.local.md` line, proposed as a cut when the path or tool it
  names is gone, its only content is one closed issue's artifacts rather than a gotcha, a hook or
  CI enforces it now, a global rule already says it, or a change outside the repo could fix the
  gotcha it works around (a lab host's config, a missing tool, a plugin bug), recommending that
  change.
- Each other `CLAUDE.local.md` line: proposed as a promotion to `CLAUDE.md` when it holds no
  hostname, IP, internal URL or lab access, otherwise left alone.
- A milestone with `MVP` in its title, in a repo whose last release is `0.x` or none → propose
  this month's `<YY.MM>.0`, the first CalVer release, in place of the next `0.x` minor.
- In a SemVer repo, a `v<x.y>` milestone whose major is above the version file's → propose a
  release per `ship-it`'s Propose step, warning that its name says a major release and naming
  both versions.

## 5. Apply

Before any other step 5 action:

- At least one numbered proposal changes `CLAUDE.md` (a cut from it or a promotion) → send the
  held report per Report back, and wait for the user's one reply.
- No such proposal → do not wait for answers; carry on with the rest of step 5 and open the docs
  MR once its edits are committed.
- A proposal the user rejects changes nothing; the docs-MR edits still land in the MR.

The approved closes and moves, through the host's tooling skill; an obsolete close is not planned
and adds `wontfix`, and the `Evidence:` issue closes with the milestone. Step 4's docs-MR edits,
the approved `Superseded by` lines, the approved `CLAUDE.md` cuts and promotions as one MR;
approved promotions and cuts leave `CLAUDE.local.md` directly, since it is untracked. Then close the
milestone and set its roadmap status, if it has a row. Create each approved `planned` row's
milestone per `cut-milestones` step 5, move its parked issues into it without `workflow::future`,
then set the row's `#` and its status `not started` in the docs MR. Every milestone whose
`Depends on:` is now all closed is ready: drop `workflow::future` from its open issues.

- `docs-reviewer` fixes → dispatch `dream-team:docs-editor` in drift mode with
  `git diff <base>..<head>` from step 4 and only the pages they name; its edits go in the docs MR.
- The release, or an approved release proposal → `ship-it` with the version as its argument: its
  bump in the docs MR, its tag message naming the milestone; with nothing else in it, the release
  alone opens the MR.
- The user asks on the docs MR to drop the bump → remove its commit and push no tag.
- A release in the docs MR → once the MR opens, start a Bash `run_in_background` poll, every 30s
  through the host's tooling skill, that exits on `merged` or `closed`, never on "not open".
- Send the report without waiting for the poll, and leave the poll out of it.
- The poll exits `merged` → push the tag and report it in one line; `closed` → push no tag.
- Before the tag: the merged docs MR lacks the bump commit or holds a request to drop it → push
  no tag.

## Report back

Criterion result, issues closed, moved and filed, milestones created, the docs MR link, each
docs fix `docs-editor` reported as `skipped:` or under `gaps:`, and one `**Release:**` bullet:
the version and its tag, or the tag pending the docs MR's merge, or the declined release.

A numbered proposal that changes `CLAUDE.md` is unanswered → send only the held report: criterion
result, step 4's docs-MR edits and the proposals below, with no docs MR link. After step 5 applies
the user's reply, send the full report above, with the link.

Step 4's docs-MR edits: one bullet in the report, each edit named in the docs MR description, or
in the bullet in a held report; never numbered as proposals.

Proposals from step 2 or 4:

- Number them; ask the user to approve them by number.
- A cut that waits on a fix outside the repo → one unnumbered **Outside the repo:** line naming
  the fix; propose the cut once the user reports the fix made.
- Under each, name what approving it does: an issue filed, a milestone created, a line added,
  removed or moved to `CLAUDE.md`, a `Superseded by` line in the docs MR, or a version bump and
  CHANGELOG move in the docs MR.