cvg-plan-loop ยท diff
git:20260913.efcb5b0 to git:20260913.5b2ea3c
16 added, 28 removed. Audit A to A.
---
name: cvg-plan-loop
- description: Orchestrate a monitored planning loop where a planner drafts the plan and fresh plan reviewers gate the exit. Use when the user asks to create or revise a plan through supervised specialist sessions on Codex threads or Claude Code background agents.
+ description: Orchestrate a monitored planning loop where a planner drafts the plan and independent plan review with focused rechecks gates completion. Use when the user asks to create or revise a plan through supervised specialist sessions on Codex threads or Claude Code background agents.
argument-hint: "[planning goal, requirements path, behavior contract path, or planning prompt]"
---
# Plan Loop
Use this skill for plan-only cvg-multi-session orchestration.
- Before doing anything, open and read `references/cvg-multi-session-protocol.md`, then apply the protocol gates from `cvg-multi-session`:
+ Read `references/cvg-multi-session-protocol.md` once when entering the loop, then apply the protocol gates from `cvg-multi-session`:
- transport binding gate,
- real specialist session gate,
- orchestrator callback transport gate,
- waiting handoff gate,
- cvg-plan-review-feedback gate,
- - fresh-reviewer exit gate.
+ - independent-review exit gate.
Do not implement product code in this workflow.
## Phase 0: Orchestrator Setup
Record:
- current orchestrator session id (Codex thread id; on Claude Code the harness tracks it),
- worktree or repo path,
- current `git rev-parse HEAD` if available,
- dirty worktree state,
- source prompt or input document,
- expected plan path or target docs directory when known,
- the loop ledger path, created per the Gate 5 loop-ledger rule.
Classify dirty files:
- plan-owned files,
- unrelated user artifacts,
- files the planner must not touch.
## Phase 1: Planner Handoff
Spawn the planner as a real specialist session (Gate 0 spawn operation) and
record the id returned by the tool. Verify it per Gate 1; if it is not
verifiable, do not continue.
(Codex) After verification, send the planner its verified task id before
creating the heartbeat.
Planner prompt must include:
- role: planner,
- callback destination per Gate 2,
- required planning skill, such as `cvg-plan` or another user-specified plan skill,
- source prompt, requirements path, or exact user goal,
- repo path and starting state,
- dirty-state warning when present,
- plan-only boundary,
- output path rules,
- task-specific external side-effect boundary,
- callback transport block,
- callback template.
Do not restate the planning skill's process or paste broad repo rules, likely
files, or local policy summaries unless they are the user's source authority.
Planner callback template:
```text
I am the planner. My specialist id is <planner-id>. This planning round is complete. Plan path: <absolute path>. Key status: <brief>. Please decide the next step.
```
Complete the waiting handoff per Gate 3 and end the active turn.
## Phase 2: Fresh Plan Review
After the planner callback is visible, spawn a new fresh reviewer specialist
session and verify its id per Gate 1.
Reviewer prompt must include:
+ - original user outcome, non-goals and authorized changes,
+ - required independent reviewer signatures, if the user specified any,
- role: fresh plan reviewer,
- the line `Do not consult project memory, prior sessions, rollout summaries, or external history. The repository's own git history (log, blame, commit messages) is repo evidence, not external history.` before the required skill line,
- callback destination per Gate 2,
- required cvg-plan-review skill, such as `cvg-plan-review`,
- original planning goal or source prompt,
- plan path,
- repo path,
- read-only boundary,
- blocker-only reporting rule,
- task-specific external side-effect boundary,
- callback transport block,
- callback template.
Do not paste the full planning prompt or all context documents when the plan
links its authorities and the reviewer can read the worktree.
Reviewer callback template:
```text
I am the fresh reviewer. My specialist id is <reviewer-id>. This first-pass full review is complete. Verdict: <clean / blocking findings>. Findings: <none or numbered concise list>. Please decide the next step.
```
Complete the waiting handoff per Gate 3 and end the active turn while waiting.
Blocking plan findings include:
- missing required surface,
- incomplete behavior contract coverage,
- wrong ownership boundary,
- unclear external or API contract,
- missing migration, rollback, deletion, privacy, or safety lifecycle,
- insufficient test or verification gate,
- plan criterion that cannot be implemented as written,
- unsafe side-effect assumption.
## Phase 3: Return Review Feedback to Planner
If the reviewer reports blockers, send the reviewer feedback to the same verified planner session with the continue operation (Gate 0).
- Do not classify findings, choose revision strategy, filter reviewer output, or turn the review into an edit list in the orchestrator.
+ Adjudicate per Gate 4 before routing; retain original findings and reasons in
+ the loop ledger.
The feedback prompt must include:
- callback destination per Gate 2,
- reviewer specialist id,
- required feedback skill: `cvg-plan-review-feedback`,
- original planning goal and source prompt,
- current plan path and related contracts,
- - exact reviewer blocker findings appended under a `Plan Review Feedback Input` section,
+ - exact reviewer findings and evidence-based adjudications under a
+ `Plan Review Feedback Input` section,
- task-specific external side-effect boundary,
- callback transport block,
- callback template.
Do not restate the feedback skill's intake, classification, or revision rules.
Complete the waiting handoff per Gate 3 and end the active turn.
## Phase 4: Focused Re-Review
After the planner feedback callback is visible and a reviewable plan revision exists, send a focused re-review request to the same verified reviewer session with the continue operation.
Focused scope:
- verify old blockers were addressed,
- check directly related contradictions introduced by the revision,
- do not redo broad review unless the plan's core design changed.
The focused re-review prompt must include the callback
transport block and exact callback template.
Complete the waiting handoff per Gate 3 and end the active turn.
If the planner reports a contract decision, escalation, or clarification need, route that callback to the appropriate reviewer or user decision before requesting re-review.
If same reviewer still finds blockers, repeat Phase 3.
- If same reviewer passes, do not exit. Continue to Phase 5.
-
- ## Phase 5: Final Fresh Review
-
- Spawn a new fresh reviewer specialist session for a complete first review of the revised plan. Verify its id per Gate 1.
-
- Use the same minimal reviewer prompt shape from Phase 2. The new fresh reviewer
- must deliver its callback to the orchestrator per Gate 2; do not accept a
- result left only inside the specialist session when the platform requires an
- explicit callback send.
-
- Final exit condition:
-
- - new fresh reviewer,
- - complete first review,
- - no blocking findings.
+ If the same reviewer passes, evaluate completion in Phase 5.
- Only then can the orchestrator declare the plan loop complete.
+ ## Phase 5: Review Exit
- If the final fresh reviewer finds blockers, repeat from Phase 3. Each
- Phase 3-5 cycle is one round; after 3 rounds without a clean final review,
- stop and escalate to the user with all open findings and their adjudications
- (Gate 5 round cap). Apply the Gate 5 adjudication ratchet: findings previously
- adjudicated invalid or out of scope cannot re-block without new evidence.
+ Apply Gate 5 for completion, new full-review conditions, adjudications and the
+ original repair-round cap. When another full review is warranted, use the
+ Phase 2 prompt and verify the new specialist identity. Carry non-blocking P2
+ notes into the completion summary.
## Completion Summary
Report:
- plan path,
- planner specialist id,
- reviewer specialist ids,
- callback transport status,
- blockers and planner `cvg-plan-review-feedback` results,
- - final fresh reviewer verdict,
+ - independent review verdict and focused rechecks,
- heartbeat cleanup (Codex),
- known gaps.