# Operate the release flow
Treat CI-green pull requests as integration evidence and release promotion as a
separate, stronger decision:
```text
short-lived branch -> main -> production -> vX.Y.Z
^ ^
integration release readiness
```
Keep `main` as the default branch. Do not create `develop` or `pre-production`.
Use a temporary `release/vX.Y` branch only when `main` must advance while an
exact candidate is stabilized.
Read `docs/RELEASE.md` completely before `promote` or `cut`; it is the
authoritative command-level procedure. Keep it and this lifecycle contract
aligned in the same pull request.
## Non-negotiable rules
- Merge product and quality changes into `main` through pull requests.
- Accept changes into `production` only through a release-promotion pull request.
- Never tag `main`; tag the exact `production` commit approved for release.
- Never selectively promote commits from `main`. Promote its complete tree.
- Never force-move or reuse a published tag.
- Publish only the tag-driven GitHub Release. Do not publish the frozen Python
compatibility reference to PyPI or the Rust crates to crates.io.
- Release native binaries for macOS arm64, Linux x64, Linux arm64, and Windows
x64 only. Intel macOS (`macos-x64`) is not supported.
- Populate the GitHub Release body from the matching non-empty changelog section.
- Fix defects upstream in `main` first, then promote downstream. Use the hotfix
exception only when unreleased `main` cannot safely ship.
- Stop before a push, production merge, tag, release publication, or branch
protection change unless the user explicitly authorized that exact action.
## Route the invocation
Interpret `$ARGUMENTS` as one of these operations. If the operation or version
is missing, inspect the repository state and ask only for the decision that
cannot be derived safely.
| Operation | Outcome |
|---|---|
| `adopt` | Bootstrap and protect `production` |
| `integrate` | Merge a feature, fix, or quality improvement into `main` |
| `promote` | Prove the current release candidate and propose `main -> production` |
| `cut X.Y.Z` | Prepare, promote, tag, and observe version `X.Y.Z` |
| `hotfix X.Y.Z` | Patch the released line without pulling unreleased `main` into production |
## Adopt the flow
1. Fetch remote branches and tags. Require a clean worktree.
2. Identify the latest published `vX.Y.Z` tag and verify its release exists.
3. Create `production` at that tag, not at a newer unreleased `main` commit.
4. If that released baseline predates `.github/workflows/production-policy.yml`,
bootstrap it before requiring the check: create `release/vX.Y` from
`production`, add the exact workflow already reviewed on `main`, open a pull
request to `production`, and manually verify both the allowed source ref and
byte-for-byte workflow match. Merge that one bootstrap pull request only
after explicit approval. A `pull_request_target` workflow absent from the
base branch cannot validate its own first installation.
5. Protect `main` and `production` from direct pushes and force pushes.
6. Require normal CI and review on `main` pull requests.
7. Add a required policy status check for pull requests whose base is
`production`. Make it reject every head except `main`, `release/vX.Y`, or
`hotfix/vX.Y.Z`; branch protection alone cannot restrict the source branch.
8. Require the release gate and explicit approval on `production` promotion
pull requests. Treat adoption as incomplete until the source-policy check is
required by the `production` ruleset.
9. Keep tag creation as the publication trigger in `.github/workflows/release.yml`.
If no release has ever been published, require the user to identify the initial
production baseline. Do not guess it from branch age.
## Integrate and improve on main
1. Start from current `main` on a short-lived branch named for the change, such
as `feat/...`, `fix/...`, `quality/...`, or `refactor/...`.
2. Apply the narrowest relevant checks before the repository-required gate.
3. Open a pull request to `main` with the contract, risk, and replayable evidence.
4. Merge when the integration gate passes. Do not claim that this makes the
commit release-ready.
5. Continue audits, formalization, tests, refactoring, and defect fixes through
new pull requests to `main` until the complete `main` tree meets the release
gate.
Keep `main` releasable as a whole. Leave incomplete behavior unmerged unless it
is isolated by an already-required explicit configuration boundary. Do not add
a feature-flag system solely to accommodate this flow.
## Promote main to production
1. Verify `production` is an ancestor of, or can be merged cleanly with, `main`.
- 2. Freeze the candidate by recording the exact `main` SHA in the promotion pull
- request. If unrelated changes land, rerun the gate or replace the candidate.
+ 2. Freeze the candidate by recording the exact `main` SHA. Follow the canonical
+ pinned-head and pre-/post-merge tree-identity procedure in
+ `docs/RELEASE.md` §2, steps 3–4: create the candidate branch at that SHA,
+ use it as the promotion pull request head, and perform both identity checks.
+ Do not open a moving `main -> production` pull request. If unrelated changes
+ land, rerun the gate or replace the candidate.
