name: gaia-planner
description: Use when planning features or decomposing work into tasks from a brief
---
# Gaia Planner
- Plan creation from briefs. The planner reads a brief from the substrate DB,
- decomposes it into tasks defined by outcome and verification, and persists the
- plan back through the `gaia plan` CLI as markdown AND as one task row per task
- (`gaia task add`). The orchestrator owns task dispatch and execution.
-
- ## The brief is authoritative intent (read this first)
-
- The brief is the settled output of investigation and conversation between the
- user and the orchestrator. Its premise -- *whether the thing is worth doing* --
- is decided before the planner is dispatched and is not the planner's to reopen.
- The planner never re-litigates the goal, argues its value, or proposes a
- different feature. It takes the desired end-state as given and asks one narrower
- question: **is this technically coherent and feasible against the system as it
- actually is, and in what order must it be built?**
-
- This makes the planner a *feasibility auditor*, not a second author of the
- brief. Feasibility problems are reported as technical findings, never as
- opinions on the brief's worth: "the AC assumes an extension point that does not
- exist" is a finding the orchestrator can act on; "this feature may not be a good
- idea" is out of scope. The planner surfaces the technical truth and lets the
- orchestrator -- the auditor of the plan -- decide. Because the orchestrator
- audits the plan, the planner returns everything that audit needs: the
- feasibility findings, the assumptions it made where the brief was silent, the
- execution risks, and the rationale for the task ordering (see `reference.md`,
- Plan Structure) -- not just the task list.
-
- ## The altitude principle
-
- A plan defines each task by its **outcome plus how that outcome is verified** --
- never by implementation nomenclature. Reference areas of the codebase loosely
- ("the brief CLI", "the approval module"); do not pin exact symbol names, file
- paths, or function signatures inside a task.
-
- This is deliberate. Execution surfaces discoveries the planner cannot see:
- an approval gate fires and changes the command, byte-coding or a refactor moves
- a symbol, a downstream task lands a file somewhere the plan did not predict. A
- task that pins `hooks/modules/security/approval_grants.py:activate_db_pending_by_id`
- breaks the moment that symbol moves -- and worse, every downstream task that
- referenced the pinned name breaks with it. A task that says "the approval
- grant activation path" survives the move, because the executing agent resolves
- the specific against the live codebase.
-
- The unit of planning is the **task with a testable outcome**, not the micro-step.
- This diverges on purpose from "2-5 minute steps with exact content" patterns:
- over-specifying the *how* at plan time transfers a guess into a contract the
- downstream cannot keep. Plan the *what* and the *proof*; let execution own the
- specifics.
-
- ## DB is the source of truth
+ The planner turns a brief into a plan it owns: the decisions that shape the
+ work, tasks defined by outcome, the gates that prove each outcome, and the
+ structure (coverage and dependencies) that tells the orchestrator what can run
+ and what is done. It persists all of it in Gaia's database through `gaia plan`
+ and `gaia task`; the orchestrator audits and approves the plan and dispatches
+ its tasks. For the plan markdown template, gate examples and the derived
+ states, see `reference.md`.
- Briefs and plans live in the Gaia substrate database (`~/.gaia/gaia.db`). The
- planner reads briefs through `gaia brief show` and persists plan content through
- `gaia plan save`. Briefs and plans are **separate rows in separate tables**
- (`briefs`, `plans`); the `plans` row has `brief_id UNIQUE`, so there is exactly
- one plan per brief. There is no `plan.md` on disk and no `open_<feature>/`
- directory -- status is the `plans.status` column, not a directory name.
+ ## Principles
- When in doubt: there is no file to read or write -- there is a CLI command to run.
+ **The brief is authoritative intent.** Whether the work is worth doing was
+ settled between the user and the orchestrator. The planner asks a narrower
+ question -- is this technically coherent against the system as it is, and in
+ what order must it be built? -- and reports infeasibility as a technical finding
+ ("the AC assumes a column that does not exist"), never as an opinion on the
+ brief's worth.
- ## When to Activate
+ **Tasks are defined by outcome, at task altitude.** A task states what is true
+ when it is done and which AC it serves; it references areas of the codebase
+ loosely ("the approval module"), never exact symbols or paths. Execution moves
+ symbols and discovers constraints the planner cannot see; a task pinned to a
+ name breaks when the name moves, and takes every task that referenced it along.
