deploy-checklist · git:20261104.5e3cd8e · 2026-11-04 · sha256 4bef5973ca3a493b
deploy-checklist git:20261104.5e3cd8eA
Immutable. This exact content never changes and is served at /api/v1/blob/4bef5973ca3a493b.
---
argument-hint: '[service or release name]'
description: Pre-deployment verification checklist. Use when about to ship a release, deploying a change with database migrations or feature flags, verifying CI status and approvals before going to production, or documenting rollback triggers ahead of time.
metadata:
github-path: engineering/skills/deploy-checklist
github-ref: refs/heads/main
github-repo: https://github.com/anthropics/knowledge-work-plugins
github-tree-sha: fa2f425b6589365744fe07e87d9ece3573440c7e
name: deploy-checklist
---
# /deploy-checklist
> If you see unfamiliar placeholders or need to check which tools are connected, see [CONNECTORS.md](../../CONNECTORS.md).
Generate a pre-deployment checklist to verify readiness before shipping.
## Usage
```
/deploy-checklist $ARGUMENTS
```
## Output
```markdown
## Deploy Checklist: [Service/Release]
**Date:** [Date] | **Deployer:** [Name]
### Pre-Deploy
- [ ] All tests passing in CI
- [ ] Code reviewed and approved
- [ ] No known critical bugs in release
- [ ] Database migrations tested (if applicable)
- [ ] Feature flags configured (if applicable)
- [ ] Rollback plan documented
- [ ] On-call team notified
### Deploy
- [ ] Deploy to staging and verify
- [ ] Run smoke tests
- [ ] Deploy to production (canary if available)
- [ ] Monitor error rates and latency for 15 min
- [ ] Verify key user flows
### Post-Deploy
- [ ] Confirm metrics are nominal
- [ ] Update release notes / changelog
- [ ] Notify stakeholders
- [ ] Close related tickets
### Rollback Triggers
- Error rate exceeds [X]%
- P50 latency exceeds [X]ms
- [Critical user flow] fails
```
## Customization
Tell me about your deploy and I'll customize the checklist:
- "We use feature flags" → adds flag verification steps
- "This includes a database migration" → adds migration-specific checks
- "This is a breaking API change" → adds consumer notification steps
## If Connectors Available
If **~~source control** is connected:
- Pull the release diff and list of changes
- Verify all PRs are approved and merged
If **~~CI/CD** is connected:
- Check build and test status automatically
- Verify pipeline is green before deploy
If **~~monitoring** is connected:
- Pre-fill rollback trigger thresholds from current baselines
- Set up post-deploy metric watch
## Tips
1. **Run before every deploy** — Even routine ones. Checklists prevent "I forgot to..."
2. **Customize once, reuse** — Tell me your stack and I'll remember your deploy process.
3. **Include rollback criteria** — Decide when to roll back before you deploy, not during.