name: requirement-quality-review
description: Use when a requirement, acceptance-criteria set, or change brief needs an evidence-bounded quality review before design or testing; triggers include requirement quality review, requirements quality gate, and requirement completeness review.
---

# Requirement Quality Review

Review requirement completeness, clarity, verifiability, feasibility, scope, and evidence quality from a QA and delivery perspective. Produce traceable gaps, risks, and next actions; this is a quality overview and routing entry point, not a release approval or numeric scorer.

## When to Use

- Before test design, technical design, or planning when requirement quality is uncertain.
- When acceptance criteria look complete but exception paths, constraints, actors, or decision conditions may be missing.
- When a requirement needs routing to ambiguity, consistency, conflict, or traceability analysis.

Do not use it to write test cases, execute tests, approve a release, or assign a quality score from unsupported material.

## Workflow

1. Read and follow `prompts/requirement-quality-review.md`; it defines the audit, quality dimensions, and output order.
2. Inventory supplied requirements, stories, acceptance criteria, change notes, constraints, versions, and evidence. Separate known, missing, conflicting, stale, and out-of-scope information.
3. Rank findings by delivery, quality, and testability impact. Retain source, evidence, status, priority, owner role, and a closeable next action for each finding.
4. Suggest specialist routing by Skill name only. Do not read or link another Skill's internal files and do not turn routing into an installation dependency.
5. With incomplete input, return a minimum usable draft and 3–5 high-value open questions. State a blocker when a safe judgment is impossible.

## Core Constraints

- Keep direct source facts, evidence-backed inferences, recommendations, and Human decisions separate.
- Do not invent business rules, fields, endpoints, thresholds, SLAs, environments, owners, root causes, execution results, or approvals.
- Do not output a universal numeric quality score or infer Go/No-Go from one requirement.
- Use `RQ-##` finding IDs and distinguish `missing`, `ambiguous`, `untestable`, `conflict`, and `unassessed`.
- Every P0/P1 finding needs impact, a suggested owner role, a decision question, and a validation method.

## Progressive Disclosure

- Always read `prompts/requirement-quality-review.md` before producing an assessment.
- Use `evals/eval.yaml` and `evals/cases/` to regress this Skill; Eval files constrain structure and behavior but do not prove runtime quality.

## Pre-delivery Checklist

- [ ] Scope, known facts, missing information, conflicts/staleness, and assumptions are explicit
- [ ] Completeness, clarity, verifiability, feasibility, scope, and evidence quality are assessed separately
- [ ] Findings include source, status, impact, priority, question, owner role, action, and validation method
- [ ] Specialist suggestions, static checks, and document mappings are not presented as execution or approval evidence
- [ ] High-priority questions are assignable and closeable; unsupported areas remain `UNASSESSED`

## Common Pitfalls

- Treating “readable” as “verifiable.”
- Restating the requirement without identifying delivery or testing blockers.
- Filling in absent rules from common practice or hiding missing evidence behind a score.
- Making the final product, engineering, or release decision for a Human.