3. Confirm the release commit preparation is already on `main`:
- bump `rust/Cargo.toml`'s workspace version and regenerate `rust/Cargo.lock`
with Cargo; do not bump the frozen `pyproject.toml` package for a native
GitHub Release;
- ran `tools/aggregate_changelog.sh release --version X.Y.Z --date YYYY-MM-DD`,
moving `[Unreleased]` entries and aggregating every `changelog.d/`
fragment under `## [X.Y.Z] - YYYY-MM-DD`, leaving `[Unreleased]` and
`changelog.d/` both empty;
- update comparison links and confirm the matching changelog section is a
non-empty Release body.
4. Run `./tools/check-native-integration.sh` and dispatch the release workflow's
manual artifact build. Verify the completed run's `head_sha` equals the
recorded candidate SHA; discard and rerun evidence produced from a moving
branch after it advances. Confirm all four native targets, the Agent Skill
bundle, the VS Code extension, and both Kernel bundles pass.
`workflow_dispatch` is non-publishing and must never attach Release assets, even for a tag ref. Add
focused formal, mutation, platform, or compatibility evidence when the
changed contract requires it.
- 5. Open `main -> production`. State the candidate SHA, version, included changes,
- known residual risk, exact gates, and artifact evidence.
- 6. Merge without squashing away the promoted history. Verify the resulting
- `production` tree matches the approved `main` tree. Record the new production
- merge SHA; it is distinct from the gated candidate SHA unless promotion was a
- true fast-forward.
+ 5. Open the promotion pull request from the pinned candidate branch to
+ `production`. State the candidate SHA, version, included changes, known
+ residual risk, exact gates, and artifact evidence.
+ 6. Complete the canonical checks in `docs/RELEASE.md` §2, step 4 before and
+ after merge. Record the new production merge SHA; it is distinct from the
+ gated candidate SHA unless promotion was a true fast-forward.
Do not merge newer `main` work into an open promotion implicitly. Close or update
- the promotion and rerun its evidence against the new SHA.
+ the promotion and rerun its evidence against the new SHA. Before the next
+ promotion, also follow `docs/RELEASE.md` §2's required v4.4.1 carry-forward:
+ explicitly reapply `docs/DESIGN-nested-option-support.md` and verify that it
+ exists on `production` after merge.
## Cut the release
After the promotion is approved and merged:
1. Verify the requested version is valid SemVer and absent from local and remote
tags and releases.
2. Verify `production` HEAD has the prepared Rust workspace version, lockfile,
changelog, and non-empty version section.
3. Rerun `./tools/check-native-integration.sh` on exact `production` HEAD. Dispatch
the manual release artifact workflow from `production`, verify its `head_sha`
equals that HEAD, and require every job to pass. Never reuse evidence from the
pre-merge candidate for a distinct production merge commit.
4. Regenerate a temporary notes file from the exact production HEAD's matching
changelog section, show it to the user, and stop if it is empty; never reuse
notes derived from the pre-promotion candidate.
5. Create annotated tag `vX.Y.Z` at the gated `production` HEAD.
6. Before pushing, state the tag, commit SHA, exact notes, and that the push
uploads a draft, verifies its remote inventory, then makes the notes, native
binaries, VS Code extension, and Kernel contract bundles public.
7. Push the tag only after one explicit confirmation for that complete
publication and version.
8. Observe every release job. If a job fails transiently, inspect it and rerun
only the failed jobs; do not retag.
9. Verify the Release body is non-empty and matches the changelog section.
10. Verify exactly the four supported native `fslc`/`fslc-lsp` asset pairs and
checksums, the Agent Skill bundle and checksum, the VS Code extension, and
both Kernel bundles. Reject any
`macos-x64` asset. Download one supported binary, verify its checksum, and
require `fslc --version` to equal the tag; the workflow performs the same
tag/version assertion on every native runner.
11. If publication has begun and a defect is found, fix it upstream, promote it,
and cut a new patch version. Never rewrite the published release.
## Classify a failed gate before retrying
This is the sole classification rule for the release procedure. Apply it before
calling a job failure transient or rerunning it; `docs/RELEASE.md` retains the
command and publication contract.
1. Record the exact commit, the binary that ran, and the run ID/status before
interpreting a failure. A run still in progress is not evidence from the
completed run; do not mix their observations.
2. For a mutation lane, read the outcome classes before its exit code.
`outcomes.json` supplies the `CaughtMutant`, `MissedMutant`, `Timeout`, and
`Unviable` counts and per-phase durations; read `missed.txt` and
`timeout.txt` separately. A surviving mutant is a coverage defect, whereas
a timeout is a budget/performance observation.
3. Compare a local failure with the same commit's completed CI run for the same
lane, and record both observed values. Do not conclude that a local failure
is a code defect before making that comparison.
4. Classify the evidence and act on the matching branch:
- A missing release-procedure or release-bump-path requirement is a real
procedure defect. The v4.4.1 candidate exposed this when #906's
`rust/fslc/tests/goldens/induction_cli_contract.json` golden recorded the
version block; #914 added its regeneration step and the
`is_release_bump_path` entry in `tools/aggregate_changelog.sh`.
