planr-sync · git:20261004.db8c0b9 · 2026-10-04 · sha256 dd758dfe6e080fb5
planr-sync git:20261004.db8c0b9A
Immutable. This exact content never changes and is served at /api/v1/blob/dd758dfe6e080fb5.
--- name: planr-sync description: Audit OpenPlanr planning artifacts for graph and protocol drift. Use when statuses, references, schemas, or generated planning views may be inconsistent. license: MIT --- # OpenPlanr Sync Reconcile local planning artifacts and, when requested, GitHub or Linear state. Reason about conflicts in this active session; deterministic mapping and GitHub transport may use a host connector or the packaged [sync helper](scripts/sync.mjs). Local and GitHub work never require the OpenPlanr CLI. Resolution order: 1. use a host-native GitHub or Linear connector when available; 2. otherwise, for GitHub, use the packaged deterministic helper; 3. otherwise, for Linear, use the `planr linear` terminal utility when the user has installed it; `planr github` and `planr sync` are optional equivalents for the rest. Linear through the CLI: - the user runs `planr linear init` in a terminal once; it prompts for a personal access token, which the CLI stores; - audit with `planr linear sync --dry-run`, which reads Linear without writing; - before a real `planr linear sync`, ask how conflicts should resolve and pass `--on-conflict local` or `--on-conflict linear`; without a prompt it favors Linear; - `planr linear push <artifact-id>` creates or updates Linear issues; preview with `--dry-run`. Quick tasks and backlog items need `linear.standaloneProjectId` in the project config when no terminal prompt is available. Audit is read-only by default. Apply local changes only when the request asks for reconciliation, and push remote changes only when the request asks for external synchronization. If credentials are unavailable, complete local reconciliation and report only the external step that could not run. ## Return Lead with what is aligned, repaired or still blocked. Summarize aligned, locally repairable, conflict and unavailable counts; link changed paths or remote items by purpose. State what was actually validated or synchronized and distinguish local success from an unavailable remote step. Give each material conflict its impact and recovery action, with one most useful next step. Keep full mapping and diagnostics in their existing records. Different chat wording never causes a second synchronization or a corrective run. When the OpenPlanr dashboard is running, the reconciled graph is browsable at `#/overview` and recent changes at `#/activity`. This is navigation only.