phaseflow · diff

git:20260930.4f0106a to git:20261012.eb8a384

22 added, 21 removed. Audit A to A.

---
name: phaseflow
description: "项目分步总控。基于 design_doc 和 control_doc 推进 phase/work unit;phase = work unit,每个 phase 可是 feature、issue 或 bug fix;总控读取 Gateflow 的 Gate Order 和 Gate State Machine,自己完成 preflight 和 goal confirmation,然后按固定 gate 顺序派发 Agent 完成具体 plan/implementation/review/fix,裁决结果、更新 control_doc、追踪 residual risk。"
---
# Phaseflow
Phaseflow 是项目分步总控。定义:`phase = work unit`。一个 phase/work unit 可以是 feature、issue、bug fix 或其它单个可交付开发单元。
Phaseflow 只做总控任务;除总控任务外的具体任务必须交给 Agent 完成。用户只和 phaseflow 总控交互,其它 Agent 都通过
phaseflow handoff。
## Inputs
推荐调用:
```text
$phaseflow design_doc=docs/host/design.md control_doc=docs/host/implementation-control.md
```
也接受位置参数:
```text
$phaseflow docs/host/design.md docs/host/implementation-control.md
```
- `design_doc`:设计真源,用于裁决目标、边界、架构、契约、非目标和 review finding。
- `control_doc`:总控真源,用于读取当前 phase/work unit、状态、artifact、commit/PR 信息、residual risks 和 next entry point。
缺少任一文档、路径不明确或无法读取时,先停下来询问。
## Controller Scope
允许亲自做的总控任务:
- 读取 `control_doc`、`design_doc`、artifact、diff、review 结果;
- 读取 Gateflow 的 `Gate Order` 和 gate 规则;
- 识别当前 phase/work unit、当前 gate、next entry point;
- 执行 preflight;
- 执行 goal confirmation;
- 复述当前目标、非目标、约束、风险和下一步;
- 生成交给 Agent 的任务说明;
- 派发 Agent、等待结果、读取结果;
- 裁决 accepted / rejected / deferred / needs-more-evidence findings;
- 更新 `control_doc` 的状态、artifact、commit hash、PR 信息、finding 裁决、residual risk、next entry point;
- 做 branch/status 检查、创建 accepted local commit、记录验证结果等 gate bookkeeping。
必须交给 Agent 的具体任务:
- code-generation-ready plan;
- implementation;
- fix;
- review / re-review;
- aggregate deepreview;
- PR review / re-review;
- source code、tests、migration、schema、配置、运行时行为或产品功能文档修改。
如果具体任务没有可用 Agent 或职责不清,先停下来报告,不要自己补做。
## Startup
启动后先读取 `control_doc`,再按需要读取 `design_doc`,并读取 Gateflow 的 `Gate Order` 和 `Gate State Machine`。首次回复必须包含:
- 当前 phase/work unit;
- 它属于 feature、issue、bug fix 还是其它可交付单元;
- 当前 gate / next entry point;
- Gateflow `Gate Order` 中下一步对应的 gate;
- 将使用的 Agent 派发协议;
- 将派发给哪个 Agent 做下一步具体任务;
- 将如何使用 `design_doc` 和 `control_doc` 裁决结果;
- blocking open questions(如有)。
## Preflight
任何 discussion、plan、派发或文件修改前,phaseflow 总控先执行与 Gateflow 相同的 preflight:
```text
git branch --show-current
git status --short
```
如果当前 branch 是 `main`、`master`、`develop`、`release/*` 或项目定义的 protected trunk branch,先停下来让用户确认创建
工作分支。若 branch、dirty changes 或 scope ownership 不清,也先停下来问用户。
## Goal Confirmation
进入 Gate Order 的 `plan` 前,phaseflow 总控先完成 goal confirmation:
- 读取 `control_doc`、`design_doc` 和相关代码;
- 从第一性原理判断当前 phase/work unit 是否成立;
- 向用户复述目标、动机、成功信号、非目标、scope boundary;
- 说明直接代码证据;
- 说明本轮不会做的过度设计;
- 列出 blocking open questions(如有)。
用户确认后,phaseflow 才能派发 `plan` gate。目标不成立、范围过大、动机不足或关键约束缺失时,先 discussion,不派发具体任务。
## Agent Dispatch
派发前必须写清:
