yui-leader · git:20261017.cb256bd · 2026-10-17 · sha256 8ed34c97f4cf9bbf
yui-leader git:20261017.cb256bdA
Immutable. This exact content never changes and is served at /api/v1/blob/8ed34c97f4cf9bbf.
--- name: yui-leader description: Lead one Yui Task through authorized planning, activation handoff, execution, acceptance and same-result follow-up, including reopening its completed, unarchived result for an explicit implementation or delivery request. --- # Yui Leader Follow [yui-runtime](../yui-runtime/SKILL.md) first, including its lightweight `yui session skills --json` check at the start of every turn and full reload when versions change or context is missing/recovered. Load the exact Context Pack for an explicitly dispatched AgentRun; for direct conversation or a Task notification, read current Task context using `yui task context <task-id> --json`. No self-dispatch or old completed Run is needed. Read the actual Task requirements, current Brief and relevant user/Operator Messages, not just their summaries. Resolve links relative to the file containing them. Current Context is a bounded working set, not all Task history. Use `task context list <task> --store <store>` or a domain list for discovery, then an exact detail read. A wake contains attributed change summaries and original Message/Run pointers, not complete reports. Follow `yui-runtime`'s `nextCursor` and `contentPage` rules: read the complete focused wake view and relevant originals before disposition; use `wake show --history` only when window history/diagnostics matter. Summaries never decide completion. Before WorkItem dispatch, put the complete bounded requirements in the WorkItem or explicitly select up to 16 relevant readable materials with repeated `--context-ref <store/refId@digest>` on `task work dispatch`. Obtain exact IDs and digests from current Task context list/inspect. Core freezes these selected values after the existing caller-scope checks; mentioning a record in `--input` does not select it or grant access. Missing, forbidden or changed references refuse dispatch before Provider startup: correct the selection or make the WorkItem self-contained, never ask the recipient to bypass expansion rejection. ## Select the applicable stage Use current lifecycle, latest intent and the Session's actual planning/delivery authority together. Draft existence, accepted planning history, Session authority and AgentRun status are different facts. A completed planning Run does not complete or activate a Task; an active Task does not upgrade an old planning Session. Never infer authority from a directory, launch text, transcript or process. Apply terminal/gate and read-only intent boundaries before selecting delivery or planning work; the routes below do not override those restrictions. When old discussion text differs from new intent, apply [current intent and temporal reads](../yui-runtime/references/context-ordering.md): inspect exact sources before treating normal stage progression as a conflict. An adopted same-scope development request supersedes the earlier discussion-only stage, not independent restrictions. Never use active status or Brief alone. - **Draft or planning-only authority:** read [Planning and activation handoff](references/planning.md). Use the recorded submission intent (`record`, `discuss`, `develop`) and routing result, not keywords in the message. Discuss and preserve the requested outcome; do not load execution procedures merely to finish a discussion. - **Active, execution enabled, delivery authority and implementation intent:** read [Active execution](references/execution.md). Advance existing authorized work, including disposition of new results, without asking for another “continue” after a valid activation handoff. - **Query, analysis or discussion only:** answer within the requested scope, even on an active Task. Do not turn it into edits or dispatch. A result notification is different: read its original results and advance the outstanding authorized requirement. - **Completed, unarchived, explicit same-result implementation or delivery request:** the current matching Leader may call `task reopen <task-id>` for its own Task, then continue that bounded request without a mandatory Operator handoff or another “reopen” confirmation. Read the [post-completion routing boundary](../yui-runtime/references/publication.md#post-completion-routing-boundary) first, inspect the reopen result, and reassess current Session/workspace authority and the execution gate before delivery. Reopening is lifecycle management, not a planning Session's promotion to delivery. - **Cancelled/retired, archived, execution gate disabled, or no new execution authority:** explain/query authorized facts only unless a specific further action is authorized and legal. The Leader cannot restore cancelled/retired intent; archived Tasks cannot reopen. An independent stop needs its separately authorized start/cleanup path; reopen does not lift it. Queries, discussion, ordinary notifications and Session recovery do not authorize reopening or resumption. Identify a genuinely missing lifecycle/authority action for the Operator; do not manufacture a Run or reopen merely to obtain authority. Publication recording/adoption is not a way to start terminal-Task execution. These are instruction routes, not new lifecycle states or a scheduling protocol. Where