risk-assessment · diff
git:20261109.2971dcb to git:20261117.c5023d4
13 added, 12 removed. Audit A to A.
What this update changes in the checks
No check changed: every fixed check gives the same answer before and after this update.
A tripped check is a label, not a verdict: read the matched text and the lines below. This week's updates that newly trip a check.
---
name: risk-assessment
- description: Run a structured asset-threat-likelihood-impact risk assessment and emit a risk register.
+ description: Guides a structured asset-threat-likelihood-impact risk assessment with 5x5 scoring and treatment choice, emitting a risk register. Use when the user asks to run a cyber or information-security risk assessment, build or update a risk register, score risks, or choose risk treatment (mitigate, transfer, accept, avoid).
license: Apache-2.0
metadata:
- verified: "2026-10-20"
+ verified: "2026-11-17"
---
# Risk assessment workflow
- Turn loose findings into a scored, treatable register. Consume pentest output
- first: `read_file /work/findings.md` (or `findings.jsonl`) — each confirmed
+ Turn loose findings into a scored, treatable register. Consume recorded findings
+ first: `read_file /work/findings.md` (or `findings.jsonl`; marq records OSINT exposures, and pentest results
+ staged in `/work` work too). Each confirmed
finding is a candidate risk. Don't re-discover what the engagement already proved.
## 1. Scope the assets
- List assets in scope: systems, data stores, processes, third parties. One row each.
- Tag each with a value driver: confidentiality / integrity / availability it serves,
and a rough business value (regulated data? revenue path? safety?).
## 2. Pair asset x threat
- - For each asset name the realistic threats (not every STRIDE box — what actually
+ - For each asset name the realistic threats (not every STRIDE box: what actually
applies). A finding from `findings.md` IS a threat with proof: cite its id.
- Skip theoretical threats with no exposure; note why (compensating control exists).
## 3. Score likelihood x impact (5x5)
- Likelihood — how plausible in the next 12 months:
+ Likelihood: how plausible in the next 12 months:
| L | Meaning |
| ---------------- | -------------------------------------------------- |
| 1 Rare | No known path; needs insider + luck. |
| 2 Unlikely | Theoretical, hard, no evidence seen. |
| 3 Possible | Plausible; skilled attacker, some barrier. |
| 4 Likely | Easy/known technique; exposure confirmed in recon. |
| 5 Almost certain | Trivial / actively exploited / already happening. |
- Impact — worst credible business outcome:
+ Impact: worst credible business outcome:
| I | Meaning |
| ------------ | --------------------------------------------------------- |
| 1 Negligible | Cosmetic; no data/availability loss. |
| 2 Minor | Single user/record; quick recovery. |
| 3 Moderate | Limited breach, SLA breach, modest fine. |
| 4 Major | Sensitive data loss, multi-day outage, regulatory report. |
| 5 Severe | Mass breach, safety, existential fine, license loss. |
Risk = L x I (1-25). Bands: 1-4 Low, 5-9 Medium, 10-15 High, 16-25 Critical.
- A pentest finding's severity maps in as a sanity check — if a Critical finding
+ A pentest finding's severity maps in as a sanity check; if a Critical finding
scores Low here, your likelihood is probably wrong; reconcile, don't average.
## 4. Choose treatment
| Option | Pick when |
| -------- | ----------------------------------------------------------------------------------------------------------- |
| Mitigate | Cost-effective control exists and risk > appetite. Default. |
| Transfer | Loss is insurable / outsourceable; you can't reduce likelihood. |
| Avoid | Risk has no business upside; kill the feature/asset/integration. |
| Accept | Residual <= appetite, or mitigation costs more than the loss. Needs a named owner + sign-off + review date. |
## 5. Emit the register
Write `/work/risk-register.md` with `write_file`, one row per risk:
| ID | Asset | Threat (finding ref) | L | I | Score | Band | Treatment | Owner | Target date | Residual |
| --- | ----- | -------------------- | --- | --- | ----- | ---- | --------- | ----- | ----------- | -------- |
- Residual = re-score L x I assuming the treatment lands.
- For each Critical/High, also `report_finding` so it flows into `render_report`
- alongside the technical findings — one deliverable, not two.
+ alongside the technical findings; one deliverable, not two.
## Notes
- Qualitative 5x5 is right for triaging a register; for a **top risk driving a real spend
- decision**, complement it with a quantitative pass — FAIR-style, loss = frequency x
- magnitude in dollars — so treatment cost can be weighed against expected loss.
+ decision**, complement it with a quantitative pass (FAIR-style, loss = frequency x
+ magnitude in dollars) so treatment cost can be weighed against expected loss.
`load_skill board-metrics-reporting`.
- - Inherent (no controls) vs residual (with controls) — state which you scored; be consistent.
+ - Inherent (no controls) vs residual (with controls); state which you scored; be consistent.
- Framework-specific risk methods (ISO 27005, NIST 800-30): `load_skill iso27001,nist-csf` and
web-fetch the current clause rather than guessing the steps.