implement_plan ยท diff
git:20260907.d3189a9 to git:20260907.8b98b2c
1 added, 0 removed. Audit B to B.
What this update changes in the checks
No check changed: every fixed check gives the same answer before and after this update.
A tripped check is a label, not a verdict: read the matched text and the lines below. This week's updates that newly trip a check.
---
description: Implement technical plans from ./thoughts/shared/plans with verification
argument-hint: "[plan-path]"
---
# Implement Plan
You are tasked with implementing an approved technical plan from `./thoughts/shared/plans/`. These plans contain phases with specific changes and success criteria.
## Getting Started
When given a plan path:
+ - Activate the `rpi:document-code` skill
- Read the plan completely and check for any existing checkmarks (- [x])
- Read the original ticket and all files mentioned in the plan
- **Read files fully** - never use limit/offset parameters, you need complete context
- Think deeply about how the pieces fit together
- Create a todo list to track your progress
- Start implementing if you understand what needs to be done
If no plan path provided, ask for one.
## Implementation Philosophy
Plans are carefully designed, but reality can be messy. Your job is to:
- Follow the plan's intent while adapting to what you find
- Implement each phase fully before moving to the next
- Verify your work makes sense in the broader codebase context
- Update checkboxes in the plan as you complete sections
When things don't match the plan exactly, think about why and communicate clearly. The plan is your guide, but your judgment matters too.
If you encounter a mismatch:
- STOP and think deeply about why the plan can't be followed
- Present the issue clearly:
```
Issue in Phase [N]:
Expected: [what the plan says]
Found: [actual situation]
Why this matters: [explanation]
How should I proceed?
```
## Verification Approach
After implementing a phase:
- Run the success criteria checks (usually `make check test` covers everything)
- Fix any issues before proceeding
- Update your progress in both the plan and your todos
- Check off completed items in the plan file itself using Edit
- **Pause for human verification**: After completing all automated verification for a phase, pause and inform the human that the phase is ready for manual testing. Use this format:
```
Phase [N] Complete - Ready for Manual Verification
Automated verification passed:
- [List automated checks that passed]
Please perform the manual verification steps listed in the plan:
- [List manual verification items from the plan]
Let me know when manual testing is complete so I can proceed to Phase [N+1].
```
If instructed to execute multiple phases consecutively, skip the pause until the last phase. Otherwise, assume you are just doing one phase.
do not check off items in the manual testing steps until confirmed by the user.
## If You Get Stuck
When something isn't working as expected:
- First, make sure you've read and understood all the relevant code
- Consider if the codebase has evolved since the plan was written
- Present the mismatch clearly and ask for guidance
Use sub-tasks sparingly - mainly for targeted debugging or exploring unfamiliar territory.
## Resuming Work
If no existing checkmarks, create feature branch from updated main. **Make sure you're on a feature branch before implementing!**
If the plan has existing checkmarks:
- Trust that completed work is done
- Pick up from the first unchecked item
- Verify previous work only if something seems off
Remember: You're implementing a solution, not just checking boxes. Keep the end goal in mind and maintain forward momentum.