name: neqsim-lng-liquefaction
- description: "LNG liquefaction modelling in NeqSim. USE WHEN: building or sizing a liquefaction plant (SMR, DMR, C3MR, cascade, nitrogen expander), calibrating a mixed refrigerant, computing liquefaction specific energy or power, scaling to trains, choosing gas-turbine against electric drive and the resulting carbon intensity, or sizing LNG storage and cargo loading. Covers LNGProcessBuilder, LNGProcessModel, the mandatory specific-energy benchmark gate, and the LNG bubble-point trap."
+ description: "LNG liquefaction modelling in NeqSim. USE WHEN: building or sizing a liquefaction plant (SMR, DMR, C3MR, nitrogen expander), calibrating a mixed refrigerant, computing liquefaction specific energy or power, scaling to trains, choosing gas-turbine against electric drive and the resulting carbon intensity, or sizing LNG storage and cargo loading. Covers LNGProcessBuilder, LNGProcessModel, specific-energy validation and phase-state checks."
last_verified: "2026-10-03"
---
# LNG liquefaction with NeqSim
## When to use this
Any task that turns a treated gas stream into LNG and needs a defensible power, specific energy,
train count, storage volume or carbon intensity. Pair with `neqsim-process-modeling` for the
upstream treatment train and `neqsim-equipment-cost-estimation` for the cost side.
- ## The one thing that will bite you
-
- **A shipped mixed-refrigerant inventory is not a design.** Liquefaction specific energy is a
- strong function of refrigerant composition and circulation ratio — those *are* the cycle design.
- A builder with a fixed default inventory will return whatever that inventory gives, which can be
- two to three times outside the published band for the cycle, with no warning.
+ ## Validate the cycle design
- **Therefore: calibrating the refrigerant and passing the specific-energy benchmark is a mandatory
- gate, not a refinement.** Never scale an uncalibrated train to plant size.
+ Refrigerant composition, mass circulation and operating pressures define the
+ cycle design. A default inventory is a starting configuration, not evidence
+ that the required feed, product state, pinch, capacity or duty is feasible.
+ Validate those inputs and outputs against the intended design and independent
+ benchmarks before scaling a train. Broad energy bands are screening checks;
+ meeting one does not independently calibrate or qualify the model.
- Reference bands (specific energy on the feed-to-LNG basis):
+ Illustrative screening bands (specific energy on the feed-to-LNG basis):
| Cycle | kWh/kg LNG | Notes |
|---|---|---|
| Single mixed refrigerant (SMR) | 0.19 – 0.43 | Typical reference ~0.26 |
| Dual mixed refrigerant (DMR) | 0.25 – 0.35 | |
| Propane-precooled MR (C3MR) | 0.27 – 0.35 | Baseload workhorse |
| Cascade | 0.30 – 0.38 | |
| Nitrogen expander | 0.45 – 0.70 | Small scale / FLNG, simplicity over efficiency |
Source: Pereira et al., *Energy Conversion and Management* 272 (2022) 116364, and the open
liquefaction literature. Always cite the band you validate against.
- ## Core API
-
- ```java
- LNGProcessBuilder builder = new LNGProcessBuilder("SMR train");
- builder.setFeedStream(treatedGas);
- builder.setLngTemperature(-160.0); // degC
- builder.setLngPressure(1.08); // bara
-
- // Refrigerant is configurable — set it, do not accept the default
- builder.setRefrigerantComposition(
- new String[] {"nitrogen", "methane", "ethane", "propane", "i-butane"},
- new double[] {0.08, 0.34, 0.34, 0.12, 0.12});
- builder.setRefrigerantCirculationRatio(2.5); // kmol refrigerant per kmol feed
- builder.setRefrigerantSuctionPressure(4.0); // bara
- builder.setRefrigerantDischargePressure(45.0); // bara
- builder.setRefrigerantCoolingTemperature(30.0);// degC after the aftercooler
+ ## Verified builder contract (Java and Python)
- ProcessSystem train = builder.buildSMR();
- train.run();
- ```
+ Inspect `src/main/java/neqsim/process/lng/LNGProcessBuilder.java` and the executable
+ `LNGProcessBuilderTest` / `LNGProcessBuilderRefrigerantTest` under
+ `src/test/java/neqsim/process/lng/` before building the model.
- Other cycles: `buildDMR()`, `buildC3MR()`, `buildCascade()`, `buildNitrogenExpander()`.
