business-continuity · git:20261109.2971dcb · 2026-11-09 · sha256 1cb9c5f4cbc2d03f
business-continuity git:20261109.2971dcbA
Immutable. This exact content never changes and is served at /api/v1/blob/1cb9c5f4cbc2d03f.
No tool to install first
claude plugin marketplace add https://markdownregistry.com/mp/a/art_lq4gwx5rijkb2bzi/1cb9c5f4cbc2d03f8dcf202a686bf9005fe367981b8c1f0ef60723dbe4c8a3bf.json
Then /plugin install business-continuity@markdownregistry-lq4gwx5rijkb2bzi in Claude Code. It installs this exact version, the one graded A here, pinned to the commit it was graded at, and leaves it there.
--- name: business-continuity description: Run a Business Impact Analysis, derive RTO/RPO/MTPD, and structure a BCP aligned to ISO 22301. license: Apache-2.0 metadata: verified: "2026-10-20" --- # Business continuity Continuity is a business deliverable, not an IT one. You decide _which activities must survive, how fast, and how much data they can lose_ — then IT/DR (`load_skill disaster-recovery`) builds to those numbers. Anchor on **ISO 22301:2019** (BIA is clause 8.2.2); the 2024 Amd 1 adds climate considerations. verify: https://www.iso.org/standard/75106.html ## Business Impact Analysis (the BIA method) Work activity-by-activity (a process/service, not a server). For each: 1. **Criticality** — what breaks if it stops? Score impact over _time_ (1h / 24h / 1wk / 1mo) across axes: revenue, legal/regulatory, safety, contractual SLA, reputation. Impact almost always grows non-linearly with outage duration. 2. **MTPD** (Maximum Tolerable Period of Disruption) — the outage length after which the organisation's viability is irrevocably threatened. This is a _business survival_ limit, set by the business, not negotiable down by IT convenience. 3. **Dependencies** — map upstream/downstream: apps, data, people/skills, facilities, suppliers, utilities. A process is only as recoverable as its slowest dependency; surface single points of failure here. A 1h-RTO app on a 3rd party with a 24h SLA is a lie — fix the dependency or relax the RTO. 4. **Minimum resources** — the floor of staff, systems, and data needed to run at a degraded-but-acceptable level (the MBCO — Minimum Business Continuity Objective). Output: a prioritised list of critical activities with their MTPD, dependencies, and resource floor. Everything downstream derives from this — don't skip to solutions. ## Deriving RTO and RPO Nested constraint: **RPO ≤ data-loss tolerance** and **RTO < MTPD** (always leave a buffer; RTO == MTPD has zero margin and will breach). - **RTO** (Recovery Time Objective) — target time to restore the activity. Derive it _below_ MTPD with contingency for detection + decision + actual recovery, not just the restore step. - **RPO** (Recovery Point Objective) — max acceptable data loss, in time. RPO directly sets backup/replication frequency: RPO 4h ⇒ you must capture state ≥ every 4h. RPO near-zero ⇒ synchronous replication (expensive — justify it from the BIA). - Sanity check: every RTO/RPO has a cost. If everything is "Tier 0, RTO 0", the BIA wasn't done — force the business to rank, because the budget will. ## BCP structure (what the plan contains) - **Scope & roles** — activation authority, BC team, deputies (no single points). - **Per-activity recovery plan** — RTO/RPO, the workaround (manual/degraded mode to hit MBCO while systems recover), dependencies, and the restore procedure. - **Resource & contact directory** — staff, suppliers, sites, alternate-site arrangements. Keep an **offline copy** — a continuity plan only readable on the down system is useless. - **Communications plan** — internal cadence + external/stakeholder messaging (the crisis layer: `load_skill crisis-management`). - **Maintenance** — review on change and at least annually; exercise the plan (DR test types in `disaster-recovery`). ## ISO 22301 alignment (PDCA, clauses 4–10) - Cl. 4 context & scope · Cl. 5 leadership + policy · Cl. 6 objectives · Cl. 7 resources/competence. - **Cl. 8 operation** — the engine: 8.2 BIA + risk assessment, 8.3 strategy selection, 8.4 procedures (BCP), 8.5 exercise programme. - **Cl. 9** performance evaluation (metrics, internal audit, management review) · **Cl. 10** improvement (corrective action). It's a PDCA management system — certification needs evidence of the loop turning, not a binder on a shelf. ## Ransomware lens - Treat ransomware as a _continuity_ event, not just a security one: assume primary systems AND online backups are simultaneously unavailable. Your RTO/RPO must hold when recovery starts from clean, offline copies (`load_skill backup-recovery`) — re-derive RTO including rebuild-from-bare-metal + integrity-verification time, which dwarfs a routine restore. - BIA feeds the risk register: push critical-activity SPOFs into `load_skill risk-assessment`.