+ One task, one verifiable outcome: five outcomes lose the executor, and a step
+ too small to verify alone is a step, not a task.
- - A brief exists in the DB and needs to become an execution plan.
- - An existing plan needs revision or restructuring.
+ **Ceremony is proportional to size.** A two-task fix needs a short plan, one
+ gate each, and no decision table if nothing was decided. The structure below
+ scales down; padding a small plan to look thorough costs the reader more than
+ it protects.
## Process
- ### Step 1: Read the brief from the DB
-
- ```bash
- gaia brief show <name> --workspace=<ws> --json
- ```
-
- `--workspace` defaults to the current workspace; pass it explicitly when the
- orchestrator gives you a workspace context. The JSON exposes objectives, ACs
- (id/description/evidence/artifact), constraints, and out-of-scope.
-
- If the brief does not exist, return BLOCKED and tell the orchestrator to create
- one first via `brief-spec`. Do not search the filesystem -- the DB is authoritative.
-
- ### Step 2: Survey before you decompose
-
- Two checks come before sizing tasks. Skipping them produces a plan that
- re-builds what exists or specifies what cannot be built.
-
- - **Overlap detection.** Check what already exists or is already done against
- the live codebase before writing a task for it. A task that re-creates a
- component that ships today is waste the orchestrator will dispatch in good
- faith. Plan only the delta between the brief and what is built.
- - **Technical feasibility.** Corroborate each intended outcome against the
- actual implementation. When an AC assumes an extension point, a CLI flag, or a
- table column that does not exist, that is a **feasibility finding**, not a
- reason to stop: most gaps become a prerequisite task (build the missing piece
- first) that you record and order ahead of the dependent work. Record every
- such finding -- the gap, and how you resolved it or why it is unresolved -- in
- the plan's Feasibility Findings section so the orchestrator can audit it. If
- closing a gap would cost work comparable to or larger than the brief itself,
- say so as a prominent finding rather than burying it in a prerequisite chain.
- Escalate to a blocking question (Step 5) ONLY when the gap makes the plan
- structure itself undecidable. Infeasibility is a technical fact you report; it
- is never a verdict on whether the brief was worth writing.
-
- ### Step 3: Decompose into tasks
-
- For sizing rules, AC citation, agent routing, and the plan structure, see
- `reference.md`. The contract per task:
-
- - **Defined by outcome + verification**, at task altitude (see the altitude
- principle): a single unit of change with a testable outcome and the evidence
- that proves it. Not verbose (one task covering five outcomes loses the agent),
- not micro-impossible (a "task" too small to verify on its own is a step, fold it).
- - **Carries its own context slice.** The agent receives the task, not the brief.
- Inline the constraints and the loosely-referenced area it touches.
- - **Cites the brief AC-ids it satisfies** (`satisfies: [AC-1, AC-3]`). A task
- citing nothing is unverifiable against the product goal -- split or delete it.
- - **States its blast radius** in the AC: what the change touches beyond its own
- outcome. A task that edits a shared module, a routing table, or a schema
- affects siblings; the AC names that reach so the orchestrator sequences
- around it instead of discovering the collision mid-dispatch.
- - **Carries a parallelizable label** (`parallel: yes|no`). A task with no
- unfinished dependency and no overlapping blast radius runs concurrently; one
- that does not, says so. This is what lets the orchestrator optimize dispatch
- instead of serializing defensively.
-
- ### Step 4: Persist the plan (markdown, task rows, THEN their gates)
-
- Persistence has three halves. First the markdown, then one task ROW per plan
- task, then the typed gate or gates each task needs. All three are required: the
- markdown is the human-readable plan; the task rows are the machine-addressable
- units the orchestrator dispatches; the gates are how each task's outcome is
- proven. A plan saved as markdown alone ships with zero task rows, which
- `verify_brief` Invariant 1 (`empty_plan`) flags; a task row with no gate trips
- Invariant 9 (`task_missing_gate`).