+ - Construct `LNGProcessBuilder` with no arguments, then set its name and select
+ an `LNGProcessCycle`: SMR, DMR, C3MR or NITROGEN_EXPANDER. The current enum
+ does not expose a cascade cycle.
+ - Supply the treated feed with `setFeedStream(StreamInterface)` or the documented
+ fluid/flow/T/P setters. Set the cold-end target with
+ `setTargetLiquefactionTemperature(double)` in °C, and the product pressure with
+ `setProductPressure(double)` in bara.
+ - Set refrigerant composition (mole fractions), suction/discharge pressures in
+ bara and cooling temperature in °C. `setRefrigerantCirculationRatio(double)`
+ is **refrigerant mass flow/feed mass flow**, not a molar circulation ratio.
+ - Call public `build()` to obtain an `LNGProcessModel`. Individual cycle builders
+ such as `buildSMR()` are private implementation methods. There is no string
+ constructor, `setLngTemperature` or `setLngPressure` API.
+ - `LNGProcessModel.run()` returns a `Result`; read
+ `getSpecificEnergyKWhPerKgLNG()`, `getNetPowerKW()` and
+ `getLNGMassFlowKgPerHour()` from that result. Inspect yield, exchanger approach,
+ convergence and the energy boundary before accepting the values.
+ - For area composition, retain the live feed and the model's `getProcessSystem()`.
+ `setUpstreamProcess(...)` extends its supplied process in place; do not also
+ register the same upstream equipment in a second area and run it twice.
- ## The calibration workflow (do this every time)
+ In Python, resolve these same Java classes/enums through the selected NeqSim
+ bridge (workspace notebooks use `neqsim_init` and `ns.JClass`). Do not assume
+ convenience wrappers or recreate the refrigeration equations in Python. Reuse
+ one case specification and engine build when comparing Java/Python results.
- ```python
- def specific_energy(comp, fractions, ratio, suction, discharge):
- b = LNGProcessBuilder("cal")
- b.setFeedStream(feed)
- b.setRefrigerantComposition(comp, fractions)
- b.setRefrigerantCirculationRatio(ratio)
- b.setRefrigerantSuctionPressure(suction)
- b.setRefrigerantDischargePressure(discharge)
- p = b.buildSMR()
- p.run()
- power_kW = sum(u.getPower("kW") for u in compressors_in(p))
- lng_kg_per_h = lng_stream.getFlowRate("kg/hr")
- return power_kW / lng_kg_per_h
+ ## Validate the refrigerant design
- # 1. Sweep circulation ratio and discharge pressure
- # 2. Accept the first combination inside the published band
- # 3. ASSERT it is inside the band before going further
- assert 0.19 <= se <= 0.43, "SMR train outside the published specific-energy band"
- ```
+ Specify the actual cycle/refrigerant design or fit independently justified design
+ inputs, then assess the resulting model. Sweep circulation and pressures within
+ physical and equipment bounds; inspect duty, pinch/approach, phase states, yield
+ and constraints. An energy number falling inside a broad literature band is a
+ screening check, not a calibration dataset or proof of a valid design. Do not
+ accept the first in-band candidate while ignoring infeasibility or independent
+ benchmarks. Retain the objective, bounds, failed cases and benchmark evidence.
- Circulation ratio is the strongest single lever; discharge pressure is the second. Suction
- pressure mainly sets the cold-end approach.
+ For the current source-backed synthetic SMR example and its acceptance checks,
+ use `LNGProcessBuilderRefrigerantTest.calibratedRefrigerantLandsInsideThePublishedBand`
+ and `circulationRatioChangesCompressorPower`. This verifies those cases only.
## Scaling to a plant
Scale on **specific energy**, not by multiplying a single train's absolute power, so the train
count and the plant rate stay consistent:
```python
train_mtpa = lng_kg_per_h * 8766 * availability / 1e9
n_trains = ceil(plant_mtpa / train_mtpa)
plant_power = specific_energy * plant_mtpa * 1e9 / (8766 * availability) # kW
```
Then add, as separate items:
- **End-flash and BOG compression**: typically 5–8 % of refrigeration power.
- **Utilities** (cooling pumps, air, N2, instrument): typically 8–10 %.
A common sanity number: total FLNG/plant power lands near **0.35–0.40 kWh/kg** once end-flash and
utilities are included, against 0.26–0.32 for the refrigeration cycle alone.
