What this update changes in the checks

No check changed: every fixed check gives the same answer before and after this update.

A tripped check is a label, not a verdict: read the matched text and the lines below. This week's updates that newly trip a check.

---
name: business-continuity
- description: Run a Business Impact Analysis, derive RTO/RPO/MTPD, and structure a BCP aligned to ISO 22301.
+ description: Guides running a Business Impact Analysis, deriving RTO/RPO/MTPD, and structuring a business continuity plan aligned to ISO 22301. Use when the user asks to write a BCP, perform a BIA, set recovery objectives, align with ISO 22301, or plan continuity for a cyber outage.
license: Apache-2.0
metadata:
- verified: "2026-10-20"
+ verified: "2026-11-17"
---
# Business continuity
Continuity is a business deliverable, not an IT one. You decide _which activities
- must survive, how fast, and how much data they can lose_ — then IT/DR
+ must survive, how fast, and how much data they can lose_; then IT/DR
(`load_skill disaster-recovery`) builds to those numbers. Anchor on **ISO 22301:2019**
(BIA is clause 8.2.2); the 2024 Amd 1 adds climate considerations.
verify: https://www.iso.org/standard/75106.html
## Business Impact Analysis (the BIA method)
Work activity-by-activity (a process/service, not a server). For each:
- 1. **Criticality** — what breaks if it stops? Score impact over _time_ (1h / 24h /
+ 1. **Criticality**: what breaks if it stops? Score impact over _time_ (1h / 24h /
1wk / 1mo) across axes: revenue, legal/regulatory, safety, contractual SLA,
reputation. Impact almost always grows non-linearly with outage duration.
- 2. **MTPD** (Maximum Tolerable Period of Disruption) — the outage length after which
+ 2. **MTPD** (Maximum Tolerable Period of Disruption): the outage length after which
the organisation's viability is irrevocably threatened. This is a _business
survival_ limit, set by the business, not negotiable down by IT convenience.
- 3. **Dependencies** — map upstream/downstream: apps, data, people/skills, facilities,
- suppliers, utilities. A process is only as recoverable as its slowest dependency;
+ 3. **Dependencies**: map upstream/downstream (apps, data, people/skills, facilities,
+ suppliers, utilities). A process is only as recoverable as its slowest dependency;
surface single points of failure here. A 1h-RTO app on a 3rd party with a 24h SLA
- is a lie — fix the dependency or relax the RTO.
- 4. **Minimum resources** — the floor of staff, systems, and data needed to run at a
- degraded-but-acceptable level (the MBCO — Minimum Business Continuity Objective).
+ is a lie; fix the dependency or relax the RTO.
+ 4. **Minimum resources**: the floor of staff, systems, and data needed to run at a
+ degraded-but-acceptable level (the MBCO, Minimum Business Continuity Objective).
Output: a prioritised list of critical activities with their MTPD, dependencies, and
- resource floor. Everything downstream derives from this — don't skip to solutions.
+ resource floor. Everything downstream derives from this; don't skip to solutions.
## Deriving RTO and RPO
Nested constraint: **RPO ≤ data-loss tolerance** and **RTO < MTPD** (always leave a
buffer; RTO == MTPD has zero margin and will breach).
- - **RTO** (Recovery Time Objective) — target time to restore the activity. Derive it
+ - **RTO** (Recovery Time Objective): target time to restore the activity. Derive it
_below_ MTPD with contingency for detection + decision + actual recovery, not just
the restore step.
- - **RPO** (Recovery Point Objective) — max acceptable data loss, in time. RPO directly
+ - **RPO** (Recovery Point Objective): max acceptable data loss, in time. RPO directly
sets backup/replication frequency: RPO 4h ⇒ you must capture state ≥ every 4h. RPO
- near-zero ⇒ synchronous replication (expensive — justify it from the BIA).
+ near-zero ⇒ synchronous replication (expensive; justify it from the BIA).
- Sanity check: every RTO/RPO has a cost. If everything is "Tier 0, RTO 0", the BIA
- wasn't done — force the business to rank, because the budget will.
+ wasn't done: force the business to rank, because the budget will.
## BCP structure (what the plan contains)
- - **Scope & roles** — activation authority, BC team, deputies (no single points).
- - **Per-activity recovery plan** — RTO/RPO, the workaround (manual/degraded mode to
+ - **Scope & roles**: activation authority, BC team, deputies (no single points).
+ - **Per-activity recovery plan**: RTO/RPO, the workaround (manual/degraded mode to
hit MBCO while systems recover), dependencies, and the restore procedure.
- - **Resource & contact directory** — staff, suppliers, sites, alternate-site arrangements.
- Keep an **offline copy** — a continuity plan only readable on the down system is useless.
- - **Communications plan** — internal cadence + external/stakeholder messaging (the crisis
+ - **Resource & contact directory**: staff, suppliers, sites, alternate-site arrangements.
+ Keep an **offline copy**: a continuity plan only readable on the down system is useless.
+ - **Communications plan**: internal cadence + external/stakeholder messaging (the crisis
layer: `load_skill crisis-management`).
- - **Maintenance** — review on change and at least annually; exercise the plan (DR test
+ - **Maintenance**: review on change and at least annually; exercise the plan (DR test
types in `disaster-recovery`).
- ## ISO 22301 alignment (PDCA, clauses 4–10)
+ ## ISO 22301 alignment (PDCA, clauses 4 to 10)
- Cl. 4 context & scope · Cl. 5 leadership + policy · Cl. 6 objectives · Cl. 7 resources/competence.
- - **Cl. 8 operation** — the engine: 8.2 BIA + risk assessment, 8.3 strategy selection,
+ - **Cl. 8 operation**, the engine: 8.2 BIA + risk assessment, 8.3 strategy selection,
8.4 procedures (BCP), 8.5 exercise programme.
- **Cl. 9** performance evaluation (metrics, internal audit, management review) · **Cl. 10**
- improvement (corrective action). It's a PDCA management system — certification needs
+ improvement (corrective action). It's a PDCA management system; certification needs
evidence of the loop turning, not a binder on a shelf.
## Ransomware lens
- Treat ransomware as a _continuity_ event, not just a security one: assume primary
systems AND online backups are simultaneously unavailable. Your RTO/RPO must hold when
- recovery starts from clean, offline copies (`load_skill backup-recovery`) — re-derive
+ recovery starts from clean, offline copies (`load_skill backup-recovery`); re-derive
RTO including rebuild-from-bare-metal + integrity-verification time, which dwarfs a
routine restore.
- BIA feeds the risk register: push critical-activity SPOFs into `load_skill risk-assessment`.