- A local timeout that does not reproduce in that CI lane is an environment
difference. The v4.4.1 local mutation run had 14 `Timeout`, 0
`MissedMutant`, 775 s mutant builds against the 600 s build timeout, and a
322 s baseline build; CI on the same commit had 55 tested, 47 caught, 8
unviable, and 0 timeouts. Record both sets of numbers. Never widen a
timeout or threshold to make a local gate pass: record the environment
difference instead.
- A `cancelled` job is not a failing job, but decide *why* it was cancelled
before rerunning: GitHub reports a job killed by its own
`timeout-minutes` as `cancelled`, not as a timeout. Compute the job's
elapsed time from its `startedAt` and `completedAt` and compare it with
that job's configured `timeout-minutes`.
- Elapsed well under the budget, and the aggregate's only non-success
input is the cancellation: transient. Rerun only failed jobs. On
`d9e9710`, one `native Z3 4.16 (windows-latest)` job was cancelled
while the other 15 jobs succeeded; `gh run rerun --failed` succeeded.
- Elapsed at the budget: this is a timeout wearing a cancellation label.
Rerunning without establishing why the job exceeded its budget repeats
it; `.github/workflows/ci.yml`'s `rust-native-z3` comment records six
consecutive scheduled `windows-latest` timeouts from 2026-08-07 through
2026-08-11, with cache absence as an observed material correlate. Establish the cause first, then rerun
at most once when the cause is known to have changed. On `ca2d5e7d`,
that job ran 06:45:55Z to 07:46:59Z — 61 minutes against
`.github/workflows/ci.yml`'s `timeout-minutes: 60` — with a cache key
(`v0-rust-rust-native-z3-Windows_NT-x64-368f6b88-...`) that had not
existed before the run, so it built cold. It saved that cache as it
exited, which is what made a single warm rerun worth attempting.
Never widen the budget to make the lane pass.
- A reproducing failure, a surviving non-equivalent mutant, or other failed
job is a defect until evidence establishes a different branch. Fix it
upstream and repeat the applicable release evidence; do not retag to
retry a different commit.
## Stabilize while main advances
Create `release/vX.Y` from a recorded `main` SHA only when candidate validation
must continue while unrelated work lands on `main`.
- Put every generally applicable fix in `main` first, then backport it to the
release branch with traceable pull requests.
- Accept only release preparation and candidate fixes on the release branch.
- Promote `release/vX.Y -> production`, tag the production merge, then delete
the temporary branch only after its release metadata is reconciled to `main`.
- After release, open a metadata reconciliation pull request to `main`. Carry
forward the released version and comparison links, remove only the entries
shipped by the release branch, and preserve newer `[Unreleased]` entries and
`changelog.d/` fragments from advancing `main`. Do not merge the older
release tree wholesale over `main`.
- Do not introduce permanent `pre-production`; the temporary branch represents
the stabilized candidate, not an environment.
## Handle an urgent hotfix
Prefer fixing `main` and running the normal promotion. If `main` contains work
that must not ship:
1. Branch `hotfix/vX.Y.Z` from `production`.
2. Make only the minimal patch and release metadata change.
3. Open coordinated pull requests to `production` and `main`; ensure the fix is
present on `main` before closing the hotfix task.
4. Run the release gate against the hotfix SHA, merge to `production`, and tag a
new patch version using the normal cut procedure.
Record why normal upstream-first promotion was unsafe. Do not use a hotfix to
ship ordinary feature work.
## Preserve component boundaries
This branch flow does not justify a new runtime component or a branch-aware code
path. Apply these design constraints when a change affects architecture:
- Keep branch names out of product configuration, binaries, schemas, and runtime
behavior. Git controls promotion; components implement one tested contract.
- Treat all artifacts built from one tag as one atomic release unit. For FSL this
includes `fslc`, `fslc-lsp`, the Agent Skills, the VS Code extension, and
published Kernel bundles.
Build jobs upload private workflow artifacts; one final job uploads the complete
unit to a draft, verifies the remote inventory, and only then makes it public.
- Verify cross-component contracts at the promotion SHA. A component cannot be
declared ready while another artifact from the same tag still depends on an
incompatible contract.
- Use versioned interfaces and an explicit compatibility policy only when
components are intentionally deployed or supported independently. Do not use
a branch per component as a substitute for interface versioning.
- Keep incomplete work outside `main` when it cannot preserve the release unit's
existing observable behavior. Prefer deletion or consolidation before adding
configuration or rollout machinery.
If a component needs a different release cadence, stop and propose a separate
release-unit contract before changing this flow.
## Report evidence
At completion, report:
- source and target branches with exact SHAs;
- integration and release gates actually observed;
- promotion pull request and release URLs;
- released tag and whether it equals `production` HEAD;
- non-empty release notes, supported asset inventory, checksum, and version
smoke-test evidence;
- temporary release/hotfix branches still requiring cleanup;
- any component-contract risk deferred from the release.