- ## The LNG bubble-point trap
-
- Flashing an LNG composition at its storage temperature and pressure with `TPflash` frequently
- returns **vapour**, giving a density near 2 kg/m³ instead of 430–460 kg/m³ — and the error then
- propagates silently into cargo size, storage volume and cargo count.
-
- ```python
- # WRONG — may land on the vapour side
- fluid.setTemperature(-160.0, "C"); fluid.setPressure(1.08, "bara")
- ops.TPflash(); rho = fluid.getDensity("kg/m3") # 1.9 kg/m3 !
+ ## LNG phase state and inventory density
- # RIGHT — put the fluid on the saturation line first
- fluid.setPressure(1.08, "bara")
- ops.bubblePointTemperatureFlash()
- fluid.initProperties()
- rho = fluid.getPhase("oil").getDensity("kg/m3") # ~440 kg/m3
- ```
+ Calculate equilibrium at the specified tank composition, temperature and pressure
+ and inspect the actual phase state. A vapor result is not automatically a flash
+ bug: the specified state may be outside the liquid region. Do not replace the
+ requested operating temperature with a bubble-point temperature simply to obtain
+ a plausible liquid density.
- Always cross-check LNG density against a reference equation (CoolProp methane saturated liquid is
- close enough for a screening study; expect SRK to sit within ~4 %).
+ For a deliberately saturated-liquid inventory basis, solve the bubble temperature
+ at the specified pressure, report that solved temperature and assumption, check
+ which liquid phase is present, and initialize properties before retrieving its
+ density. Keep vapor/boil-off mass and the selected density basis explicit. Use
+ mixture-relevant reference data; pure-methane saturation density is only a
+ screening comparison for an LNG mixture.
## Driver selection and carbon intensity
This is usually the largest ESG lever in an LNG study and is cheap to compute:
```python
# Gas-turbine drive
fuel_kg_per_h = power_kW / (gt_efficiency * LHV_kWh_per_kg)
co2_kg_per_h = fuel_kg_per_h * 2.72 # kg CO2 per kg of natural gas
intensity = co2_kg_per_h / lng_kg_per_h * 1000.0 # kg CO2 per tonne LNG
# Electric drive
co2_kg_per_h = power_kW * grid_intensity_kg_per_kWh
```
Typical outcomes: gas-turbine drive ~180–220 kg CO2 per tonne of LNG; electric drive from a
low-carbon grid ~5–15 kg CO2/t. Electric drive also **releases the fuel gas back into production**
— quantify that, because it extends plateau life and is often worth more than the emission saving.
## Storage and marine sizing
```python
cargo_m3 = carrier_size_m3 * 0.985 # allow for heel and trim
cargo_t = cargo_m3 * lng_density / 1000.0
cargoes_per_y = plant_mtpa * 1e6 / cargo_t
days_between = 365.25 / cargoes_per_y
berth_occupancy = cargoes_per_y * turnaround_hours / (365.25 * 24)
loading_rate = cargo_m3 / loading_hours # m3/h -> number of arms
```
Rules of thumb: one berth serves up to ~50 % occupancy comfortably; storage of 1.5–2 cargo
volumes (roughly 5 days of production) is the usual minimum; 16-inch arms carry ~3000–4000 m³/h
each.
## Validation gate for any LNG deliverable
1. Specific energy inside the published band for the chosen cycle — **assert it**.
2. LNG density cross-checked against a reference equation.
3. Feed-to-LNG mass balance closes (account for NGL extraction, fuel and end-flash).
4. Feed rate cross-checked against a published plant of similar capacity
(~160–170 MMscfd per MTPA for a lean feed; higher for a rich feed with NGL extraction).
## Related skills
- `neqsim-process-modeling` — building the treatment train that feeds the liquefier
- `neqsim-water-dewpoint-dehydration-screening` — molecular-sieve specification upstream
- `neqsim-equipment-cost-estimation` — costing the trains (watch the correlation validity range)
- `neqsim-ccs-hydrogen` — if the CO2 removed upstream is captured rather than vented
- `neqsim-benchmark-reference-data` — the reference-data comparison layer for the validation gate
## LNG storage, ageing, rollover and shipping
Use these classes for LNG storage and voyage ageing; they complement, not replace, the liquefaction-train design above.
