implementation-planner · git:20261001.f1e72be · 2026-10-01 · sha256 57d7883974e488cd
implementation-planner git:20261001.f1e72beA
Immutable. This exact content never changes and is served at /api/v1/blob/57d7883974e488cd.
--- name: implementation-planner description: Explore architecture options and create evidence-grounded implementation plans. Use when the user asks to plan a feature, compare design approaches, decide architecture, or turn a spec into an execution plan, or when an authorized non-trivial change needs planning. Planning does not authorize implementation. argument-hint: Feature, architecture question, bug handoff, or existing plan. --- # Implementation planner ## Outcome and boundary Produce a recommendation or an execution-ready plan that connects the user's goal to repository evidence and a verifiable result. Planning does not authorize implementation. For an architecture discussion, answer in the conversation; do not create a plan file unless the user requests a written artifact or has authorized an implementation task that needs one. Do not edit runtime code, tests, configuration, dependencies, or unrelated guidance. ## Ground the decision - Read the current request, applicable project instructions, existing decisions or plans, and the affected flow. Use actual code and tests rather than an assumed file inventory. - State the desired outcome, existing limitation, constraints, and what is out of scope. - For an unresolved design, compare viable options and their correctness, compatibility, cost, and verification trade-offs. Recommend one without treating it as accepted. - Ask targeted questions when the answer changes correctness or scope. Unapproved rules, mappings, thresholds, or architecture remain open decisions; do not encode them as executable defaults. - If a bug is not understood, use `debug-investigator` for cause-and-effect evidence before planning a fix. If a small requested change is already clear, skip formal planning. ## Plan artifact Use an existing plan and repository format where available. Otherwise write an authorized artifact to `.agents/plans/<slug>.md`; create only the directory needed for that artifact, not a documentation scaffold. ```yaml --- status: draft created: YYYY-MM-DD last_updated: YYYY-MM-DD --- ``` Include only what another implementer needs: - Goal, acceptance criteria, authorized scope, and non-goals. - Accepted decisions with their source; unresolved decisions separately. - Small tasks tied to outcomes, relevant ownership points, and dependencies. Name interfaces or files when they remove execution ambiguity, not to prescribe every tool call. - Failure cases, compatibility and data-safety concerns, and any approved migration or rollback needs. - Runnable verification commands and expected behavior. For performance or classification, use agreed metrics and representative cases, not invented thresholds. Preserve existing task IDs and completed history. Update `last_updated` whenever the plan changes. Record genuine changes of scope instead of silently rewriting what was approved. Do not present a plan with unresolved blocking decisions as execution-ready. ## Handoff and lifecycle Return the recommendation or artifact path, evidence supporting it, open decisions, and whether implementation is authorized. Pass accepted requirements, boundaries, and verification criteria to `thoughtful-coder` only when coding is authorized; otherwise stop after planning. A new proposal is `draft`. Use `in-progress` only when execution is authorized and underway. The implementer records `done` after the authorized tasks are implemented and verified; commit and merge are separate permissions. Use `abandoned` with a reason when superseded, and preserve the artifact unless its deletion is authorized.