name: test-gate
- description: 'Run the full verification battery and block on red before any commit/PR. Use before /git-commit, before claiming a task done, or when the user says "run the tests", "is it green?", "verify before commit", or mentions "/test-gate". Discovers the commands from AGENTS.md §5 and docs/TESTING.md, brings up hermetic Docker infra if a compose file exists, runs lint → typecheck → unit → property → contract → integration (→ e2e) fail-fast, reads the real output, and refuses to proceed on any failure. Never reports passing without having watched it pass; never prints secrets from env or logs.'
+ description: 'Run the full verification battery and block on red before any commit/PR. Use before committing, before claiming a task done, or when the user says "run the tests", "is it green?", "verify before commit", or mentions "/test-gate". Discovers the commands from CLAUDE.md and docs/TESTING.md, brings up hermetic Docker infra if a compose file exists, runs lint → typecheck → unit → property → contract → integration (→ e2e) fail-fast, reads the real output, and refuses to proceed on any failure. Reports what it ran and what it printed; never prints secrets from env or logs.'
license: MIT
allowed-tools: Bash, Read
---
# Test Gate — verify before commit, block on red
## Overview
- Operationalize the constitution's **A2** (done = the postcondition *observed*, not the happy path hoped) and
- **A24** (commit only behind green): run the project's full Tier-B battery, **read the real output**, and
+ Run the project's full Tier-B battery, **read the real output**, and
**stop the moment anything is red** — never commit a red tree, never claim "passing" you did not watch pass.
The strategy this enforces is the project's `docs/TESTING.md`. **Invocation is the
authorization** — run end-to-end without a confirm prompt.
- This is the project's concrete runner; it complements the general `verification-before-completion` discipline
- (superpowers) with the repo's actual commands and infra. Closing ritual: **`test-gate` (green) →
- `/git-commit` → `/generate-pr`**.
+ This is the project's concrete runner, built from its own commands and infra. Closing ritual:
+ `test-gate` green, then commit, then `/generate-pr`.
## Arguments & modes
- `$1` = `full` (default) — the **Tier-B** PR-gated battery (what blocks a commit/merge).
- `$1` = `fast` — **Tier-A** local loop (unit + property + lint), skips Docker/integration for a tight
- feedback cycle. *`fast` green is not sufficient to commit — run `full` before `/git-commit`.*
+ feedback cycle. *`fast` green is not sufficient to commit — run `full` before committing.*
## Step 0 — Discover the commands (deterministic — never guess them)
Read the source of truth; do not invent commands:
```bash
- sed -n '/## 5. Commands/,/## 6\./p' AGENTS.md # the canonical command list
+ sed -n '/## Commands/,/^## /p' CLAUDE.md # the canonical command list
cat docs/TESTING.md # tiers, kinds, the Docker infra block, the gate order
ls docker-compose*.y*ml 2>/dev/null # is there hermetic infra to bring up?
```
Map what you find to the gate stages and set a shell var per stage from the **real** discovered command —
`$LINT`, `$TYPECHECK`, `$TEST` (the Tier-B suite), `$E2E`, and `$MIGRATE` / `$SEED` for infra. If a stage
has no command in this project, leave its var empty, skip it, and **say so** in the report (an honest "no
- e2e configured" — never a silent pass). **Never read or print `.env`/secrets** (A13): to check a needed
+ e2e configured" — never a silent pass). **Never read or print `.env` or secrets**: to check a needed
var, test presence only (`[ -n "$VAR" ] && echo set`).
## Step 1 — Bring up hermetic infra (only if a compose file exists)
```bash
COMPOSE=$(ls docker-compose.test.y*ml docker-compose.y*ml 2>/dev/null | head -1)
if [ -n "$COMPOSE" ]; then
docker compose -f "$COMPOSE" up -d --wait # wait for healthchecks; don't race startup
trap 'docker compose -f "$COMPOSE" down -v' EXIT # ALWAYS tear down + drop volumes, even on failure
[ -n "$MIGRATE" ] && eval "$MIGRATE"; [ -n "$SEED" ] && eval "$SEED" # deterministic schema + fixtures
fi
```
- Infra is **ephemeral, seeded, isolated** (A10) — never point integration tests at a shared/staging DB. If
+ Infra is **ephemeral, seeded, isolated** — never point integration tests at a shared or staging database. If
Docker is unavailable, run unit+property, and **report integration as not-run** (do not pretend it passed).
## Step 2 — Run the battery, fail-fast, reading every output
Order (a red stage **stops** the rest — fix the earliest failure first):
```
lint → typecheck → unit → property → contract/schema → integration → e2e (if wired)
```
Run each present stage with the discovered command; capture and **read** its output and exit code:
```bash
run () { [ -z "$2" ] && { echo "── $1: skipped (no command) ──"; return; }; echo "── $1 ──"; eval "$2"; rc=$?; echo "exit=$rc"; [ $rc -eq 0 ] || { echo "RED at: $1"; exit $rc; }; }
run lint "$LINT"
run typecheck "$TYPECHECK"
run tests "$TEST" # unit + property + contract + integration per TESTING.md Tier B
run e2e "$E2E" # only if configured
```
- - **Property tests** are the heart of A2's "total, not partial" — they generate empty/boundary/malformed/
- adversarial inputs. If the suite has none for a function with a stateable law, flag it as a gap.
+ - **Property tests** are what makes the suite total rather than partial — they generate empty, boundary,
+ malformed and adversarial inputs. If the suite has none for a function with a stateable law, flag it as a gap.
- **Generative paths** (if any): confirm the critic/fallback path is exercised (e.g. `FORCE_DEGRADE=1`) —
- ground→generate→verify→degrade, fallback actually run (A16/P3, I11).
+ ground, generate, verify, degrade — with the fallback actually run.
## Step 3 — Report the verdict (honest, evidence-based)
- **All green:** report each stage with its real result (`exit=0`), state Tier-B is green, and that it is
- safe to proceed to `/git-commit`. Only now may a `todo` item's `→ verify:` be marked passed.
- - **Any red:** report the **earliest** failing stage and the real output (the failing assertion / error), do
- **not** continue, and do **not** commit. Propose the fix or hand it to the `debugging` skill. A red gate is
- a hard stop (A2/C4 — "almost done" is `false`).
+ safe to commit. Only now may a `todo` item's `→ verify:` be marked passed.
+ - **Any red:** report the **earliest** failing stage with its real output — the failing assertion, the error —
+ and stop there. Do not continue the battery and do not commit. Fix the earliest failure first; a later stage
+ failing because an earlier one did is noise, not a second problem.
- **Skipped stages:** name them explicitly (`integration: skipped — no Docker`) — a skipped check is never a
passed check.
## Hard rules (stop if you catch yourself doing these)
- Claiming "tests pass" / "it's green" without having run the command and read `exit=0`. → run it; read it.
- - Committing, or telling the user to commit, on a red or partially-run gate. → block; A24/A2.
- - Reading, `cat`-ing, echoing, or pasting `.env` or any secret/log value. → presence-test only; A13.
+ - Committing, or telling the user to commit, on a red or partially-run gate. → block.
+ - Reading, `cat`-ing, echoing, or pasting `.env` or any secret or log value. → presence-test only.
- Pointing integration tests at a real/shared database instead of ephemeral Docker infra. → compose up/down.
- Leaving infra running after a failure. → the `trap … down -v` tears it down on every exit.
- Marking a `todo` item verified off a `fast` run. → only a green **`full`** Tier-B run justifies it.