| Class | Package | Role and verified entry points |
|---|---|---|
| `LNGTankLayeredModel`, `LNGTankLayer` | `neqsim.process.equipment.lng` | Stratified tank state; `initialise(double)`, `step(double,double)`, `getLayers()` |
| `LNGAgeingScenario`, `LNGAgeingResult` | `neqsim.process.equipment.lng` | Process-equipment wrapper and time-series result; setters below, `getResults()`, `getBogMassFlowRate()`, `getLiquidComposition()` |
| `LNGVaporSpaceModel` | `neqsim.process.equipment.lng` | Headspace pressure and BOG bookkeeping; constructor `(double)`, `update(double,double,double,Map,double)` |
| `LNGRolloverDetector` | `neqsim.process.equipment.lng` | Stratification/inversion assessment; `assess(List<LNGTankLayer>)` |
| `TankHeatTransferModel`, `TankGeometry` | `neqsim.process.equipment.lng` | Zone-based heat ingress and tank geometry; `TankHeatTransferModel(TankGeometry,double)`, `TankGeometry(ContainmentType,double)` |
| `LNGBOGHandlingNetwork`, `LNGHeelManager` | `neqsim.process.equipment.lng` | BOG disposition and idealized cargo/heel mixing; `calculateDisposition(double)`, `calculateMixedComposition(Map<String,Double>,double,double)` |
| `LNGVoyageProfile`, `LNGSloshingModel` | `neqsim.process.equipment.lng` | Voyage conditions and sloshing model; `LNGVoyageProfile(String)`, `addSegment(Segment)` |
| `LNGShipModel` | `neqsim.process.equipment.lng` | Multiple tank scenarios and aggregate reporting; `addTank(LNGAgeingScenario)`, `run()`, `getTankResults()`, `getShipResults()` |
| `MethaneNumberCalculator` | `neqsim.process.equipment.lng` | Methane-number calculation from gas composition; `calculate(Map<String,Double>)` |
| `LNGTank`, `Tank`, `MountainCavern`, `VesselDepressurization` | `neqsim.process.equipment.tank` | Storage equipment, cavern and vessel depressurization models; use the equipment-specific API and tests before combining with ageing scenarios |
Minimal Java 8 ageing pattern, following the source example:
```java
SystemInterface lng = new SystemSrkEos(111.0, 1.013);
lng.addComponent("methane", 0.92);
lng.addComponent("ethane", 0.05);
lng.addComponent("propane", 0.02);
lng.addComponent("nitrogen", 0.01);
lng.setMixingRule("classic");
Stream feed = new Stream("LNG feed", lng);
feed.setFlowRate(140000.0, "m3/hr");
feed.run();
LNGAgeingScenario scenario = new LNGAgeingScenario("Laden Voyage", feed);
scenario.setTankVolume(140000.0);
scenario.setInitialFillingRatio(0.98);
scenario.setSimulationTime(480.0);
scenario.setTimeStepHours(1.0);
scenario.setOverallHeatTransferCoeff(0.045);
scenario.setAmbientTemperature(308.15);
scenario.run();
List<LNGAgeingResult> results = scenario.getResults();
LNGAgeingResult finalState = results.get(results.size() - 1);
double finalBogRateKgHr = finalState.getBogMassFlowRate();
double finalTankPressureBara = finalState.getPressure();
```
### Storage-model gotchas
- Temperatures passed to `setAmbientTemperature` are K; tank pressure is bara; volume is m3; overall U is W/(m2 K); time and step are hours. Do not reuse the liquefaction builder's Celsius setter assumptions here.
- `LNGAgeingScenario` initializes layered storage from a single feed stream and configured fill ratio. Confirm feed composition, pressure, phase state, tank geometry and heat-transfer basis before treating results as cargo predictions.
- `LNGRolloverDetector` identifies a stratification risk from supplied layer states; it is not a validated rollover-event CFD or safety model.
- `LNGShipModel` runs each tank scenario independently, then aggregates each time-step's results. It does not solve a fully coupled shared BOG header, ship motion, loading dynamics or cargo interaction.
- `LNGHeelManager.calculateMixedComposition(...)` documents instantaneous ideal mixing. It does not model incomplete mixing or a transient interface.
- BOG disposition, methane number, sloshing, heat-transfer zones and geometry are separate model components. Do not infer full fidelity merely because the orchestrator exposes their classes.
- Results include composition/quality values and BOG rate; verify getter units in `LNGAgeingResult` before reporting. In particular `getBogMassFlowRate()` is kg/hr and `getTimeHours()` is hours.
- The ageing model's source and unit tests are regression evidence, not independent LNG cargo validation. Benchmark density, BOG, heat ingress and quality change against an approved reference case before design use.