name: sprint-plan
description: Make sure to use this skill whenever the user mentions sprint planning, starting a sprint, "what's our next sprint", /sprint-plan, committing scope, scoping a development cycle, or wants to pull triaged backlog items into a time-boxed batch of plans. Reads the backlog Triage Panel + REFACTORING.md Kill List, confirms capacity with the user, writes .devops/sprints/sprint-{n}-<slug>/sprint.md, moves committed plans into that folder as the sprint queue, and registers the row in SPRINTS.md. This skill PLANS a sprint — it does NOT execute parcels (that is @pass-the-parcel) or close them (@sprint-close).
- version: 2
- updated: 2026-09-13
+ version: 3
+ updated: 2026-09-14
---
# Sprint Planning
> **Boundary:** This skill scopes and commits a sprint. It produces `.devops/sprints/sprint-{n}-<slug>/sprint.md` plus the committed plan files in that folder, and registers the sprint in `SPRINTS.md`. It does not run parcels, write code, or close sprints. Execution happens later via `@pass-the-parcel`, one claimed plan at a time.
## Prerequisites — Read First
1. `.devops/backlog/SPRINTS.md` — confirm no other sprint is currently ACTIVE (one active sprint rule). If one is open, STOP and tell the user to close it with `@sprint-close` first.
2. `.devops/backlog/backlog-index.md` — the 🎯 Triage Panel (🔴 NOW / 🟡 NEXT / 🟢 LATER tiers) and the Themes table linking the `t{n}-<slug>-backlog.md` registers.
3. `.devops/backlog/REFACTORING.md` — the Current Scan Results / Kill List (only if refactoring is in scope).
4. Last 3 entries of `.devops/logs/agent-changelog.md` — establish current project state.
## 1. Determine Sprint Number & Name
- Next number = highest existing `.devops/sprints/sprint-{n}-*` folder + 1 (or 1 if none). The integer is kept for tooling; the slug carries the theme.
- Propose a short human slug from the dominant theme of the items being pulled (e.g. `stabilise-and-clean`, `import-hardening`). The folder becomes `sprint-{n}-<slug>`. Confirm with the user.
## 2. Establish Capacity (question tool)
Ask the user for the sprint's capacity budget in effort points using the `question` tool. Offer calibrated defaults:
- **Small** (~5 pts) — a focused week, few plans
- **Standard** (~8-10 pts) — typical cycle
- **Large** (~13+ pts) — big push / stabilisation sprint
If this is sprint 1, note that capacity is uncalibrated and recommend starting conservative. Future sprints read the last `sprint.md` retro's "capacity accuracy" line to suggest a number.
## 3. Pull Candidate Scope
Present candidates grouped by source, each with its point size (estimate S=1/M=3/L=5/XL=8):
| Source | Rule |
|--------|------|
| 🔴 NOW items | Always offered first. Cannot be deferred without an explicit user ruling recorded in `sprint.md`. |
| 🟡 NEXT items | Offered next. These are the default body of a normal sprint. |
| Carry-forward | From the previous `sprint.md` retro's carry-forward list, if any. |
| 🟢 LATER / Kill List | Offered ONLY if capacity remains, or if the user declares this a stabilisation sprint. |
Let the user select which candidates commit (multi-select). Respect the capacity budget — warn if selected points exceed it and ask whether to trim or expand.
## 4. Apply the Boundary Check
For every candidate, confirm it belongs in a *feature* sprint vs *refactoring*:
- Changes user-visible behavior → feature sprint (this skill).
- Only changes internal structure → REFACTORING.md; include only as spare-capacity/stabilisation work.
Flag any misfiled item and ask the user before committing it.
## 5. Write sprint.md
Create `.devops/sprints/sprint-{n}-<slug>/sprint.md` from the template below. Fill every placeholder. The out-of-scope section is mandatory — it is what prevents mid-sprint scope creep. The Committed Scope table is the **queue**: it lists what is committed, and each row links to the plan file that now lives in this folder.
+
+ **Chunked write (mandatory):** `sprint.md` is large — do NOT send it in one `write`. Create it with a small skeleton `write` (frontmatter + the `##`/`###` section headings, each with a unique placeholder such as `<!-- FILL:goal -->`), then fill each placeholder with its own small `edit`. Cap each call at ~60–100 lines; split a long section with sub-placeholders if needed. `write` overwrites, so never re-issue the whole file — after a stall, `read` what landed and continue with the next section. See AGENTS.md, Chunked Write Discipline.
### Template: `.devops/sprints/sprint-{n}-<slug>/sprint.md`
```markdown
---
type: "sprint"
sprint: {n}
name: "{Sprint Name}"
slug: "{kebab-slug}"
status: "open"
capacity_points: {total}
created: "{YYYY-MM-DD}"
closed: ""
---
# Sprint {n}: {Sprint Name}
## Goal
{One sentence: what will be true at the end of this sprint that isn't now.}
## Capacity
- Budget: {points} pts ({Small/Standard/Large})
- Committed: {points} pts across {count} plans
- Buffer: {remaining} pts held for spillover / discovery
## Committed Scope (queue)
| # | Code | Plan | Size | Source tier | Link |
|---|------|------|------|-------------|------|
| 1 | {T..} | {title} | {S/M/L} | 🔴 NOW | [{code}-{slug}-plan.md]({code}-{slug}-plan.md) |
## Explicitly Out of Scope
{List the tempting-but-not-now items, each with a one-line reason. This is the anti-scope-creep contract.}
## Definition of Done (sprint-level)
- [ ] All committed parcel plans reach COMPLETE and are archived
- [ ] Full test suite green, lint clean, build exit 0
- [ ] Sprint closed via @sprint-close (retro appended to this file + spaghetti scan run)
## Risks / Unknowns
{Anything that could blow up a plan's estimate this sprint.}
```
## 6. Move Committed Plans into the Queue
For each committed item:
1. `git mv` its parked plan from `.devops/backlog/<code>-<slug>-backlog.md` (legacy: `.devops/backlog/<slug>-backlog.md`) to `.devops/sprints/sprint-{n}-<slug>/{code}-{slug}-plan.md` — the move is the signal that it is committed.
2. Add/replace the claim front-matter at the top of the moved file (`code`, `sprint: sprint-{n}-<slug>`, `claim_status: QUEUED`, `touches`, `depends_on`). Leave `owner` / `claimed_at` / `last_touch` empty until claimed. See `.devops/rules/plan-lifecycle.md` § Claim Front-Matter.
3. Remove the item from the Triage Panel in `backlog-index.md` (it is tracked by the sprint now).
If a committed item has no plan file yet, tell the user to create it with `@backlog` first — do not hand-write an empty plan.
## 7. Register in SPRINTS.md
Add a row to the Sprint Index table in `.devops/backlog/SPRINTS.md`: number, name, goal, status `🟢 ACTIVE`, sprint link `.devops/sprints/sprint-{n}-<slug>/sprint.md`, retro link `—`. Update `last_sprint`.
## 8. Hand Off
Tell the user the sprint is committed and how to start executing: the queue lives in the sprint folder; claim the next eligible plan per the Claim Protocol and run `@pass-the-parcel` on it. Remind them that completing all plans triggers `@sprint-close`.