- 当前 phase/work unit;
- 当前 gate;
- `design_doc` 路径;
- - `control_doc` 路径与当前记录版本,以及本 gate 消费的输入 artifact 路径、版本/commit/hash 和相关裁决摘要;
+ - `control_doc` 路径与当前记录版本,以及本 gate 消费的输入 artifact 路径、可取回版本/commit/保存快照与相关裁决摘要;
- Goal Confirmation 中已确认的目标、非目标、success signal 和 scope boundary;
- 从 `control_doc` 提炼出的当前 gate 约束和风险;
- 从 `control_doc` 提炼出的 Slice 切分原则(如有);
- allowed files/modules;
- expected artifact path;
- required validation;
- stop condition;
- completion report format;
- 禁止 commit、push、PR、merge、进入其它 gate,除非当前任务明确要求。
总控按 gate 交接必需输入,不传无关历史;新 Agent 必须能仅凭 prompt 和所指的文件/版本唯一确定目标:
| Agent gate | 必需的可定位输入与身份 |
| --- | --- |
| plan review | 待审 target plan artifact 的路径/版本,以及已确认 goal 与适用的 Slice 原则。 |
| implementation | 已接受 plan 的路径/批准版本、当前 slice ID/对应章节及完整约束、prerequisite 完成证据。两个草稿并存时必须唯一指向已批准者。 |
- | code review / aggregate deepreview | 冻结的代码范围与版本(适用的 base/head、commit 或工作树 diff 身份),以及本 gate 相关的实现 artifact。 |
+ | code review / aggregate deepreview | 冻结的代码范围与版本(适用的 base/head、commit 或工作树 diff 身份),以及本 gate 相关的实现/review/validation artifact 来源版本。 |
| fix / re-review | 来源 review 与裁决 artifact 路径/版本、accepted finding IDs、待修版本;re-review 还需已修版本与修复证据。 |
| PR review | repository、PR number、head/base OID 与需审核的 PR 版本;深挖与收尾按 Deepreview 的 PR 版本核对规则。 |
+ 代码审核 handoff 交接 Gateflow 定义的 slice/aggregate/PR 实质职责、既有验证来源版本及适用性或重验范围;
+ 引用未变事实按 Gateflow Artifacts 规则,不重复交接无关历史,也不以旧 pass 替代当前独立判断。
+
某 gate 的输入尚未产生或版本不可定位时,总控不派发;子 Agent 发现输入缺失、不可访问或身份不符时报告
`blocked` 与缺项,不得选草稿、猜 slice 或自行推进到别的 gate。
Agent/provider 选择与派发协议是两个独立决策。如果用户指定 Agent/provider,就按用户指定;未指定时由 phaseflow 按当前
gate 选择合适 Agent。
派发协议按以下优先级确定:
1. 用户显式要求 `$tmux-agents` / `/tmux-agents` 时,读取并遵循其协议,通过已有 pane 派发;
2. 用户显式要求 `$sub-agents` / `/sub-agents` 时,读取并遵循其协议,通过 runner 子进程派发;
3. 用户未指定派发协议时,默认读取并遵循 `sub-agents`,通过 runner 子进程派发。
协议确定后,当前 phase/work unit 内不得混用或自行切换。默认 runner 不可用或 `sub-agents` 无法执行时,停止并报告
blocker;不得静默回退到 tmux。
总控派发 Agent 后,若有证据表明 Agent 在工作、pane 显示在变化、子进程仍存活或输出文件仍在更新,不得擅自停止该 gate。
并行派发前必须确认 file ownership 不重叠。
## Agent Liveness and Completion
分开记录 Agent 自报的任务状态、派发生命周期和总控的结果验收。Agent 派发后,生命周期默认是 `in-flight`,直到
当前派发协议取得终态证据。耗时长、一次
`wait_idle` 返回、短时间无输出、pane 暂时不变化、或总控主观认为“这个任务不应该这么久”,都不是完成、失败、卡死或中断
Agent 的证据。
runner 子进程路由须遵守 Sub-agents 的 Result Validation:收集托管句柄的进程退出码、runner 结构化终态、stderr、
最终消息和必要 artifact,再由总控裁决结果。final message、artifact 存在或 Agent 自报 `completed` / `blocked` /
`failed` 只是候选任务状态;句柄仍存活时不得视为 gate 返回。即使先看到 final message,随后 runner 收尾退出非零,
也必须按实际终态和证据处理,不能提前推进。
tmux 长驻 CLI 路由按 Tmux-agents 的 pane completion 协议,以 capture 中明确的完成/阻塞/失败证据、artifact 与
validation 核对任务返回;不要求 CLI 进程退出。用户明确要求停止时,先完成相应协议的中止/终态收集,
再记录停止结果。两种路由都必须在总控验收后才能更新 gate。
在 Agent 仍为 `in-flight` 时,phaseflow 不得 clear pane、终止子进程、发送新任务覆盖原任务、重派同一 gate、接管具体任务、
修改 current gate / next entry point、或进入下一个 gate。
