name: cdev-status
description: Use when the user asks where a CDev-conditioned repository stands — progress of the active sprint (or a named one) measured on three axes, functional requirements, non-functional requirements and user stories — after several batches have run, before deciding what to run next, or when coming back to a repo. Also when the user invokes /cdev-status or asks "status of the sprint", "where are we", "how far along is this", "status funcional", "por dónde vamos", "qué llevamos del sprint".
---
# CDev Status
A read-only reading of **one** conditioned repository: how far the sprint's intent has been
walked, on three axes. **It edits no file and marks no state.** The single-repo counterpart of
`cdev-monorepo-status`, which applies this skill's method by reference — this file is the
method's single home.
Requires a conditioned repo (`docs/develop/` with `SPRINTS.md`, `AGENT_PROGRESS.md`, protocol).
Not conditioned → propose the `bootstrap` skill and stop; do not improvise a status.
## The idea
The plan holds no list of requirements or user stories, on purpose: a formalized list has to be
kept current while a feature is still being discovered, and that maintenance is what drifts.
The intent lives in free form — the sprint's objective, each batch's text and acceptance, the
decisions, the handoff. This skill engineers the three axes **at read time** from that raw
chain, and says where each item came from.
## Scope
- **No argument** → the `ACTIVE` sprint. None `ACTIVE` → say so, and read the most recently
closed one.
- **A sprint named** → that sprint.
- **`all`** → one line per sprint (state, batches closed of N, the three percentages); full
detail only for the `ACTIVE` one.
- **`since <batch|date|commit>`** → adds the delta (§ Delta).
## Read, in this order
1. Repo guide → local protocol (what "verified" means here).
2. `SPRINTS.md` — the sprint's objective; every batch: text, acceptance, state, dependencies.
3. `DECISIONS.md` — the entries about this sprint.
4. `AGENT_PROGRESS.md` — the entries of this sprint's batches: what was done, verification per
check, blockers.
5. `git log` and `git status` — the commits carrying the sprint's units; work the plan does not
know about.
6. Whatever the sprint or its batches reference — contracts, reports, a testing document where
one exists.
Where a later record changes an earlier decision, the newest wins and is the one cited.
+ **Read narrowly — slices, never fewer sources.** Plans and handoff logs grow for months:
+ locate the sprint in scope and read that sprint, the decisions about it and the handoff
+ entries of its batches — not the whole files. Every source in the list above is still read;
+ what shrinks is how much of each. The reading is one pass by one reader, and its cost should
+ not grow with the age of the repository. Whatever you did not open, name in the method note.
+
## Engineer the three axes, in this order
1. **Functional requirements** — what the sprint's objective and its batches commit the system
to *do*. One line each, in the plan's own terms.
2. **Non-functional requirements** — the qualities and constraints they commit the *system*
to, wherever the plan, the decisions or the referenced documents state them. The
repository's working rules — its verification sequence, branch convention, gates — are not
requirements of the system: they tell you what "verified" means, they are never items.
3. **User stories** — built last, over the first two, against the sprint's objective. First
person ("As a …, I …"), each marked **new** or **enriched** (a capability that already
existed and this sprint extends).
Every item cites its source: the sprint objective, a batch, a dated decision, a handoff entry,
a file path.
State per item:
- **met** — every batch carrying it is `DONE` and its handoff entry records the verification;
- **met, unverified** — the batches are `DONE` but a check that covers it is recorded `not-run`;
- **partial** — an estimated percentage, the reason, and the batch that owns the rest;
- **pending** — the owning batch.
Percentages are **estimates**: **one figure per axis** over the sprint's total, one per partial
item. "Met, unverified" items count toward the axis figure; the executive reading says how much
of it rests on them. Say in the method note that the numbers are estimates; never present them
as measured, never give an axis two figures.
## Report
1. **Title** — sprint, date, batches closed X of N.
2. **Method note** — one paragraph: the items were derived at read time from the files read
(name them); the percentages are estimates.
3. **§1 Functional requirements — ~NN%** — table `State | Requirement | Source`.
4. **§2 Non-functional requirements — ~NN%** — same table.
5. **§3 User stories — ~NN% · N complete · N partial · N empty** — three groups. Complete: the
story and what proves it. Partial: percentage and reason. Empty: the owning batch.
6. **Executive reading** — batches closed, the three percentages, where the remaining work
converges, live risks: blocked batches and the human decisions they wait on, verification
recorded `not-run`.
7. **What is left to reach 100%** — numbered, by owning batch.
Keep it a reading, not an audit: one line per item, the executive reading in a handful of
lines. A disagreement is flagged once, where it bites, not re-argued in every section.
### Delta
With `since`, read `SPRINTS.md` and `AGENT_PROGRESS.md` as they were at that point
(`git show <rev>:<path>`; a batch resolves to the commit that closed it — a bare batch id
means the sprint in scope — and a date to the last commit before it). Apply the **same item
list** to both states, show "(before NN%)" beside each percentage and mark the items whose
state changed. No argument, no delta. Nothing is persisted between runs.
## Rules
- **Read-only, always.** If the conversation surfaces something that belongs in the plan,
say it is the planner's job; do not write it.
- An axis the repository does not support reads **"not derivable"** and names what is
missing. Never fill it from general knowledge of what such a product usually needs.
- Disagreement between plan, handoff and git is **flagged, never resolved**: a `DONE` whose
entry records a check `not-run` reads "met, unverified"; commits belonging to no batch are
listed as work the plan does not know.
- Answer in the language the human is using.