name: feature-progress-tracking
description: >
Keeping a feature's state true while it is being built: one status per resource with defined
transitions, a validation line required before anything reaches done, and a persisted record
- current enough that another agent or another session can resume from it without asking. Use
- when a feature spans more than one sitting, when someone else may pick the work up, when the
- answer to "where are we" is a summary of the conversation, when resources are marked done
+ current enough that another agent or another session can resume without reconstructing the
+ conversation. Use when a feature spans more than one sitting, when someone else may pick the
+ work up, when the answer to "where are we" is a summary of the conversation, when resources are marked done
because code was written for them, when a blocker has been open long enough that nobody
remembers what it needs, or when a plan and the code have silently diverged. Does not
implement the resources (feature-execution), does not decide what counts as a resource
(feature-decomposition), and does not perform the final review
(feature-readiness-review).
---
# Feature Progress Tracking
## Purpose
Durable records preserve evidence and unfinished work across handoffs. Reconstruction is
possible from diffs, logs and test results, but uncertainty must remain visible; do not invent
start times or past validation merely to complete a table.
This skill exists so that a second agent, opening the repository with no history, can read one
entry point and find the current state, supporting evidence and next ready work.
## The status set
| Status | Means | Entered when |
| --------------- | ---------------------------------------------------- | -------------------------------------- |
| **TODO** | Defined, not started | The resource is created |
| **IN_PROGRESS** | Started, with implementation or validation remaining | Work starts; may be paused for handoff |
| **BLOCKED** | Cannot proceed for a reason outside the work | The blocker is identified |
| **DONE** | Implemented and validated | The validation ran and passed |
| **SKIPPED** | Deliberately not done in this feature; still wanted | A decision, with a reason and an owner |
| **CANCELLED** | Resource retired: no longer needed or replaced | Reason and retained scope are recorded |
Common transitions (additional evidence-based transitions are described below):
```text
TODO ──► IN_PROGRESS ──► DONE
│ │ ▲
│ ▼ │
│ BLOCKED
│ │
├──► SKIPPED ◄┘
└──► CANCELLED
DONE ──► IN_PROGRESS when evidence or a change invalidates completion; record why
```
The normal path is TODO → IN_PROGRESS → DONE. A direct TODO → DONE transition is acceptable for an
atomic task completed and validated between observations; record the validation rather than
inventing historical states. BLOCKED normally returns through IN_PROGRESS, but the blocker may also
make the resource CANCELLED or prove that no work remained. DONE still requires valid acceptance
evidence, even when a resolved blocker needs no new code. State transitions serve truthful
resumption, not workflow accounting for its own sake.
## Workflow
1. **Reuse the established tracking location and record format.** The table and log are roles,
- not mandatory separate files. Create entries when resources are defined, initially TODO for
- unstarted work. When tracking begins later, reconstruct only evidence-supported state and label unknowns.
+ not mandatory separate files. On resumption, locate that entry point and reconcile the selected
+ resource's recorded state with its accepted scope, current implementation and evidence before
+ updating it or handing it to an executor. Follow the resumption procedure in the reference below.
+ Create entries when resources are defined, initially TODO for unstarted work. When tracking
+ begins later, reconstruct only evidence-supported state and label unknowns.
2. **Update at durable handoff points and material transitions.** For multi-session or parallel
work, update before ownership changes and before ending a session. Do not turn sub-minute local
edits into an event stream that costs more than the work.
3. **Require relevant acceptance evidence for DONE.** Link what ran, results and the checked
code/contract revision and environment; a command name alone is not a passing result.
+ Confirm that required checks actually executed and cover the claimed scope. A recent rerun
+ can still check an older revision; a green aggregate does not establish omitted coverage.
Keep enough durable evidence in the established record for the next owner to substantiate
that status. A mutable "latest" badge or expiring artifact link alone is insufficient. If an
artifact becomes unavailable, assess the remaining evidence before reopening affected work;
losing a link does not prove that the check failed or never ran.
4. **Record a blocker's question or missing condition**, affected work, resolution owner,
evidence needed to unblock, and what continues meanwhile. If the owner is unknown, say so
instead of assigning decision authority by assumption.
5. **Append to the execution log** on start, completion, blocking, unblocking and any plan
- change. The log is append-only; a correction is a new entry.
- 6. **Leave the files true at the end of every session**, whatever state the work is in.
+ change. The log is append-only; a correction is a new entry. When an attempt changes the
+ next action, retain its observed outcome and why it supports that adjustment; distinguish
+ a confirmed cause from an explanation still needing evidence.
+ 6. **Leave an actionable handoff at the end of every session.** Name the next resource, owner,
+ starting file/check, expected result and any prerequisite still preventing that action.
+ Verify that the entry point links to the corrected state and evidence, whatever the status.