如果总控怀疑 Agent 长时间无进展,只能做非破坏性检查:capture pane、读取已有 artifact、或询问 Agent status。status probe
不得改变 Agent 当前任务,不得包含新任务,不得要求 Agent 停止;自报 blocked / failed / completion 只记录为候选任务状态,
仍须按所选协议取得终态证据,未取得时继续等待。
## Slice Principle Handoff
如果 `control_doc` 中有 Slice 切分原则,phaseflow 必须在进入 `plan` gate 前读取并提炼它。不得在 `control_doc`
未定义 Slice 切分原则时编造固定 slice 数量、固定阈值或额外切分规则;此时仅按 Gateflow 的 plan / slice gate 要求执行。
当 `control_doc` 中存在 Slice 切分原则时:
- 派发 `plan` gate 时,必须把 Slice 切分原则作为 planning constraints 写入 Agent 任务说明;
- plan artifact 必须说明 implementation slice 数量、切分依据,以及是否符合该 Slice 切分原则;
- 如果 plan 的 implementation slices 超过 `control_doc` 中定义的建议上限或阈值(例如 3 个),plan artifact 必须说明为什么不能合并或减少;
- 派发 `plan review` gate 时,必须把 `control_doc` 中的 Slice 切分原则和具体阈值(如有)列为 checklist 项;
- 通用 slice 数量、机械切分和 gate 成本审查由 Gateflow / Planreview 规则定义,phaseflow 只负责传递 `control_doc`
中的项目级覆盖约束,不另行定义额外阈值。
## Gate Order Dispatch
phaseflow 必须读取 Gateflow 中 `Gate Order` 和 `Gate State Machine` 定义,并按其中固定顺序总控当前 phase/work unit。
不要把整个 work unit 交给其它 Agent 启动完整 Gateflow;phaseflow 自己维护 current gate,并逐 gate 派发具体任务。
- 以读取到的 Gateflow `Gate Order` 为准;当前定义为:
+ 以读取到的 Gateflow `Gate Order` 为准;方括号内的 fix/re-review 仅在有实际修复时执行:
```text
goal confirmation
-> plan
-> plan review
- -> fix
- -> re-review
+ -> [fix -> re-review]
-> accepted plan commit
-> implementation
-> code review
- -> fix
- -> re-review
+ -> [fix -> re-review]
-> accepted slice commit
-> aggregate deepreview
- -> fix
- -> re-review
+ -> [fix -> re-review]
-> accepted deepreview commit
-> ready-to-open-draft-PR
-> push
-> create draft PR
-> PR review
- -> fix
- -> re-review
+ -> [fix -> re-review]
-> accepted PR review commit
-> push
-> draft-PR-pass
-> final closeout
```
`plan review` gate 必须使用 `planreview` skill;`code review`、`aggregate deepreview` 和 `PR review` gates 必须使用 `deepreview` skill。
`final closeout` gate 在下方 `## Gate: final closeout` 定义。不得把 `draft-PR-pass` 当作 phase/work unit 完成;必须继续执行
`final closeout` gate。
多 slice 时重复:
```text
- implementation -> code review -> fix -> re-review -> accepted slice commit
+ implementation -> code review -> [fix -> re-review] -> accepted slice commit
```
每次派发 Agent 的任务说明只包含该 gate 所需的信息:
- work unit 名称和类型;
- `design_doc` 路径;
- Goal Confirmation 中已确认的目标、非目标、success signal、scope boundary、约束和风险;`plan` / `plan review` gate
还必须包含从 `control_doc` 提炼出的 Slice 切分原则(如有);
- current gate;
- `control_doc` 路径/当前版本与本 gate 消费的 artifact 身份,按上方 Agent Dispatch 表逐项交接;
- allowed files/modules;
- accepted findings(fix / re-review gate)及其来源裁决和待修/已修版本;
- expected artifact path;
- - required validation;
+ - required validation 与适用的证据版本/复用或重验范围;
- stop condition;
- completion report format;
- 禁止 commit、push、PR、merge、进入其它 gate,除非当前 gate 明确要求。
每个 Agent 按所选协议取得终态后,phaseflow 读取 artifact,裁决结果,更新 `control_doc`,再进入下一个 gate。
派发 `plan` / `plan review` gate 时,必须明确说明 Goal Confirmation 是 binding scope contract。plan 不得新增
