rem-investigate-project · git:20261003.7214130 · 2026-10-03 · sha256 d327f67e971e12ef
rem-investigate-project git:20261003.7214130A
Immutable. This exact content never changes and is served at /api/v1/blob/d327f67e971e12ef.
--- name: rem-investigate-project description: The steps for investigating a project's page, composed after rem-investigate when the subject is under projects/. --- # Investigating a project Why these rules: docs/rem-skills/rem-investigate.md - **Sessions show intent, not repository state.** Check files before claiming anything shipped or passed. - **Read the supplied repository snapshots, not the original checkout.** The page's `Paths` identify where co rem gathered evidence; they do not give this turn access to those directories. Start with the supplied source index, search for the claim in its snapshot files, and read matching entries with context. Cite each entry's source ID. The index names omitted files and size limits; an omitted body is not evidence that implementation is absent. - `project-inventory` lists candidate files, not their contents. Do not cite `investigation:project-inventory`; cite a retained snapshot for file facts. - Keep existing `Paths` without citing `investigation:page`. A new path needs a retained source. - Put search-window limits in your final reply, not page `Uncertainties` or `Sources`; `investigation:coverage` is not citable project evidence. - If the `project-input-scope` item says zero session inputs were assigned, keep `Insight` and `Open threads` as bare `Unknown`. Dated repository notes can explain the project and its history in `What it is` and `Where it stands`; they do not establish current user work or a live next action. The scope item is not an original and must not appear in `Sources`. - Old files are not recent activity. Attribute README/manifest claims to their snapshot date or revision unless current code or a dated user report confirms them. `First seen` is an observed session, not project `Started`; leave `Started` Unknown without explicit evidence. - `Status` and `Last activity` mean demonstrated project progress, not a Git branch or commit timestamp. Put a branch or commit in `Where it stands` as a dated checkout snapshot; leave those Facts Unknown unless a dated original ties actual work to this project. A commit alone does not establish the user's current task or next step. - A workspace holds unrelated requests. An old request with no outcome is not necessarily pending. Cwd does not identify the subject. Require a distinctive project, package, component, file, version or behavior match to the supplied project evidence. Generic release, patch, test, reply or package-manager requests do not identify a project. Omit ambiguous status, insight and action. - Assign unnamed follow-ups only when an earlier supplied input in the same session establishes this project's subject. If it names another product, or was not supplied, leave the follow-up unassigned despite its cwd. Exclude it from current findings, status, activity, issues, threads and next action. - Audit the final `Now`, `Where it stands` and `Open threads` claims against each cited original before writing the candidate. A short input reporting a missed reply establishes that report only; it does not establish whether a listener is event-driven, what caused the miss, or what was implemented. Remove any mechanism, cause, status or next action absent from the cited original unless a second, separately cited source establishes it. - A comment in source code reporting a test is a dated source note, not an independently verified execution result. Attribute it to the file and date; do not call it the latest run or a current outcome without a run log or another dated original that verifies that claim. - For `Overview` and `Try it`, compare each step with the original source and with the other section. Preserve the documented order exactly; do not reverse prerequisite, capture, load or write steps. If the order is not explicit, omit `Try it` rather than inventing instructions. ## What to produce `Facts` first (the repository remote, the stack from manifests, the first and last session dates), then `Insight`. Three shapes, never their facts: - `Now: stopped 2026-09-28 with the import half-merged; next the retry; blocked on review [3]` - `Changed: moved from SQLite to files on 2026-09-02 after the lock bug [5][7]` - `At stake: the 1 October demo needs the login, still failing [8]` Before writing `Insight`, ask what changes a teammate's next decision. A branch name, last commit date or list of README topics belongs in `Facts`, `Where it stands` or `What it is`; it is not an Insight. Lead with a sourced constraint, change or mismatch and its consequence. Put the decision-changing conclusion in a short first sentence that fits a phone preview, then add evidence and limits. If the packet supports none, write `- Unknown` instead of filling the section with housekeeping. Follow `rem-page-project`, skeleton headings exact. **`Overview` is required when the material shows the architecture** (its parts and how work moves between them): a closed `text` fence with arrows. Otherwise write `Unknown — <what evidence is missing>`. An example file does not prove an output. Current code is not a decision (local code ≠ a decision to stay local). Always keep the required `Open threads` heading. Write bare `Unknown` if no current exchange is supported; do not omit the heading or invent an obligation.