7. **Track revision impact.** Record the Product/Engineering or Tech baseline and plan revision. When
- either changes, trace the actual acceptance, implementation and evidence impact. Reopen `RES-*`
+ either, the implementation, or a relevant environment/configuration assumption changes,
+ trace the actual acceptance, implementation and evidence impact. Reopen `RES-*`
and mark `EV-*` stale only where their coverage is invalidated; a new revision label or reordered
plan alone does not invalidate a passing check. Name what triggered each state change.
Load [artefact formats](references/artefact-formats.md) when creating or resuming records, or
- when evidence access or retention puts a completion claim in doubt.
+ when evidence applicability, access or retention puts a completion claim in doubt, or a status
+ update needs to explain an outcome that changed the next action.
## Decision rules
```text
IF a resource has been implemented but not validated
THEN it is IN_PROGRESS, or BLOCKED when an external impediment prevents required validation.
Record implemented work and missing evidence; do not call it qualified DONE.
IF validation was run and something failed
THEN investigate the cause; an implementation defect stays IN_PROGRESS, an external
impediment can be BLOCKED. A required failing check does not support DONE.
IF a resource is DONE and a later resource breaks it
THEN it returns to IN_PROGRESS, and the log says which resource reopened it.
IF an accepted baseline or CT-* changes
THEN trace the impact to RES-*/EV-*, reopen affected rows, and preserve unaffected DONE evidence.
IF a resource is skipped or cancelled
THEN record who decided, why and which commitments remain. Neither status amends
Required scope: link equivalent accepted coverage or an authorized scope/acceptance revision;
otherwise report the feature incomplete against that commitment. Reuse existing authority.
A replacement still awaiting validation remains open under its own ID.
- IF the same resource has been IN_PROGRESS across three sessions
- THEN inspect remaining work, session length and dependencies. Split only when useful;
- session count alone proves neither oversizing nor an external blocker.
+ IF an expected checkpoint is missed, attempts repeat without new evidence, or a blocker
+ threatens dependent work
+ THEN inspect the remaining scope, observed attempts and dependencies with the owner.
+ Choose a next evidence-producing action, resolve a blocker, or request a useful split
+ through feature-decomposition. Elapsed time or session count alone determines neither
+ resource size nor status; do not wait for an arbitrary number of sessions to investigate.
IF the progress file and the code disagree
THEN reconcile accepted scope, code revision and evidence before changing state. The tracker
may be stale, the implementation may have regressed, or a supersession may be missing.
Record what was established and reopen affected work; do not rewrite acceptance to fit code.
IF the feature is Light/Inline
THEN keep proportionate inline status; do not create a dossier for ceremony. If work must cross a
session or owner, change persistence to Dossier and preserve the current state before handoff;
this alone does not increase technical depth.
```
## Constraints
- **Make concurrent ownership explicit.** In one shared working tree, coordinate an editor for
the shared snapshot/log or use separately owned records with an explicit merger. Git merge
conflicts do not protect against one writer overwriting another's uncommitted file updates.
With separate working trees, merge changes and reconcile status, dependencies and evidence
even when no textual conflict occurs. Ownership is a coordination rule, not a filesystem lock;
inspect fresh state before updating and preserve other owners' changes.
- **Never mark DONE optimistically.** "It should work" is IN_PROGRESS with a note.
- **Preserve resource identity and history.** Never delete a row or reuse its ID for a different
obligation. For an accepted split/merge, link old and new IDs, the reason and updated dependencies;
retire replaced rows as CANCELLED with replacement links, without implying their obligations vanished.
Derive each resulting status from its actual scope and valid evidence; do not copy a parent's DONE
onto unverified children or reset unaffected completed work. Keep prior states and evidence in history.
- **Preserve decision history.** Append corrections, identify actor/resource/revision, and
distinguish event time from recording time. Concurrent wall-clock order is not dependency
order. Avoid secrets and personal payloads; if sensitive material was recorded, follow the
repository's redaction procedure and retain a sanitized correction trail.
## Output
The progress table, current, and the report derived from it:
```text
Feature Asynchronous order dispatch
Resources 10 total — 4 DONE, 1 IN_PROGRESS, 2 BLOCKED, 2 TODO, 1 CANCELLED
Blocked on Q-08 (uniqueness scope for the idempotency key), asked 2026-09-05
- Next RES-09 (metrics), unaffected by the blocker
+ Next RES-09 (metrics), agent-B; inspect plan.md#res-09 paths for missing counters
Plan changes RES-06 added 2026-09-05; RES-11 cancelled 2026-09-04
```
+ For a tracking-only request, produce this record and handoff; executing the next resource belongs
+ to feature-execution and requires that work to be in the authorized scope.
+
Keep the report proportionate; include material validation gaps and changed assumptions when
- the five-line summary would hide them. Resource counts are not effort percentages or release readiness.
+ the five-line summary would hide them. Say what changed since the last update and what evidence
+ or decision the next action should produce. Resource counts are not effort percentages or release