name: task-decomposer
description: 'Produces phased task boards from feature requests: dependency-mapped work items, parallelization flags, risk flags, edge cases, test matrices. Triggers on: "decompose this feature", "task breakdown with dependencies", "phased implementation plan", "work breakdown structure". NOT for effort estimates, use estimate-calibrator.'
metadata:
version: 1.1.1
category: development
tags: [task-breakdown, dependencies, planning, phased]
difficulty: intermediate
phase: plan
---
# Task Decomposer
Transforms ambiguous feature requests into concrete, implementable task sequences:
- identifies acceptance criteria, decomposes into phased work items with effort sizing,
- maps dependencies and parallelization, enumerates edge cases, plans testing, and flags
- risks — producing a ready-to-execute task board.
+ identifies acceptance criteria, decomposes into tracer-bullet vertical slices with effort
+ sizing, maps dependencies and parallelization, enumerates edge cases, plans testing, labels
+ HITL/AFK readiness, and flags risks — producing a ready-to-execute task board.
> **When to use this skill vs native decomposition:** The base model decomposes features
> well in an ad-hoc format. Use this skill specifically when you need the structured output:
> phased task tables with dependency mapping, parallelization flags, risk flags, and
> integrated test strategy. If you just need a quick list of steps, ask directly without
> invoking this skill.
## Reference Files
| File | Contents | Load When |
| -------------------------------------- | --------------------------------------------------------------- | ------------------------------- |
| `references/decomposition-patterns.md` | Feature → task decomposition strategies, granularity guidelines | Always |
| `references/edge-case-checklist.md` | Common edge case categories by domain (web, API, data, CLI) | Edge case identification needed |
| `references/dependency-mapping.md` | Dependency graph construction, critical path identification | Multi-task breakdown |
| `references/sizing-guide.md` | Effort estimation guidance (S/M/L), complexity indicators | Effort sizing needed |
## Prerequisites
- Feature description or requirements (can be vague — the skill handles ambiguity)
- Project context (tech stack, existing architecture, team size)
+ ## Project Context
+
+ Before decomposing, check for repo-local agent context:
+
+ - `docs/agents/domain.md` for `CONTEXT.md`, `CONTEXT-MAP.md`, and ADR lookup rules
+ - `docs/agents/triage-labels.md` for readiness labels when tasks become issues
+ - `CONTEXT.md` or relevant context-local glossary for task titles and acceptance criteria
+ - `.out-of-scope/` for durable rejections that may affect scope
+
+ Continue if these files are absent, but state that the plan is using inferred vocabulary.
+
## Workflow
### Phase 1: Understand the Feature
1. **Extract the user-facing goal** — What does this feature enable the user to do?
If unclear, state assumptions explicitly.
2. **Define acceptance criteria** — What must be true for this feature to be "done"?
Express as testable statements: "User can X", "System does Y when Z."
3. **Identify non-functional requirements** — Performance, security, accessibility,
backwards compatibility constraints.
4. **Clarify scope boundaries** — What is explicitly out of scope? State this to
prevent scope creep during implementation.
- ### Phase 2: Decompose into Tasks
+ ### Phase 2: Decompose into Vertical Slices
- Break the feature into tasks at the right granularity:
+ Break the feature into tracer-bullet slices first, then split oversized slices into tasks.
+ Each slice should deliver a narrow but complete path through the affected layers. Avoid
+ horizontal breakdowns where one issue only creates schema, another only creates API, and
+ another only creates UI unless the work is pure infrastructure.
| Granularity | Size | Example |
| ----------- | ---------------------------------------------- | ---------------------------- |
| Too coarse | "Build the search feature" | Not actionable |
- | Right level | "Add full-text search index to products table" | Single PR, testable |
+ | Right level | "Exact-match product search returns results end-to-end" | Single PR, testable |
| Too fine | "Import the search library" | Not independently meaningful |
**Right granularity test:** Each task should be completable in a single PR, testable
- in isolation, and deliverable independently (even if not user-visible alone).