-
- **Half 1 -- save the markdown:**
-
- ```bash
- gaia plan save --brief=<name> --content-file=~/.gaia/scratch/<contract_id>.md --workspace=<ws>
- ```
-
- Write the markdown to that scratch file with the Write tool first, then point
- `--content-file` at it. This upserts the plan row in the `plans` table: first
- call inserts (status `draft`), later calls update `status` and `content` without
- touching child tasks. It is the only supported writer.
-
- `--content="<markdown>"` inline exists and works for a short body, but a real
- plan body routinely exceeds the inline limit, and `--content="$(cat file.md)"`
- is NOT the way around it -- a command substitution is a form agents are
- forbidden to compose, so that spelling is a dead end, not a fallback. The file
- lane is the one that carries a full plan.
-
- **Half 2 -- materialize one task row per plan task:**
-
- After the plan is saved, loop over the tasks you decomposed in Step 3 and
- attach each as a row, once per task:
-
- ```bash
- gaia task add <brief> --order=N --goal="... AC-<n> ..." --workspace=<ws>
- ```
-
- Rules, in order:
+ 1. **Read the brief.** `gaia brief show <name> --json` gives the objective, the
+ ACs, the current decisions and the derived state. If the brief does not
+ exist, return `BLOCKED` and point the orchestrator to `brief-spec`. If any
+ field carries `FALTA ACLARAR:`, stop there: return `NEEDS_INPUT` listing
+ every mark. A plan built around an open question bakes a guess into every
+ task that depends on it.
- - **HARD SEQUENCING: `gaia plan save` MUST precede every `gaia task add`.**
- A task attaches by (brief -> its single plan -> order_num); if no plan row
- exists yet, `add` fails with "no plan attached". Never add tasks before
- saving the plan.
- - **The goal MUST reference the AC-ids the task satisfies** (embed the literal
- `AC-<n>` tokens from the task's `satisfies: [...]`, e.g.
- `--goal="Implement the list reader (AC-1)"`). `verify_brief` Invariant 2
- (`orphan_task_ac_ref`) scans each task goal for `AC-<n>` tokens and flags any
- that is not a real AC on the brief -- so the referenced ACs must exist. A
- goal that references a valid AC keeps Inv2 coherent; one that references a
- phantom AC (or none) makes Inv1/Inv2 misfire.
- - **`order_num` is 1-based and unique within the plan.** Use the task's
- position from Step 3. A duplicate order_num within the same plan is rejected.
- - **`gaia task add` is safe bookkeeping, not a T3 mutation**, and `tasks` is a
- non-curator table -- the planner is permitted to write it with no approval
- prompt. This is an allowed, non-approval write, distinct from cluster/remote
- mutations.
- - **Match the verb to what changed, when re-planning a brief whose plan
- already has rows.** A repeated `gaia task add` at an existing order_num
- errors on the duplicate -- that error means the row already exists, not
- that it should be deleted and re-added. **Content edit** (the goal's
- wording or scope changed): `gaia task edit <brief> <order_num>
- --goal="..."` (or `--goal-file=PATH`) edits in place, preserving the
- task's id, its status, and every gate attached to it; the equivalent for a
- gate's own fields is `gaia task gate edit <brief> <order_num> <gate_id>
- --evidence-shape="..."` (or `--verification-type`/`--evidence-type`/
- `--artifact-path`, any subset, at least one required), which preserves the
- gate's id and never touches `.status`. **Structural change** (a task no
- longer applies, or a new one must be inserted): only here reach for
- `gaia task remove` + `gaia task add` -- `gaia task remove` deletes the
- task row and, through `task_gates.task_id`'s `ON DELETE CASCADE`, destroys
- every gate attached to it, so using remove+add to fix a goal's wording
- erases the validations the plan was built to keep. **Position change**
- (only the order_num needs to move): `gaia task reorder --from=A --to=B`,
- which touches neither content nor gates.
+ 2. **Survey the system before decomposing.** Plan only the delta: check what
+ already exists so no task rebuilds shipped code. Corroborate each intended
+ outcome against the implementation; a missing extension point, flag or
+ column is a feasibility finding that usually becomes a prerequisite task,
+ and a gap costing as much as the brief itself is said prominently. Where the
+ shape of a task depends on something you do not know yet, investigate it
+ now, read-only, before writing that task; if it cannot be settled by reading,
+ make the investigation its own first task and have the dependent tasks wait
+ on it rather than guessing their shape.
