# Test-Driven Development

TDD is a sequence of small red → green → refactor cycles. Each cycle must make the intended behavior executable, demonstrate that the check fails for the intended reason, and leave the affected path in a production-quality shape. The resulting tests must be worth keeping.

When exploring the codebase, read `CONTEXT.md` (if it exists) so test names and interface vocabulary match the project's domain language, and respect ADRs in the area you're touching.

## What a good test is

Tests protect a meaningful contract through an interface or observation that can detect a realistic regression. Prefer tests that survive implementation-only refactors of that contract. A test such as "user can checkout with valid cart" explains the capability it protects; changing the contract itself may legitimately require changing its tests.

See [tests.md](tests.md) for examples and [mocking.md](mocking.md) for mocking guidelines.

## Seams: where tests go

A **seam** is a boundary where a test exercises behavior or controls a dependency. It may be a public API or an internal interface owned by a module. An internal module can have its own contract and meaningful tests without exposing that interface to application callers. Do not bypass encapsulation merely to assert on incidental private state.

Before writing a test, name the behavior and the realistic failure it should catch, then choose where to call the code or control its dependencies. Prefer existing interfaces and nearby test conventions. Use an internal interface when its tests catch important failures that other tests would miss. Do not expose private state or add an abstraction just to make a test easier to write. Ask only when the choice would change the agreed scope or a contract.

Testing effort should land on critical paths and complex logic rather than every edge case.

When the shape of the interface is itself in question—how deep the module is, where the seam belongs, or what the interface should expose—use the `codebase-design` skill for the shared module and seam vocabulary.

## Anti-patterns

- **Implementation-coupled**: asserts incidental private state, helper calls, or ordering that the tested contract does not promise. Internal tests, collaborator doubles, and direct database observations are not inherently coupled; judge whether they detect a real contract failure or merely freeze the implementation's shape.
- **Tautological or non-independent expectations**: an assertion that derives its expected value from the result under test cannot provide independent evidence. Copying production logic into the expected-value calculation can also reproduce the same bug. Use expectations grounded independently in the contract, a worked example, or a trusted oracle; a calculated expectation is not automatically tautological.
- **Writing all tests before any implementation:** this can commit the tests to a design before trying it in working code. Write one test, implement its behavior, and use what you learn to choose the next test.

## Feature cycle

Work in vertical slices:

1. Choose the smallest observable behavior at an established or agreed seam.
2. Write one focused test that specifies that behavior.
3. Run it before changing production code. Confirm that it fails because the behavior is missing, not because the test is broken.
4. Make the simplest production-quality change that passes the test without adding future behavior. Extract a focused module when it makes responsibilities clearer, even if it has only one caller.
5. Rerun the test and confirm that it passes.
6. Refactor the affected path when needed to preserve clear ownership and cohesion, then confirm the test still passes.
7. Repeat with the next behavior, allowing each cycle to inform the next.

## Bug-fix cycle

When a bug has a clear, practical regression path:

1. Identify the intended behavior, current behavior, affected path, and smallest observable reproduction.
2. Choose the narrowest executable check already used near that codepath.
3. Add the smallest focused regression test that would have caught the bug.
4. Run it before fixing the implementation. Confirm that it fails for the intended reason; correct the test or reproduction if it passes or fails for an unrelated reason.
5. Make a focused production-quality change that restores the intended behavior while preserving nearby contracts and clear ownership.
6. Rerun the regression test, then run relevant adjacent tests, type checks, lint, or scenario checks in proportion to the change's risk.

### When a failing test is impractical

Do not create substantial test infrastructure, brittle mocks, slow end-to-end setup, production-only state, or broad fixture churn merely to satisfy the workflow. Prefer no new test over a test with weak or misleading signal.

Before fixing the bug, explain why a permanent regression test is not worth its cost and choose a check that can demonstrate the failure and the fix. This may be a script, manual command, browser workflow, log assertion, or integration check. It must exercise the broken behavior, not merely nearby code that already works.

## Validation cadence

Within each red → green → refactor cycle, run the focused check and any adjacent checks affected by the current change. Run broader validation when a shared contract, integration risk, failure, or repository rule makes it necessary, not automatically after every slice.

At completion, satisfy applicable repository checks and meaningful regression coverage. Reuse results that still cover the final implementation and relevant conditions; rerun only invalidated or failed checks unless a repository rule requires otherwise. Do not repeat a full suite, build, or lint pass merely to mark another cycle complete.

## Guardrails

- **Red before green.** Write the failing test first, then implement the current behavior completely. Don't anticipate future tests or add speculative features.
- **One behavior at a time.** Keep each cycle focused on one coherent contract change. Use the observations and dependency controls needed to prove it without batching unrelated behavior into the same cycle.
- Do not change tests merely to match an incorrect implementation.
- Do not weaken existing assertions unless the intended behavior has genuinely changed and the reason is clear.
- Keep a regression test focused on the reported bug; avoid unrelated coverage expansion or fixture churn.
- If a bug is flaky, make the regression signal deterministic where practical and state what signal is being locked down.
- If a bug exposes a broader class of failures, establish the focused regression path first, then consider sibling coverage.
- **Refactor after green when the changed path needs it.** Preserve clear ownership and cohesion before starting the next slice. Keep the refactor within the affected behavior; do not turn the cycle into unrelated cleanup.

## Final response

Report the evidence, not only the outcome:

- Name the failing-before test or executable check and the failure it produced.
- Name the passing-after test run and any nearby validation performed.
- If failing-before evidence could not be demonstrated, state why and describe the closest regression check used instead.