+ in isolation, and deliverable independently. A completed vertical slice should be demoable
+ or verifiable without waiting for unrelated slices.
Group tasks into phases:
- | Phase | Purpose | Contains |
- | ----------- | ------------------------------------ | ------------------------------------------ |
- | Foundation | Data models, schemas, interfaces | Types, database tables, API contracts |
- | Core logic | Business logic, algorithms | The actual feature implementation |
- | Integration | Connecting components, API endpoints | Routes, controllers, wire-up |
- | Polish | Edge cases, error handling, UX | Validation, error messages, loading states |
+ | Phase | Purpose | Contains |
+ | ----- | ------- | -------- |
+ | Setup | Shared contracts or migrations that unblock slices | Types, schemas, fixtures |
+ | Slice 1 | First end-to-end behavior | Minimal data, logic, API, UI/CLI path |
+ | Slice N | Incremental capability | One user-visible behavior or operational capability |
+ | Hardening | Cross-slice edge cases and quality gates | Performance, security, docs, cleanup |
+ Label each slice:
+
+ - **AFK** — an agent can implement it from the issue brief with no further human context.
+ - **HITL** — requires human judgment, external access, product approval, design review, or release authority.
+
### Phase 3: Identify Edge Cases
For each task, enumerate edge cases:
1. **Input boundaries** — Empty, null, maximum size, special characters
2. **State transitions** — Concurrent modification, interrupted operations
3. **Error conditions** — Network failures, invalid data, permission denied
4. **Backwards compatibility** — Existing data, existing API consumers
### Phase 4: Plan Testing
For each task, identify what to test:
| Test Level | What to Test | Who Writes |
| ----------- | ------------------------------------- | ----------------------- |
| Unit | Individual functions, pure logic | During implementation |
| Integration | Component interactions, API endpoints | After integration phase |
| Manual | User flows, visual correctness | After polish phase |
### Phase 5: Map Dependencies
Identify which tasks depend on others:
1. **Hard dependencies** — Task B requires Task A's output (database table must exist
before writing queries)
2. **Soft dependencies** — Task B benefits from Task A but could use a stub
3. **No dependency** — Tasks can be done in parallel
### Phase 6: Flag Risks
For each risk, identify mitigation:
| Risk Type | Example | Mitigation |
| ------------------- | ----------------------------------- | ----------------------------------------------- |
| Technical unknown | "Never used WebSockets before" | Spike/prototype first |
| External dependency | "Requires API access we don't have" | Request early, use mocks |
| Scope uncertainty | "Requirements may change" | Implement core first, defer edge cases |
| Performance risk | "May be slow with 1M rows" | Add benchmark task, define acceptable threshold |
## Output Format
```text
## Task Decomposition: {Feature Name}
### Feature Summary
{One paragraph describing what this feature does and why}
### Acceptance Criteria
- [ ] {Testable statement 1}
- [ ] {Testable statement 2}
- [ ] {Testable statement 3}
### Scope
- **In scope:** {what's included}
- **Out of scope:** {what's excluded}
### Task Breakdown
#### Phase 1: Foundation
- | # | Task | Effort | Dependencies | Parallel |
- |---|------|--------|--------------|----------|
- | 1.1 | {task description} | {S/M/L} | None | Yes |
- | 1.2 | {task description} | {S/M/L} | 1.1 | No |
-
- #### Phase 2: Core Logic
- | # | Task | Effort | Dependencies | Parallel |
- |---|------|--------|--------------|----------|
- | 2.1 | {task description} | {S/M/L} | 1.x | Yes |
- | 2.2 | {task description} | {S/M/L} | 1.x | Yes |
+ | # | Slice / Task | Type | Effort | Dependencies | Parallel |
