name: neqsim-lng-liquefaction
description: LNG liquefaction modelling in NeqSim. USE WHEN: building or sizing a liquefaction plant (SMR, DMR, C3MR, cascade, nitrogen expander), calibrating a mixed refrigerant, computing liquefaction specific energy or power, scaling to trains, choosing gas-turbine against electric drive and the resulting carbon intensity, or sizing LNG storage and cargo loading. Covers LNGProcessBuilder, LNGProcessModel, the mandatory specific-energy benchmark gate, and the LNG bubble-point trap.
- last_verified: "2026-09-24"
+ last_verified: "2026-10-03"
---
# LNG liquefaction with NeqSim
## When to use this
Any task that turns a treated gas stream into LNG and needs a defensible power, specific energy,
train count, storage volume or carbon intensity. Pair with `neqsim-process-modeling` for the
upstream treatment train and `neqsim-equipment-cost-estimation` for the cost side.
## The one thing that will bite you
**A shipped mixed-refrigerant inventory is not a design.** Liquefaction specific energy is a
strong function of refrigerant composition and circulation ratio — those *are* the cycle design.
A builder with a fixed default inventory will return whatever that inventory gives, which can be
two to three times outside the published band for the cycle, with no warning.
**Therefore: calibrating the refrigerant and passing the specific-energy benchmark is a mandatory
gate, not a refinement.** Never scale an uncalibrated train to plant size.
Reference bands (specific energy on the feed-to-LNG basis):
| Cycle | kWh/kg LNG | Notes |
|---|---|---|
| Single mixed refrigerant (SMR) | 0.19 – 0.43 | Typical reference ~0.26 |
| Dual mixed refrigerant (DMR) | 0.25 – 0.35 | |
| Propane-precooled MR (C3MR) | 0.27 – 0.35 | Baseload workhorse |
| Cascade | 0.30 – 0.38 | |
| Nitrogen expander | 0.45 – 0.70 | Small scale / FLNG, simplicity over efficiency |
Source: Pereira et al., *Energy Conversion and Management* 272 (2022) 116364, and the open
liquefaction literature. Always cite the band you validate against.
## Core API
```java
LNGProcessBuilder builder = new LNGProcessBuilder("SMR train");
builder.setFeedStream(treatedGas);
builder.setLngTemperature(-160.0); // degC
builder.setLngPressure(1.08); // bara
// Refrigerant is configurable — set it, do not accept the default
builder.setRefrigerantComposition(
new String[] {"nitrogen", "methane", "ethane", "propane", "i-butane"},
new double[] {0.08, 0.34, 0.34, 0.12, 0.12});
builder.setRefrigerantCirculationRatio(2.5); // kmol refrigerant per kmol feed
builder.setRefrigerantSuctionPressure(4.0); // bara
builder.setRefrigerantDischargePressure(45.0); // bara
builder.setRefrigerantCoolingTemperature(30.0);// degC after the aftercooler
ProcessSystem train = builder.buildSMR();
train.run();
```
Other cycles: `buildDMR()`, `buildC3MR()`, `buildCascade()`, `buildNitrogenExpander()`.
## The calibration workflow (do this every time)
```python
def specific_energy(comp, fractions, ratio, suction, discharge):
b = LNGProcessBuilder("cal")
b.setFeedStream(feed)
b.setRefrigerantComposition(comp, fractions)
b.setRefrigerantCirculationRatio(ratio)
b.setRefrigerantSuctionPressure(suction)
b.setRefrigerantDischargePressure(discharge)
p = b.buildSMR()
p.run()
power_kW = sum(u.getPower("kW") for u in compressors_in(p))
lng_kg_per_h = lng_stream.getFlowRate("kg/hr")
return power_kW / lng_kg_per_h
# 1. Sweep circulation ratio and discharge pressure
# 2. Accept the first combination inside the published band
# 3. ASSERT it is inside the band before going further
assert 0.19 <= se <= 0.43, "SMR train outside the published specific-energy band"
```
Circulation ratio is the strongest single lever; discharge pressure is the second. Suction
pressure mainly sets the cold-end approach.
