nasa-hsi · git:20260619.623f0b4 · 2026-06-19 · sha256 426b8f3effd4aeaf
nasa-hsi git:20260619.623f0b4A
Immutable. This exact content is served forever at /api/v1/blob/426b8f3effd4aeaf.
--- name: nasa-hsi description: "Knowledge base from NASA Human Systems Integration (HSI) Practitioner's Guide (NASA/SP-2015-3709). Use for HSI process implementation, lifecycle phase activities, function allocation, ConOps development, HSI Plan writing, HSI metrics (MOE/MOP/TPM/KPP), HITL testing strategy, HSI team organisation, scaling/tailoring for program size, and V&V planning. Does not cover the specific human engineering design standards (NASA-STD-3001 content) or detailed HFE methods beyond what the guide itself provides." --- <!-- argument-hint: [topic, phase, or chapter number] --> # NASA Human Systems Integration (HSI) Practitioner's Guide (NASA/SP-2015-3709) **Source**: NASA (US Government work, public domain) | **Chapters**: 9 ## When to use Use this skill when planning, scoping, or executing HSI within a NASA systems engineering lifecycle — from first concept studies through decommissioning. It answers "when do I do what", "what products are due at which milestone", and "how do I scale HSI to my program size." It is the practitioner's process companion, not a human factors design reference; for specific ergonomic or human performance standards, consult NASA-STD-3001 and the HIDH directly. **Prerequisites:** none — plain Markdown; no MCP server, API key, or licence tier needed at runtime. ## How to Use This Skill - **Without arguments** — load the core frameworks below and the HSI lifecycle overview. - **With a topic** — ask about ConOps, function allocation, HSI Plan, HITL testing, crew time KPP, COTS screening, V&V pre-declaration, lessons learned; I read the relevant chapter. - **With a phase** — ask about "Pre-Phase A", "Phase B", "Phase D", "Phase E"; I provide the HSI activities and milestone deliverables for that phase. - **With a chapter** — ask for `ch01` through `ch09`. Supporting files: `glossary.md`, `patterns.md`, `cheatsheet.md`. ## Core Frameworks & Mental Models ### 1. Four HSI Key Concepts (Ch 1) 1. **System = hardware + software + human** — all three sub-systems have equal standing. 2. **All personnel, all lifecycle** — users, operators, maintainers, trainers, logistics, ground control. 3. **Integration and collaboration** — HSI resolves cross-domain conflicts before program management must engage. 4. **Early is mandatory** — LCC is locked in during early phases; Pre-Phase A HSI yields the greatest cost savings. ### 2. NASA HSI Domains (Ch 1) | Domain | Core Focus | |---|---| | Human Factors Engineering (HFE) | Capabilities/limitations → hardware/software design | | Operations Resources | Flight and ground crew operations planning | | Maintainability and Supportability | Maintenance design, logistics, spares | | Habitability and Environment | Living/working conditions, health, environment | | Safety | Hazard controls, human rating, survivability | | Training | Instructional design, training resource minimisation | ### 3. HSI in the Systems Engineering Engine (Ch 3) HSI runs in lock-step with the 17 NASA SEE processes (NPR 7123.1B). Key mapping: - **SEE 1–4 (Design)**: ConOps, function allocation, requirements, HITL-informed design - **SEE 5–9 (Realization)**: Prototyping, integration, HITL V&V, operations transition - **SEE 10–17 (Management)**: HSI plan, risk management, metrics, milestone reviews ### 4. Lifecycle Phase HSI Activities Summary | Phase | Gate | Primary HSI Actions | |---|---|---| | Pre-Phase A | MCR | ConOps draft; function allocation; MOEs; HSI planning initiated | | Phase A | SRR/SDR | ConOps baseline; HSI team formed; requirements baseline; MOPs/TPMs | | Phase B | PDR | HITL intensified; requirements refined; V&V framework established | | Phase C | CDR/PRR/SIR | Design finalised; production/training plans; V&V activities maturing | | Phase D | TRR/SAR/ORR/FRR | V&V closure; Human Rating Certification Package; operational products | | Phase E | PLAR/CERR/PFAR/DR | In-mission monitoring; lessons learned; sustaining engineering | | Phase F | DRR | Decommissioning support; final knowledge archiving | ### 5. HSI Metrics Cascade **MOE** (stakeholder satisfaction criterion, Pre-Phase A) → **MOP** (engineering-level