Goal Confirmation 未确认的目标、验收标准、设计强化或 future-slice work;plan review 必须把 goal drift / scope creep
作为 checklist 项。若发现 confirmed goal 之外的风险或改进机会,只能记录为 residual risk / deferred follow-up /
open question,或停止并要求重新确认 goal。
## Gateflow State Machine Execution
Gateflow 定义通用 gate state machine;phaseflow 负责执行它,并把状态写回 `control_doc`。
用户确认 goal confirmation 后,除非遇到 Gateflow `Gate State Machine` 定义的 stop condition,phaseflow 必须持续按
Gate Order 推进,直到当前 phase/work unit 到达 `final closeout pass`。
每个 gate 完成后,phaseflow 必须立即:
1. 读取 gate artifact / validation / decision;
2. 裁决 findings 和 residual risks;
3. 更新 `control_doc` 中当前 gate 的 artifact、decision、validation、finding 状态和 residual risk;
- 4. 将 `control_doc` 的 current gate / next entry point 写成 Gate Order 中下一个未完成 gate;
+ 4. 将 `control_doc` 的 current gate / next entry point 写成 Gate Order 中下一个未完成的适用 gate;
5. 继续执行总控 gate,或派发下一个具体 gate 给 Agent。
- `control_doc` 的 current gate / next entry point 必须表示下一个未完成 gate,而不是刚完成的 gate。不得 invent、skip、
- collapse 或 reorder gates。PR gate chain 必须遵守 Gateflow `Gate State Machine` 的状态不变量;`create draft PR`
+ 所有 review loops 按 Gateflow 的全部通过条件裁决;无需实际 fix 时记录 pass -> 对应 accepted commit,有实际修复才派发
+ fix -> re-review。真实 blocker、未解决 `needs-more-evidence` 或不足/失效证据保持当前 gate,accepted 列表为空不能放行。
+ `control_doc` 的 current gate / next entry point 必须表示下一个未完成的适用 gate,而不是刚完成的 gate。不得 invent、skip、
+ collapse 或 reorder 必需或适用 gates;不执行条件不成立的 fix/re-review 不属于 skip。PR gate chain 必须遵守 Gateflow 状态不变量;`create draft PR`
成功后,`control_doc` 必须进入 `PR review`,不得写成 `draft-PR-pass`。
## Judgment
裁决 plan、review finding、fix scope、defer decision 和 residual risk 时,优先依据:
- `design_doc` 的设计目标;
- `control_doc` 的当前 phase 目标和 success signal;
- 项目内最佳实践;
- 当前 phase 的 scope、约束和非目标;
- 不引入过度设计。
每个 finding 必须裁决为且只裁决为:
- `accepted`
- `rejected-with-reason`
- `deferred-with-owner`
- `needs-more-evidence`
每个裁决必须能说明:为什么这是当前 phase 的最佳实践选择。
## Control Doc Updates
每个关键点都要更新或准备更新 `control_doc`:
- - plan/re-review 通过后:plan artifact、plan review artifacts、accepted plan commit hash;
+ - plan review(有修复时含 re-review)通过后:plan artifact、plan review artifacts、accepted plan commit hash;
- 每个 slice commit 后:slice 状态、artifact、review 结论、commit hash、未覆盖项;
- - aggregate deepreview/re-review 通过后:aggregate review artifact、accepted deepreview commit hash;
+ - aggregate deepreview(有修复时含 re-review)通过后:aggregate review artifact、accepted deepreview commit hash;
- ready-to-open-draft-PR 前:draft PR readiness、剩余风险、owner、后续 phase/work unit destination;
- final closeout gate:按 `## Gate: final closeout` 写入 draft PR、review、commit、risk、issue、final closeout summary、
final closeout pass、completion 和 next entry point 状态。
如果 `control_doc` 没有合适位置记录这些内容,先提出具体写入位置或结构。
## Gate: final closeout
`draft-PR-pass` 后,phaseflow 不得直接结束。必须先执行 `final closeout` gate。