+ |---|--------------|------|--------|--------------|----------|
+ | 1.1 | {task description} | {AFK/HITL} | {S/M/L} | None | Yes |
+ | 1.2 | {task description} | {AFK/HITL} | {S/M/L} | 1.1 | No |
- #### Phase 3: Integration
- | # | Task | Effort | Dependencies | Parallel |
- |---|------|--------|--------------|----------|
- | 3.1 | {task description} | {S/M/L} | 2.x | No |
+ #### Phase 2: Vertical Slices
+ | # | Slice / Task | Type | Effort | Dependencies | Parallel |
+ |---|--------------|------|--------|--------------|----------|
+ | 2.1 | {end-to-end behavior} | {AFK/HITL} | {S/M/L} | 1.x | Yes |
+ | 2.2 | {end-to-end behavior} | {AFK/HITL} | {S/M/L} | 1.x | Yes |
- #### Phase 4: Polish
- | # | Task | Effort | Dependencies | Parallel |
- |---|------|--------|--------------|----------|
- | 4.1 | {task description} | {S/M/L} | 3.x | Yes |
+ #### Phase 3: Hardening
+ | # | Task | Type | Effort | Dependencies | Parallel |
+ |---|------|------|--------|--------------|----------|
+ | 3.1 | {cross-slice quality gate} | {AFK/HITL} | {S/M/L} | 2.x | No |
### Edge Cases
| # | Edge Case | Handling | Phase |
|---|-----------|----------|-------|
| 1 | {edge case} | {how to handle} | {which phase} |
### Test Strategy
#### Unit Tests
- {Component}: {what to test}
#### Integration Tests
- {Flow}: {what to test}
#### Manual Verification
- {Scenario}: {what to check}
### Risk Flags
- {Risk}: {mitigation strategy}
+
+ ### Agent Brief Notes
+ - {Any interface contracts, acceptance criteria, or out-of-scope boundaries that should be copied into ready-for-agent issues}
```
## Calibration Rules
- 1. **Right granularity.** Each task should be 1-3 days of work. Larger → decompose further.
- Smaller → merge into a parent task.
+ 1. **Right granularity.** Each slice should be 1-3 days of work and each implementation task
+ should fit in one PR. Larger → decompose further. Smaller → merge into a parent slice.
2. **Testable acceptance criteria.** "Make search work" is not testable. "Search returns
relevant results within 200ms for queries up to 100 characters" is testable.
3. **Dependencies are sacred.** If Task B truly depends on Task A, mark it. False
dependencies slow teams down; missing dependencies cause integration failures.
4. **Edge cases are not optional.** Every feature has edge cases. If the edge case list
is empty, the analysis is incomplete.
5. **Parallel = velocity.** Maximize parallel tasks. If 4 tasks can be done simultaneously,
the phase takes the duration of the longest, not the sum.
+ 6. **Vertical first.** Prefer end-to-end slices over layer-only tasks. Use horizontal tasks
+ only for shared contracts, migrations, or infrastructure that genuinely unblocks slices.
+ 7. **Ready-for-agent requires a brief.** AFK slices need desired behavior, key interfaces,
+ acceptance criteria, and out-of-scope boundaries clear enough for a fresh agent.
## Error Handling
| Problem | Resolution |
| -------------------------------- | ------------------------------------------------------------------------------------------------------ |
| Feature description is vague | State assumptions, decompose what's known, mark uncertain tasks with "pending clarification." |
| Feature is too large (20+ tasks) | Split into multiple features. A feature that takes months is a project, not a feature. |
| No clear acceptance criteria | Help the user define them: "What does done look like? What would you demo?" |
| Technical stack unknown | Decompose at the logical level (data model, business logic, API, UI) without implementation specifics. |
## When NOT to Decompose
Push back if:
- The task is already atomic (single function, single file change) — just do it
- The user wants time estimates, not task breakdown — use estimate-calibrator instead
- The feature is exploratory (research, prototype) — decomposition assumes known scope