prepare · git:20260923.e805728 · 2026-09-23 · sha256 0bb14131d9c3ebe7
prepare git:20260923.e805728A
Immutable. This exact content never changes and is served at /api/v1/blob/0bb14131d9c3ebe7.
--- name: prepare description: "Use before starting non-trivial work that needs a spec, or when unsure whether work belongs inline in this session or in Kraft." --- # Preparing work This is the layer above `kraft:handoff`: it defines the work first, then decides where it should run. **REQUIRED SUB-SKILL:** use `kraft:handoff` at the handoff step below if you haven't already. ## 1. Spec Run a spec skill - default `superpowers:brainstorming` - unless the user named a different one. Its own self-review and user-review gate cover "review the spec"; don't add a second review pass on top of it. ## 2. Judge Right after the spec, before touching a plan: - **Inline** - the spec came out spike- or bounded-classified. Go straight to the normal dev workflow (TDD, etc.) in this session. No plan doc needed: that's already bounded's own terminal state. - **Handoff** - the spec came out architectural-classified, or the user already said the work is too big for this session, needs gates, or spans sessions. Use `kraft:handoff` to file it, attaching the spec. Kraft's own chain plans it - don't write a plan doc just to hand it straight to something that writes its own. **Explicit user override wins outright.** If the user already said "do this inline" or "hand this to Kraft," skip judgment and honor that instead - still write the spec first. ## 3. Plan - only if the user explicitly asked for one A plan is bound to the code as it is right now; a spec isn't. A spec written today is still good in two days, a plan might not be - so don't produce one speculatively. If asked, run a plan skill - default `superpowers:writing-plans` - with its own review gate. Re-run the judgment above with the plan in hand (it sharpens the same inline/handoff call - e.g. a plan that turns out to be one small task can downgrade an architectural spec to inline), and attach the plan alongside the spec if handing off. **Do not put a full-test-suite run in the plan.** A plan headed for Kraft runs under a chain whose `verify` node already runs the suite (and local review) after every task, with its own fix loop - a task step that re-runs it is redundant work the chain repeats anyway. Per-task targeted tests (the test the task itself is about) stay in the plan; only the suite-wide run is out. ## 4. Auto mode If the user said `auto` (as an argument, e.g. `/prepare auto ...`) or used phrasing like "do this in auto" / "don't wait for me": skip the pre-execution confirmation in step 2 (or 3), act on the judgment immediately, and report the outcome afterward instead of asking first. Otherwise: state the judgment and a one-line reason, then stop and wait for the user to confirm or override it before executing.