`final closeout` 是总控任务,由 phaseflow 自己完成,不派发给 Agent。缺少必须 artifact、issue 状态需要外部授权,或
`control_doc` 没有合适位置记录结果时,停止并询问用户。
`final closeout` gate 必须按顺序完成:
1. 重新读取 `control_doc`,确认当前 phase/work unit、当前 gate、draft PR URL、PR review artifacts、accepted PR review
commit hash、follow-up push 状态和 next entry point。
- 2. 读取 review artifacts、fix artifacts 和 finding 裁决记录;如 final closeout summary 尚不存在,由 phaseflow 创建。
+ 2. 读取 review artifacts、实际修复的 fix artifacts 和 finding 裁决记录;如 final closeout summary 尚不存在,由 phaseflow 创建。
3. 汇总 what changed、what was verified、docs updates、finding status、draft PR URL。
4. 执行 residual risk reconciliation:收集所有 remaining risks,确认每项都有 owner 和 destination。
5. 更新 `control_doc`:draft PR URL、PR review artifacts、accepted PR review commit hash、follow-up push 状态、remaining
risks / owners、final closeout summary、final closeout pass、当前 phase/work unit completed 状态、issue 关联/评论/关闭预期
(如当前 work unit 是 issue)、next entry point。
6. 如果当前 work unit 是 issue,确认 PR body 已关联 issue、issue closeout comment 已添加,并在 `control_doc` 记录 merge 后是否会通过
closing keyword 自动关闭。只有项目流程明确要求手动关闭且用户授权时,才手动 close issue。
7. 确认 next entry point 指向用户 merge 当前 PR 后可以直接进入的下一个 phase/work unit。
8. final closeout 输出必须说明:用户 merge 当前 PR 后,应从目标 base branch 拉取最新代码,再用 `control_doc` 的 next
entry point 启动下一轮 phaseflow。
存在以下任一情况时,不得关闭 phase/work unit 或输出 final closeout pass:
- 缺少必须 artifact;
- accepted finding 没有最终状态;
- residual risk 没有 owner/destination;
- `control_doc` 未记录 draft PR / review / commit / risk / issue / final closeout summary / final closeout pass / completion /
next entry point 状态;
- issue work unit 的 issue 状态未处理,或处理需要用户授权;
- next entry point 不明确,或没有指向 merge 当前 PR 后可继续进入的下一个 phase/work unit;
- final closeout 输出未说明 merge 当前 PR 后如何从 base branch 和 `control_doc` next entry point 继续下一轮 phaseflow。
## Residual Risk Reconciliation
`final closeout` gate 内必须执行 residual risk reconciliation:
- - 收集 final closeout、review artifacts、fix artifacts 和裁决记录中的 residual risks;
+ - 收集 final closeout、review artifacts、实际修复的 fix artifacts 和裁决记录中的 residual risks;
- 为仍存在的 residual risk 写入 owner、destination、后续 phase/work unit、issue 或 user decision;
- 删除已 close 的 residual risk;
- 对已解决但尚未 close 的 residual risk,关闭或标记已解决;
- 如果当前 work unit 是 issue,确认 issue 已关联 draft PR、已有 closeout comment,并记录 merge 后关闭预期;只有项目流程明确要求手动关闭且用户授权时,才手动 close issue;
- 确认 next entry point 指向用户 merge 当前 PR 后可以直接进入的下一个 phase/work unit。
存在没有 owner/destination 的 residual risk 时,不得关闭 phase/work unit。
## Resume
每次 resume、上下文压缩后继续、Agent 返回、review loop 结束、进入新 gate 或准备修改文件前,先恢复状态:
- 重新读取或确认 `control_doc` 中的当前 phase/work unit;
- - 确认 current gate 和 next entry point 指向 Gate Order 中下一个未完成 gate,而不是刚完成的 gate;
+ - 确认 current gate 和 next entry point 指向 Gate Order 中下一个未完成的适用 gate,而不是刚完成的 gate;
- 判断下一步是总控任务还是具体任务;
- 总控任务自己做并写回 `control_doc`;
- 具体任务派发给 Agent。