measure, Phase A) → **TPM** (tracked margin, Phase A through Phase E) → **KPP** (program-level threshold/objective, e.g. crew time ≤40%/≤35%) ### 6. HSI Scaling (Ch 7) | Scale | Safety | Human Involvement | Plan Format | |---|---|---|---| | Large | Category I / human-rated / life-sustaining | Tight coupling; crew "lives in the product" | Standalone HSI Plan | | Medium | Category II / modest risk | Moderate coupling; crew essential | HSI in SEMP | | Small | Category III / low risk | Loose coupling; some automation | Project documents | **Rule**: Scale by safety and human involvement, NOT by budget. ### 7. HSI Plan Structure (Ch 8, Ch 9) 1. Introduction (Purpose, Scope, Definitions) 2. Applicable Documents 3. HSI Objectives (System Description + HSI Relevance) 4. HSI Strategy (Summary + Domains) 5. HSI Requirements, Organisation, and Risk Management 6. HSI Implementation (Activities, Products, Update Schedule) ### 8. Three Technical Authorities (Ch 2) - **ETA** (OCE) → NPR 7123.1B; engineering design oversight - **SMA TA** (OSMA) → NPR 8705.2B; safety and human-rating mandate - **HMTA** (OCHMO) → NASA-STD-3001; health and medical standards --- ## Chapter Index | # | Section | Key content | |---|---------|-------------| | [ch01](chapters/ch01-introduction-to-hsi.md) | Introduction to HSI | Four key concepts, HSI domains, HFE/HCD/HSI distinctions, LCC motivation | | [ch02](chapters/ch02-implementing-hsi.md) | Implementing HSI | Three TAs (ETA/SMA/HMTA), control boards, IPT collaboration, HSI tools | | [ch03](chapters/ch03-hsi-in-the-see-engine.md) | HSI in the SEE Engine | 17 SEE processes, Product Maturity Matrix, ConOps, function allocation, MOE→MOP→TPM | | [ch04](chapters/ch04-pre-phase-a-and-phase-a.md) | Pre-Phase A and Phase A | MCR/SRR/SDR deliverables, HITL mockups, function allocation, HSI team formation | | [ch05](chapters/ch05-phases-b-and-c.md) | Phases B and C | PDR/CDR activities, HITL intensification, V&V pre-declaration, design finalisation | | [ch06](chapters/ch06-phases-d-e-f.md) | Phases D, E, and F | V&V closure, Human Rating Certification Package, operational monitoring, lessons learned | | [ch07](chapters/ch07-hsi-products-scaling-tailoring.md) | Products, Scaling, Tailoring | Three-tier scaling, COTS assessment, crew time KPP, Agile integration | | [ch08](chapters/ch08-hsi-plan-writing-and-execution.md) | HSI Plan Writing and Execution | HSI Plan structure, ConOps development, SME integration, requirements derivation, metrics | | [ch09](chapters/ch09-appendices-hsi-plan-checklist-cases.md) | Appendices: Plan, Checklist, Cases | Appendix A annotated outline, Appendix B checklist, Appendix C case studies (F-22, Shuttle, ISS, Constellation) | ## Topic Index - **ConOps development** → ch03, ch04, ch08 - **COTS screening** → ch07 - **Crew time KPP** → ch07, ch08 - **Function allocation** → ch03, ch04, ch08 - **HITL testing** → ch03, ch04, ch05, ch06 - **HSI Plan writing** → ch08, ch09 - **HSI scaling and tailoring** → ch07 - **HSI team formation** → ch02, ch04 - **Lifecycle milestone deliverables** → ch03, ch04, ch05, ch06 - **LCC and cost avoidance** → ch01, ch07, ch08 - **Metrics (MOE/MOP/TPM/KPP)** → ch03, ch08 - **Phase D V&V closure** → ch06 - **Pre-declaration** → ch05, ch06 - **Requirements development** → ch08 - **SME integration** → ch02, ch08 - **Technical authorities** → ch02 - **Training domain** → ch01, ch08 ## Supporting Files - [glossary.md](glossary.md) — ~50 terms with chapter references, from CDR to V&V - [patterns.md](patterns.md) — 13 reusable when/how/trade-off patterns for HSI practice - [cheatsheet.md](cheatsheet.md) — decision rules, milestone map, tells-and-smells, four key concepts --- ## Scope & Limits This skill covers the NASA HSI process and management framework as documented in NASA/SP-2015-3709: HSI lifecycle phases, SEE integration, product maturity, scaling, HSI Plan structure, metrics, V&V strategy, and program case studies. It does not cover the detailed engineering design standards in NASA-STD-3001 (human factors design requirements for space systems), the HIDH human performance data, or specific HFE analysis methodologies beyond what the Practitioner's Guide itself describes. This is a US Government public domain work (NASA); no copyright restriction applies.