long-task-continuation · git:20260916.2732180 · 2026-09-16 · sha256 f7d4353a2c33bb69
long-task-continuation git:20260916.2732180A
Immutable. This exact content is served forever at /api/v1/blob/f7d4353a2c33bb69.
--- name: long-task-continuation description: "Use when a task is multi-step, may span context resets or sessions, uses subagents, or risks losing state before completion." --- # Long Task Continuation ## Overview Keep long work checkpointed, resumable, drift-aware, and evidence-gated. This protocol does not execute plans, dispatch subagents, run tests, or grant completion authority. ## Authority Boundary The Method Pack owns continuation discipline only. It does not own the parent plan, host retry/watchdog behavior, authoritative `GateDecision`, evidence sufficiency, requirement acceptance, or completion. ## When To Use Use this skill when the work has meaningful phases, may be compacted/resumed or handed off, uses subagents, or explicitly needs continuity and drift control. Architecture, contract, shared-workflow, and verification-gate changes also benefit from it. Do not force it onto a short answer or one-command check. Choose exactly one state carrier: - use a durable `work/` record for medium+ work that actually crosses sessions, needs handoff, or requires resumable state; - otherwise keep one inline checkpoint. Multi-step, todo-driven, possible-compaction, and subagent use do not force durable records by themselves. Do not create both carriers or a record per slice. ## Required Artifacts A durable task has one process trail under `docs/aegis/work/YYYY-MM-DD-<slug>/`. It keeps logical intent/baseline state, the latest todo/checkpoint/resume state, terminal evidence/drift state, and a completion reflection when warranted. These are `TaskIntentDraft`, `BaselineReadSetHint`, `BaselineUsageDraft`, `ImpactStatementDraft`, `TodoCheckpointDraft`, `ResumeStateHint`, `DriftCheckDraft`, and `EvidenceBundleDraft` views—not authoritative runtime records or separate plan owners. When creating a new durable work record, updating helper-backed sidecars, recording retry/attempt convergence, or preparing a completion bundle, read `durable-work-guidance.md` completely. It owns artifact layout and `<aegis-workspace-helper>` command detail; this file owns carrier selection, resume order, drift decisions, and stop conditions. An `Execution Readiness View` may be kept in the intent or active checkpoint for medium/high, handoff-prone, long-running, subagent-driven, architecture, contract, compatibility, or retirement-sensitive work. It renders existing intent, scope, baseline, owner, test, review, and drift constraints; it is not a new JSON artifact or completion authority. Planless Slice Lane: - When an existing parent plan/spec owns a bounded task, reuse it and the current checkpoint. For a no-parent direct bounded request with no new durable or unclear verification boundary, use an inline checkpoint. - State one compact `Slice Card`: Goal, `Parent plan/spec` (or `none — direct bounded request`), Files, Boundary, Verification, and Stop. - The slice goal closes only that slice. Final completion returns to the parent or direct bounded request through `verification-before-completion`. - Do not create a plan/spec merely to give a micro-slice a parent, and do not create per-slice plans/specs or work records. - Escalate when a new owner, contract, schema, public API, architecture, migration, persistence, security/permission, distribution/release surface, unclear verification boundary, or mismatch with parent scope or acceptance appears. When durable architecture decisions are in scope, these work records are the preferred ADR Auto Backfill source. Preserve decision signals, source refs, alternatives, compatibility, retirement, drift, and baseline-sync questions. ## Start Protocol Before execution: 1. Capture requested outcome, scope, non-goals, risks, parent plan/goal, success evidence, and stop states (`done | blocked | needs-verification | scope-exceeded`). 2. Identify required baseline refs and record acknowledged, cited, and missing refs. Missing authority pauses in `needs-baseline-readback`. 3. Choose inline or durable state once, then record the todo map, active slice, completed slices/evidence, blockers, next step, and current branch/HEAD. 4. When an `Execution Readiness View` exists, retain its intent lock, scope fence, baseline lock, compatibility/retirement boundary, tests, reviews, evidence, and rewind rules. 5. For a new helper-backed record, use `durable-work-guidance.md` to create and structurally check it before implementation. ## Retry Convergence Protocol A failed verification is another attempt in the current slice, not a new slice. Keep failed-attempt telemetry out of terminal evidence and normal commits. Only `evidence-finalized`, `blocked`, or `abandoned` is terminal. When retry state reaches `process-artifact-pressure`, stop auto-retry and route to `systematic-debugging` or `verification-before-completion`. Load the durable reference only when the attempt/evidence commands or sidecar rules are needed. ## Per-Slice Protocol Before each slice, state the current goal/todo, intended edits, explicit non-edits, verification, and readiness alignment. A bounded parent-plan or no-parent slice uses the compact Slice Card rather than a new plan/spec. After each slice, update completed todos, evidence refs, newly used baseline refs, blockers, next step, and drift decision. When an active helper-backed work record exists, read `durable-work-guidance.md` and update that same record; never create another workstream for bookkeeping. When patch-shape/ripple triage, an H-class finding, or a bounded compatibility mitigation fired, a locally green result does not clear the direction. Retain `PatchShape`, `CanonicalOwner`, `UpwardDrillSignal`, latest outcome, and one bounded evidence ref; do not copy raw logs or full diffs. If no fresh evidence exists, the state is `needs-verification` or `partial`. ## Resume Protocol Resume in this order: 1. Read original intent, parent plan/goal, latest checkpoint and resume hint. 2. Re-read required baseline refs and relevant active `CONTEXT.md` language. 3. Read the `Execution Readiness View` when present. 4. Compare checkpoint branch/HEAD, completed commits, evidence refs, and claims with the current worktree. 5. Compare the active slice against intent lock, scope fence, baseline lock, compatibility/retirement boundary, tests, reviews, and non-goals. 6. Re-run the drift decision, then name the next smallest authorized action. Any disagreement among plan, checkpoint, baseline, context, readiness view, or worktree pauses execution. A semantic conflict routes to `establishing-project-context`; an unplanned repair re-reads the retained invariant, owner seam, patch shape, and causal topology, then route comparison to `systematic-debugging`. A new carrier name alone does not prove a new direction. Never resume from memory alone. ## Drift Check Check original intent and stop condition, parent scope/acceptance, compatibility, new owners/fallbacks/adapters/branches, retirement, evidence freshness, and any readiness locks. Allowed decisions are `continue`, `pause-for-user`, `needs-baseline-readback`, `needs-verification`, and `blocked`. Never emit `gate-passed`, `completion-granted`, or `authoritatively-safe`. ## Completion Candidate Protocol Before a completion claim: 1. Use `aegis:verification-before-completion`. 2. Confirm every todo has status, blockers are resolved/externalized, evidence covers acceptance, and drift has no blocking state. 3. If a durable record exists, load `durable-work-guidance.md` for the completion bundle and structural workspace check. 4. For durable architecture work, pass the work record, proof bundle and ADR signals to verification for ADR Backfill Check. Generated packs are future-runtime inputs only. Method Pack output remains verified evidence and advisory judgment, not authoritative completion. ## Minimal Reporting Shape Report naturally and omit empty structures. Keep these semantic slots visible: `Aegis Visibility`; current todo/active/completed/next; baseline usage decision; readiness state when present; fresh evidence; retry/convergence state when relevant; drift decision; risk/unknown; and the next smallest safe action.