band ยท diff
v0.1.0 to v0.1.0
1 added, 1 removed. Audit A to A.
---
name: band
description: Prepare VASP band-structure workflow inputs from existing SCF context and user-specified band-path settings. Use when the user requests electronic band-structure calculations and needs explicit prerequisite checks, line-mode KPOINTS path setup, and stage-specific INCAR preparation.
compatibility: Requires prerequisite SCF context and valid VASP pseudopotential resources/license in the target environment.
- license: MIT
catalog-hidden: true
+ license: LGPL-3.0-or-later
metadata:
author: qqgu
version: 0.1.0
repository: https://vasp.at/
---
# VASP Band Preparation (Subskill)
## Scope
This skill prepares band-structure-stage input tasks only.
It should:
- verify prerequisite SCF context is available
- generate line-mode/high-symmetry-path `KPOINTS`
- prepare stage-appropriate INCAR settings
- report assumptions and unresolved choices
It should not submit or execute jobs.
## Prerequisites
Require explicit prior SCF context and a clear crystal/path convention for band calculation.
If prerequisites are missing, stop and ask for them.
## Must provide
- source SCF context path
- crystal/path convention (or explicit k-path)
- band intent and output expectations
- key electronic/smearing policy for the band stage
## Usually should be explicit
- line-mode path source and tolerance
- `ISMEAR` policy for band stage
- `LORBIT` and projection-related options when requested
## Expected output
1. band-stage task directory/input updates
1. generated line-mode `KPOINTS` summary
1. prerequisite check summary
1. settings summary and assumptions
1. handoff note to `dpdisp-submit` if execution is requested