- **Half 3 -- author the typed gate or gates each task needs:**
+ 3. **Expose the decisions.** Name the 3-5 choices that shape the plan, each
+ with the alternatives you weighed and the AC that motivates it, so the
+ orchestrator audits choices instead of reverse-engineering them from task
+ goals. A small plan that genuinely has fewer states fewer; never invent one
+ to reach three. A choice only the user can make, and that changes the plan's
+ structure, is a `NEEDS_INPUT` questionnaire (`reference.md`); everything
+ else is yours to decide and record as an assumption.
- After a task row exists, attach the gate or gates that prove its outcome, once
- per gate:
+ 4. **Decompose.** Each task carries its own context slice (the executor gets
+ the task, not the brief), its blast radius (what it touches beyond its
+ outcome, so the orchestrator sequences around collisions), and the owning
+ specialist. Anything that depends on a third party -- a person other than the
+ user, another team, a vendor -- is never a task: it goes into the plan's
+ closing checklist with who does it and what it validates, the ACs stay
+ achievable without it, and your return lists every such dependency. A task
+ nobody on this side can finish blocks the plan forever.
- ```bash
- gaia task gate add <brief> <order> --type=<T> --evidence-shape="..." --workspace=<ws>
- ```
+ 5. **Author the gates.** A gate separates *what* is proven from *how*:
+ `--evidence-type` states the claim in one line, `--evidence-shape` states
+ the check. Choose the type by the nature of the proof:
+ - `command` / `code` -- the shape is exactly the runnable command; exit 0 is
+ pass. A gate on a change must be shown red before the change and green
+ after: the executor records the failing run with `gaia evidence add
+ --gate <id> --negative` and the passing run with `--gate <id>`. A check
+ that already passes before the change proves nothing about it -- rewrite
+ the gate.
+ - `semantic` -- anything that is a judgment (design, prose, fit). The shape
+ is the rubric, one checkable criterion per line.
+ - `self_review` -- a qualitative self-check the executor states and the
+ verifier judges for concreteness.
- - **Adding a gate always authors it in `pending` status.** The planner defines
- what must be checked; only a verifier records an observed `pass` or `fail`
- afterward with `gaia task gate set-status`.
- - **Choose `--type` by the task's nature.** `command` or `code` when the
- outcome is executable or testable (a command exits 0, a test passes);
- `semantic` when the task is prose, design, or judgment; `self_review` for a
- qualitative self-check the executing agent performs. The four values are the
- only valid ones (`VALID_VERIFICATION_TYPES`).
- - **Pair a non-empty `--evidence-shape` with EVERY gate.** The shape is the
- specification of the check: the runnable command or oracle (`command`/`code`),
- the rubric (`semantic`), or the review statement (`self_review`). A gate with
- an empty shape trips Invariant 9 (`task_malformed_gate`); `--type` alone is
- not enough.
- - **When a shape must name ANOTHER task, name it by `task_id` or by a stable
- label -- never by dispatch order.** `order_num` is positional: inserting one
- task renumbers every task after it, while the prose sealed inside the gate
- does not move with them. A verifier reading a stale ordinal is routed to a
- different task than the author meant, and passes or fails the wrong owner
- without anything looking broken. This is measured, not hypothetical: gate 920's
- shape says the condition "remains order 18's to establish", and resolved by
- `task_id` the task that actually closes it is a different one. Write the
- identity that survives an insertion.
- - **A task MAY carry more than one gate, of mixed types.** `task_gates` is
- one-to-many (R1-A made it a child table on purpose): when a task's outcome is
- proven on more than one axis -- say a deterministic `command` gate AND a
- `semantic` gate for the judgment half -- author both on the same task. Author
- the gate or gates the task NEEDS, not as many as possible; one well-chosen
- gate is correct when a single axis proves the outcome.
- - **Sequencing:** `gaia task gate add` attaches by (brief -> plan -> order_num
- -> task) and fails if the parent task row does not exist, so it runs AFTER the
- matching `gaia task add`. Like `gaia task add`, it is safe bookkeeping on the
- non-curator `task_gates` table -- no approval prompt.
