code-subagents · git:20260727.3faefd4 · 2026-07-27 · sha256 abdc7e46ac0a1ffe
code-subagents git:20260727.3faefd4A
Immutable. This exact content never changes and is served at /api/v1/blob/abdc7e46ac0a1ffe.
--- name: code-subagents description: > Subagent dispatch patterns for approved Inline Plans and Spec-backed Plans. Use when spec-implement has independent work to dispatch and subagents are available. Covers parallel dispatch for independent work, the two-stage review cycle (plan compliance then code quality), focused prompt construction, and integration of results. Trigger when executing plan tasks with subagent support, when facing 2+ independent problems, or when the user asks to use subagents for implementation. user-invocable: false --- # Spec Subagents Fresh subagent per task. Two-stage review after each. Parallel when independent, sequential when dependent. ## When to Use Subagents **Use when:** - Executing plan.json tasks with subagent support available - Executing independent Inline Plan changes when each subagent receives the full approved plan - 2+ independent tasks that don't share state or files - Each problem can be understood without context from others **Don't use when:** - Tasks are tightly coupled (editing the same files) - You need to understand full system state across tasks - Failures are related (fixing one might fix others) - Exploratory work where the problem isn't well-defined yet ## Dispatch Modes ### Sequential (dependent tasks) Tasks with dependencies execute one at a time. Each gets a fresh subagent — no context pollution from previous tasks. ``` Task 1 (Entity) → review → complete Task 2 (Repository, depends on T1) → review → complete Task 3 (Service, depends on T2) → review → complete ``` ### Parallel (independent tasks) Independent tasks dispatch simultaneously. One agent per problem domain. ``` Task A (auth tests) ──→ review → complete Task B (billing tests) ──→ review → complete ← concurrent Task C (notification tests) ──→ review → complete ``` **Independence check:** Would fixing Task A affect Task B? Would they edit the same files? If no to both, dispatch in parallel. --- ## Prompt Templates Use these templates when dispatching subagents. Each template is battle-tested — don't improvise, use them as-is and fill in the variables. - **[references/implementor-prompt.md](references/implementor-prompt.md)** — Dispatch an implementer. Includes self-review checklist. - **[references/spec-reviewer-prompt.md](references/spec-reviewer-prompt.md)** — Plan compliance review. "Do not trust the report." - **[references/code-quality-reviewer-prompt.md](references/code-quality-reviewer-prompt.md)** — Code quality review. Critical/Important/Minor severity. ### Prompt quality rules - **Focused** — one task, one problem domain - **Self-contained** — all context needed is in the prompt. Provide the full plan.json task or the complete approved Inline Plan; do not make the subagent recover planning context - **Specific about files** — exact paths, not "the relevant files" - **Specific about output** — what should the subagent return? - **Constrained** — what should they NOT touch? ### Common mistakes | Mistake | Fix | |---------|-----| | "Fix all the tests" | "Fix the 3 failures in user.test.ts" | | No context about codebase | Paste the relevant patterns and conventions | | No constraints | "Do NOT change production code" or scope to specific files | | Vague output expectations | "Return: root cause, changes made, test results" | --- ## Two-Stage Review Every completed task or coherent inline change gets two reviews in order. Do not skip either. Do not reverse the order. ### Stage 1: Plan Compliance Does the implementation match what was specified? ```markdown ## Plan Review Review the implementation against the task specification: **Approved requirements:** [paste the plan.json task or complete Inline Plan] **Files changed:** [list from subagent output] Check: 1. Are all requirements from the task spec implemented? 2. Is anything implemented that wasn't specified? (over-building) 3. Do tests cover the specified acceptance criteria? 4. For spec-backed work, does the implementation match design.md? Report: List any gaps or extras. Mark ✅ if compliant, ❌ if not. ``` If the plan reviewer finds issues → the implementer subagent fixes them → plan reviewer reviews again. Repeat until ✅. ### Stage 2: Code Quality Is the implementation well-built? ```markdown ## Code Quality Review Review the implementation for code quality: **Files changed:** [list] Check: 1. Does the code follow existing patterns and conventions? 2. Are tests meaningful (not just asserting true)? 3. Is there unnecessary complexity? 4. Are edge cases handled? 5. Is the code clean (no dead code, no unnecessary comments)? Rate issues as Critical (blocks merge), Important (should fix), or Minor (nice to have). ``` If the quality reviewer finds Critical or Important issues → implementer fixes → reviewer reviews again. Minor issues can be noted and moved past. ### Why this order matters Plan compliance first because there's no point polishing code that doesn't meet the approved plan. Quality second because compliant code still needs to be well-built. --- ## Handling Subagent Questions Subagents may ask questions before or during implementation. This is good — it means they're thinking rather than guessing. - Answer clearly and completely - Provide additional context if needed - Don't rush them into implementation - If the question reveals a gap in the plan, that's valuable — note it --- ## Integrating Results After subagents complete (especially parallel dispatch): 1. **Read each summary** — understand what changed 2. **Check for conflicts** — did any agents edit the same code? 3. **Run full test suite** — verify all changes work together 4. **Update task tracking** — for spec-backed work with a tracker, mark tasks complete; Inline Plans create no tracker entries If there are conflicts between parallel results, resolve them manually. Don't dispatch another subagent to merge — that requires too much context. --- ## When Subagents Fail If a subagent fails a task: - **Don't fix it manually** — that pollutes your context - **Dispatch a fix subagent** with specific instructions about what went wrong - **If it fails twice**, stop and escalate to the human. The plan may need revision. If failure reveals a Spec-backed Plan design problem: > "This task is failing because [reason]. The design in design.md may need to change. > Want me to go back to spec-brainstorm?" If Inline Plan work develops substantial design or coordination needs, return to `spec-orchestrator` and propose promotion to a Spec-backed Plan.