--- name: test-estimation-calculator description: >- Estimate test effort with a work breakdown structure (WBS) and three-point PERT estimates, with explicit assumptions and buffer. Use when a QA lead says "estimate the testing effort", "how many days do we need to test this", "give me a PERT estimate", or pastes a scope or feature list. Produces a WBS table with O/M/P/E per task, totals, a confidence range and a commit number, as a draft that stops for human review. license: MIT metadata: author: TheTestingAcademy stlc-phase: Test Planning version: 1.0.0 --- # Test Estimation Calculator You give **an estimate with its assumptions showing**, never a single magic number. The range and the assumptions are what make the estimate defensible when scope moves. ## When to use - A sprint, release or SOW needs a testing effort figure. - A manager asks "how long will testing take?" and the answer must survive challenge. - Scope changed and the old estimate needs a traceable re-calculation. ## Workflow 1. **Confirm scope and inputs.** Ask for features in scope, case counts or complexity, environments, team size and productive hours per day. Never invent a case count. 2. **Build the WBS.** Break work into tasks: requirement review, planning, design, data and environment setup, execution cycles, defect retest, regression, reporting and closure. 3. **Get three points per task.** Optimistic (O), most likely (M) and pessimistic (P), in hours. Prefer the tester's own numbers or past actuals over your defaults. 4. **Compute PERT.** E = (O + 4M + P) / 6 and SD = (P - O) / 6 per task. Total E is the sum of E; total SD = sqrt(sum of SD squared), assuming tasks are independent. 5. **Add the buffer explicitly.** Report the range E +/- 2 SD (about 95%) and commit near the upper end. Add a separate risk buffer only for named risks, never a hidden padding. 6. **Convert to calendar time.** Divide by productive hours per day and headcount, then note dependencies (environment ready, build drops) that can shift dates. 7. **HUMAN REVIEW GATE (mandatory).** Present the estimate as a draft with every assumption numbered. Ask the lead to confirm inputs before the number is shared or committed. ## Output shape ```markdown # Test Estimate - Loyalty Points v2 (40 test cases, 1 tester) | WBS | Task | O | M | P | E = (O+4M+P)/6 | SD | |-----|-------------------------------|----|----|----|----------------|------| | 1.1 | Requirement review + plan | 4 | 6 | 14 | 7.0 | 1.67 | | 1.2 | Test case design (40 cases) | 12 | 16 | 26 | 17.0 | 2.33 | | 1.3 | Test data + environment setup | 4 | 8 | 18 | 9.0 | 2.33 | | 1.4 | Execution cycle 1 | 10 | 14 | 24 | 15.0 | 2.33 | | 1.5 | Defect retest + regression | 6 | 10 | 20 | 11.0 | 2.33 | | 1.6 | Reporting + closure | 2 | 4 | 6 | 4.0 | 0.67 | Total E = 63.0 h | Total SD = sqrt(25.0) = 5.0 h | Range (E +/- 2 SD): 53 to 73 h Commit: 73 h = about 12.2 working days at 6 productive h/day Risk buffer (named, not included): +8 h if shared staging is down more than 1 day (A3) Assumptions: A1 40 cases at medium complexity; A2 one execution cycle plus one retest cycle A3 staging shared with team B; A4 build delivered by <TBD date> --- HUMAN REVIEW GATE --- Confirm case count, productive hours and A3 before this goes to the plan. ``` ## Guardrails - Never fabricate historical actuals, velocity or case counts; ask or mark as assumed. - Show the formula and every input so anyone can recompute the total. - Keep buffer visible and tied to named risks; never pad individual tasks silently. - Re-estimate when scope changes instead of stretching the old number. - The estimate is a draft until the QA lead confirms the inputs and assumptions.