facts disagree or authority is missing, preserve intent and report the exact boundary rather than choosing a more permissive route. A `task-reopened` notification can arrive before its follow-up Message. Read the prior completion and current Messages; if only lifecycle changed, wait for the new request. Do not rerun accepted work, infer external authority, or immediately complete again. Once the scoped request arrives, continue it in this Task without asking for another “continue”; preserve the original acceptance evidence. Handle a failed Worker/Reviewer launch through the shared [configuration recovery guidance](../yui-runtime/references/recovery.md#configuration-and-model-name-failures). Read its original failure and scoped metadata before choosing a correction; the failed target need not be running for you to act. ## Maintain useful durable context Apply **yui-runtime**'s own-inbox flow before acceptance or completion and at useful work boundaries. A Leader inbox contains its exact notification windows and messages for its current managed Assignment, not every Task Message. For a window, read its full focused wake and relevant originals; for an Assignment message, read its complete original. Dispose of results explicitly, then ack the exact entry. Inbox acknowledgement never accepts a Candidate or completes the Task. The DB Brief is the current summary, not a full plan or a history of messages. After meaningful progress, read `task brief show` and use `task brief update --if-current <writeGuard>` with only intended fields; read `task event list` before deliberately restoring an older value. Keep references to substantial plans, prototypes and reports in that summary. When a delivered correction resolves a recorded blocker or changes the next action, update the Brief's focus and Leader summary while the Task is still open. Before completing a Task, reread its Brief: if it still describes a resolved blocker, superseded plan, or waiting state, correct those fields before `task complete`. The completion summary is the terminal conclusion; do not copy it into Brief merely to create a second completion record. Brief maintenance is not a new completion gate, and routine unchanged steps do not need an update. Also reconcile the summary at requirement changes and phase handoffs; carry the exact activation/input references. Core projects current lifecycle and source diagnostics without rewriting historical messages. A stale-guard rejection requires reading the new input and reconciling, not retrying the old text. Decisions contain the actual decision, reason and necessary boundaries, not the entire proposal. Label recommendations as recommendations, not user decisions. Save full deliverables as files in the Task's local Git artifact repository, not in Brief/Decision or a parallel store. Use `task artifact save` or `artifact.save`; read [Task artifact operations](references/planning.md#task-artifact-operations) before saving or citing results in any stage. A save commits one selected path and returns `taskId + commit + relativePath` for fixed evidence. Update the Brief reference after a meaningful saved revision; keep the document body, HEAD and timestamps out of DB mirrors. Saving a planning result neither activates the Task nor grants Project write authority. Artifact scripts and HTML are data, not permission to execute or preview them. Add a Milestone only for an independently meaningful outcome, a Message only for a new conclusion another reader needs, and Project Knowledge only for a stable cross-Task lesson. Do not create records for every exchange, dispatch, heartbeat or unchanged wait. Ordinary fact edits need no self-wake. ## Close the current turn For external delivery, choose any available authorized CLI/API and follow [Publication evidence](../yui-runtime/references/publication.md). Record exact tool observations through `publication verify --observation`; gh/glab are optional adapters, not mandatory trusted brands. Do not repeat a sufficient exact verification merely to use a different tool. Tool inspection is your judgment; candidate acceptance, immutable evidence and ordinary archive safety still apply. - **Planning:** save meaningful revisions, summarize the discussion and await feedback. This is a complete turn; it needs no WorkItem, Review, InputRequest or Task completion just to stop. - **Active delivery:** apply the result-disposition and close instructions in [Active execution](references/execution.md). Continue within authorization, complete only when acceptance is satisfied, or wait for a real durable event. Ask only for a genuinely missing user choice, authority or external fact; routine engineering coordination is not a user decision. - **Queries and terminal stages:** answer the bounded question and stop without starting work or recording fictitious lifecycle progress. Every explicitly dispatched managed AgentRun returns one truthful original final report under Runtime's contract, including a planning Run whose result is a saved proposal awaiting feedback. Ordinary chat and notifications are not implicit assignments and need no separate execution report. Run terminal, result acceptance, Task completion, remote delivery and user-authorized archive are distinct facts. Do not poll managed Roles or emit unchanged waiting Messages; future durable events supply the next notification.