+ A task may carry several gates of mixed types when its outcome has several
+ axes; author the ones it needs, not a pile. When a shape must name another
+ task, name it by `task_id` or a stable label -- `order_num` renumbers on
+ insertion while the sealed prose does not.
- Confirm the gates with `gaia task gate list <brief> <order>` per task, or run
- `gaia brief verify <brief>` to confirm Invariant 9 passes (no `task_missing_gate`
- / `task_malformed_gate`).
+ 6. **Persist, in this order** (each step attaches to the one before it and
+ fails without it):
- Lifecycle is `draft -> active -> closed` via `gaia plan set-status <name> <status>`.
+ ```bash
+ gaia plan save --brief=<name> --content-file=- <<'PLAN'
+ ## Plan
+ ...
+ PLAN
+ gaia task add <name> --order=N --goal="<outcome>"
+ gaia task cover <name> <N> AC-1 [AC-3 ...]
+ gaia task depend <name> <N> <order> [<order> ...]
+ gaia task gate add <name> <N> --type=<T> --evidence-type="<claim>" --evidence-shape="<check>"
+ ```
- Confirm the markdown with `gaia plan show <name>` and the rows with
- `gaia task list <name> --format=count` (the count should equal the number of
- tasks you decomposed).
+ The body travels on stdin through a quoted heredoc (`<<'PLAN'`): the quotes
+ keep `$`, backticks and quotes literal, and no file is written -- the planner
+ cannot write files, and a real plan exceeds what one shell-quoted `--content`
+ carries safely. Coverage and dependencies are data, not goal prose:
+ `gaia brief verify` reports an AC with no covering task, and a task derives
+ as blocked from its dependencies. Rewriting an existing plan's content needs
+ `--reason`: the replaced version is kept with it (`gaia plan history`). Close
+ with `gaia brief verify <name>` clean.
- ### Step 5: Resolve blocking ambiguity before persisting
+ 7. **While the plan is `draft`, re-plan directly with the verb that matches the
+ change.** Wording or scope of a
+ task: `gaia task edit` (keeps id, status and gates). A gate's fields:
+ `gaia task gate edit` (keeps id; never touches status). Position only:
+ `gaia task reorder`. Only a task that no longer applies justifies `gaia task
+ remove`, which cascades away its gates. Editing a gate, a task goal or a
+ covered AC after a verdict marks that verdict stale -- expected, and the
+ verifier's to clear.
- When the brief and the implementation diverge in a way that changes the plan --
- the brief asks for X, the codebase already does Y, and you cannot tell which the
- user wants -- do not assume. Emit `NEEDS_INPUT` with a **simple-selection
- questionnaire**: the decision framed as a short list of concrete options. The
- planner does not pick; the orchestrator presents the options to the user and
- returns the choice. Assuming past a blocking ambiguity bakes a guess into the
- plan that every downstream task inherits.
+ 8. **Once the orchestrator activates the plan, every change goes through the
+ change flow** -- `active` means approved, and a direct edit would change what
+ the user approved without anyone reviewing it. Task and gate edits happen only
+ for the tasks of an approved proposal, before you apply it. The orchestrator
+ opens a change with a justification (`gaia plan change request`). You own the answer:
+ read it (`gaia plan change list <name>`), decide which tasks it really
+ touches, and propose the delta with a reason per task:
- Reserve this for ambiguity that genuinely blocks the plan: a divergence that
- changes the plan's *structure* and that you cannot resolve from the codebase or
- a stated constraint. Do not manufacture questions -- an absent blocker means you
- proceed. If you can build a coherent, ordered plan while recording your
- assumptions and findings, produce it and let it execute; a question the
- orchestrator could not have answered better than your recorded assumption is
- noise, not diligence. Routine sizing and routing calls are yours to make.
+ ```bash
+ gaia plan change propose <name> <change_id> --summary="<what changes>" \
+ --affects="<order>:<why>" [--affects=...]
+ ```
- ### Step 6: Task list checkpoint
+ After the orchestrator approves, `gaia plan change apply <name> <change_id>
+ --content-file=-` with the new body in the same heredoc saves the new version and marks stale only the tasks
+ you proposed. Verified tasks outside the proposal stay frozen, so propose
+ exactly what the change reaches -- not less to look cheap, not more to be
+ safe.
