name: executing-plans
description: >-
  Executing Plans: execute a written implementation plan — load the plan, review it
  critically, execute all tasks in order running the verifications each task specifies,
  and report when complete. Use when you have a written implementation plan to execute in
  a separate session, or when resuming a plan in a fresh session after an agent/tool
  switch (if your agent environment can run plans with subagents, prefer that — this
  skill executes solo). NOT for: verify-only stage completion checks against a spec —
  those only verify and never execute.
slug: executing-plans
version: 1.1.0
displayName: executing-plans
---

# Executing Plans

## Overview

Load plan, review critically, execute all tasks, report when complete.

**Announce at start:** "I'm using the executing-plans skill to implement this plan."

**Note:** Tell your human partner that this workflow works much better with access to subagents (Claude Code, Codex CLI, Codex App, Copilot CLI, and Gemini CLI all qualify). If your agent environment can run plans with subagents, prefer that route over this skill — this skill executes solo.

## The Process

### Step 1: Load and Review Plan
1. Ensure an isolated workspace: if your environment provides a git worktree skill or workflow, use it to create one or verify the existing one; otherwise create or verify an isolated worktree/branch yourself — never assume such a helper is installed
2. Read the plan file; if the session hasn't identified one, ask your human partner for its path — don't assume a location
3. Review critically - identify any questions or concerns about the plan
4. If concerns: Raise them with your human partner before starting
5. If no concerns: Create todos for the plan items and proceed

### Step 2: Execute Tasks

For each task:
1. Mark as in_progress
2. Follow each step exactly (plan has bite-sized steps)
3. Run verifications as specified
4. Mark as completed

### Step 3: Complete Development

After all tasks complete and verified:
- Announce: "I'm finishing the development branch to complete this work."
- If your environment happens to include a branch-finishing skill, prefer following it; otherwise complete the work directly: verify the full test suite passes, present the integration options to your human partner (merge, open a PR, keep the branch, or discard), and execute their choice

## 边界（与 stage-gate 分工）

- **executing-plans**（本技能）：执行计划——逐任务实现 + 提交 + 验证。
- **stage-gate**：阶段完成检查——读 stage-spec DoD 逐条验证（只验不修，交回开发）。
- 顺序：执行完所有任务 → 阶段声称完成时 → 跑 `stage-gate` 验证阶段契约；执行过程中不做门禁，门禁结果不自己修（差异交回开发）。

## When to Stop and Ask for Help

**STOP executing immediately when:**
- Hit a blocker (missing dependency, test fails, instruction unclear)
- Plan has critical gaps preventing starting
- You don't understand an instruction
- Verification fails repeatedly

**Ask for clarification rather than guessing.**

## When to Revisit Earlier Steps

**Return to Review (Step 1) when:**
- Partner updates the plan based on your feedback
- Fundamental approach needs rethinking

**Don't force through blockers** - stop and ask.

## Worked Example

Precondition: a written plan at `plans/add-export-button.md` with 3 tasks, each ending in a runnable verification.

Ask: "Execute the plan at plans/add-export-button.md."

Observable flow:

1. Announce: "I'm using the executing-plans skill to implement this plan."
2. Create or verify an isolated worktree/branch (never main/master without explicit consent).
3. Review the plan. Example concern worth raising before starting: a task says "verify: run `npm test`" but the repo has no `package.json` — that is a critical gap; ask, don't guess.
4. Task by task: mark `in_progress` → follow the steps exactly → run the verification that task specifies → mark `completed`.
5. Completion report excerpt:

```
All 3 tasks complete.
- Task 1: Add ExportButton component — done (tsc passes)
- Task 2: Wire into toolbar — done (npm test: 12 passed)
- Task 3: Update docs — done
Branch: feat/export-button. Next: merge / open a PR / keep / discard — your choice.
```

## Failure Exits

- Plan path missing or never given: ask the human for the path — do not search the repo and pick a candidate file.
- A verification fails and the cause is not clearly your own edit: STOP, show the failing command and its output, and ask. Do not modify the plan, weaken the test, or skip the task.
- A verification needs a tool that is not installed: report exactly which command failed, ask whether to install it — do not install silently.
- Instruction unclear: quote the step, ask one specific question, and wait for the answer.

## Wrong → Right (FAQ)

| Wrong | Right |
|---|---|
| Verifying a stage against a DoD spec instead of executing | That is `stage-gate`'s job (see 边界 above); this skill executes |
| Batching edits for several tasks, then running all verifications at once | One task at a time; its verification runs before it is marked completed |
| Fixing a failing test by changing the test | Stop and ask — verification failures are blockers, not obstacles to route around |
| Starting on main/master "because the plan is small" | Create the isolated worktree/branch first; main only with explicit consent |
| Silently reordering tasks to unblock yourself | Execute in plan order; if the order is wrong, raise it in review (Step 1) |

## Remember
- Review plan critically first
- Follow plan steps exactly
- Don't skip verifications
- Reference skills when plan says to
- Stop when blocked, don't guess
- Never start implementation on main/master branch without explicit user consent