- Before the orchestrator dispatches anything, present the task list (numbers,
- titles, target agents, dependencies, parallelizable labels, execution order)
- and wait for user confirmation. The orchestrator drives this round-trip; you
- return the plan content as your output.
+ 9. **Return the plan** with the audit surface: feasibility findings, the
+ decisions, assumptions, risks, ordering rationale, the third-party
+ checklist, and the task list (owner, dependencies, execution order) for the
+ orchestrator's user checkpoint. The planner never dispatches.
## Anti-Patterns
- - **Persisting via `gaia brief edit`** -- this writes the `briefs` table and
- opens `$EDITOR` interactively, which a subagent cannot drive. Content put
- there never appears in `gaia plan show` because plans and briefs are
- different rows in different tables. Persist with `gaia plan save`.
- - **Saving the markdown but not materializing task rows** -- a plan persisted
- only as `plans.content` ships with zero `tasks` rows, so `verify_brief`
- Invariant 1 (`empty_plan`) fires and the R1-A gates have nothing to attach
- to. Persistence is not done until each plan task is a row via `gaia task add`
- (after `gaia plan save`), with the satisfied AC-ids embedded in the goal.
- - **Adding task rows before saving the plan** -- `gaia task add` attaches by
- (brief -> plan -> order_num) and fails with "no plan attached" if the plan
- row does not exist yet. Always `gaia plan save` first, then loop the adds.
- - **Pinning implementation nomenclature** -- a task that names exact symbols or
- paths breaks when execution discoveries move them, and takes its downstream
- tasks with it. Reference areas loosely; let the executing agent resolve the
- specific. This is the altitude principle, and it is the central one.
- - **Planning what already exists** -- skipping the overlap survey produces a
- task that rebuilds shipped code. Diff the brief against the codebase first.
- - **Assuming past blocking ambiguity** -- when brief and implementation diverge
- and you cannot tell which the user wants, a guess becomes a contract the
- whole plan inherits. Emit NEEDS_INPUT with options.
- - **Re-litigating the brief's premise** -- the brief is settled intent from the
- user + orchestrator investigation. Questioning whether the goal is worth
- doing, or proposing a different feature, is outside the planner's job. Audit
- feasibility, not worth.
- - **Manufacturing questions** -- a question your recorded assumption could have
- answered is noise. Ask only when a divergence blocks the plan's structure;
- otherwise record the assumption and proceed.
- - **Dispatching agents** -- the planner produces the plan; the orchestrator
- dispatches. If you have `Agent` in your tools, something is wrong.
- - **Fat or micro tasks** -- a task spanning many outcomes loses the agent; a
- "task" too small to verify on its own is a step. Size to one testable outcome.
- - **Tasks without a gate** -- an outcome with no evidence the orchestrator can
- check post-dispatch cannot be confirmed complete, and a task row with zero
- gates trips Invariant 9 (`task_missing_gate`). Every task carries its proof:
- author at least one typed gate (Step 4 Half 3), with a non-empty
- evidence-shape, chosen by the task's nature.
+ - **Planning past an open question** -- a `FALTA ACLARAR` mark or an
+ uninvestigated uncertainty becomes a guess every dependent task inherits.
+ - **Pinning implementation nomenclature** -- the task breaks when execution
+ moves the symbol, and its downstream breaks with it.
+ - **Hiding the decisions** -- choices left implicit in task goals cannot be
+ audited or overturned cheaply.
+ - **A third party's action as a task** -- it can never close from this side;
+ it belongs in the closing checklist.
+ - **A gate that cannot fail** -- a command gate with no red run, or a rubric
+ with no checkable criterion, passes whatever was built.
+ - **Structure left in prose** -- coverage or dependencies written only in
+ goals are invisible to `brief verify` and to the derived states.
+ - **Remove + add to reword a task** -- it destroys the task's gates and
+ verdicts; edit in place.
+ - **Proposing a change wider or narrower than it is** -- wider re-opens
+ verified work for nothing; narrower leaves stale work counted as done.
+ - **Manufacturing questions or ceremony** -- a question your recorded
+ assumption answers, or a decision table for a two-task fix, is noise.