## Scaling to a plant
Scale on **specific energy**, not by multiplying a single train's absolute power, so the train
count and the plant rate stay consistent:
```python
train_mtpa = lng_kg_per_h * 8766 * availability / 1e9
n_trains = ceil(plant_mtpa / train_mtpa)
plant_power = specific_energy * plant_mtpa * 1e9 / (8766 * availability) # kW
```
Then add, as separate items:
- **End-flash and BOG compression**: typically 5–8 % of refrigeration power.
- **Utilities** (cooling pumps, air, N2, instrument): typically 8–10 %.
A common sanity number: total FLNG/plant power lands near **0.35–0.40 kWh/kg** once end-flash and
utilities are included, against 0.26–0.32 for the refrigeration cycle alone.
## The LNG bubble-point trap
Flashing an LNG composition at its storage temperature and pressure with `TPflash` frequently
returns **vapour**, giving a density near 2 kg/m³ instead of 430–460 kg/m³ — and the error then
propagates silently into cargo size, storage volume and cargo count.
```python
# WRONG — may land on the vapour side
fluid.setTemperature(-160.0, "C"); fluid.setPressure(1.08, "bara")
ops.TPflash(); rho = fluid.getDensity("kg/m3") # 1.9 kg/m3 !
# RIGHT — put the fluid on the saturation line first
fluid.setPressure(1.08, "bara")
ops.bubblePointTemperatureFlash()
fluid.initProperties()
rho = fluid.getPhase("oil").getDensity("kg/m3") # ~440 kg/m3
```
Always cross-check LNG density against a reference equation (CoolProp methane saturated liquid is
close enough for a screening study; expect SRK to sit within ~4 %).
## Driver selection and carbon intensity
This is usually the largest ESG lever in an LNG study and is cheap to compute:
```python
# Gas-turbine drive
fuel_kg_per_h = power_kW / (gt_efficiency * LHV_kWh_per_kg)
co2_kg_per_h = fuel_kg_per_h * 2.72 # kg CO2 per kg of natural gas
intensity = co2_kg_per_h / lng_kg_per_h * 1000.0 # kg CO2 per tonne LNG
# Electric drive
co2_kg_per_h = power_kW * grid_intensity_kg_per_kWh
```
Typical outcomes: gas-turbine drive ~180–220 kg CO2 per tonne of LNG; electric drive from a
low-carbon grid ~5–15 kg CO2/t. Electric drive also **releases the fuel gas back into production**
— quantify that, because it extends plateau life and is often worth more than the emission saving.
## Storage and marine sizing
```python
cargo_m3 = carrier_size_m3 * 0.985 # allow for heel and trim
cargo_t = cargo_m3 * lng_density / 1000.0
cargoes_per_y = plant_mtpa * 1e6 / cargo_t
days_between = 365.25 / cargoes_per_y
berth_occupancy = cargoes_per_y * turnaround_hours / (365.25 * 24)
loading_rate = cargo_m3 / loading_hours # m3/h -> number of arms
```
Rules of thumb: one berth serves up to ~50 % occupancy comfortably; storage of 1.5–2 cargo
volumes (roughly 5 days of production) is the usual minimum; 16-inch arms carry ~3000–4000 m³/h
each.
## Validation gate for any LNG deliverable
1. Specific energy inside the published band for the chosen cycle — **assert it**.
2. LNG density cross-checked against a reference equation.
3. Feed-to-LNG mass balance closes (account for NGL extraction, fuel and end-flash).
4. Feed rate cross-checked against a published plant of similar capacity
(~160–170 MMscfd per MTPA for a lean feed; higher for a rich feed with NGL extraction).
## Related skills
- `neqsim-process-modeling` — building the treatment train that feeds the liquefier
- `neqsim-water-dewpoint-dehydration-screening` — molecular-sieve specification upstream
- `neqsim-equipment-cost-estimation` — costing the trains (watch the correlation validity range)
- `neqsim-ccs-hydrogen` — if the CO2 removed upstream is captured rather than vented
- `neqsim-benchmark-reference-data` — the reference-data comparison layer for the validation gate
+
+ ## LNG storage, ageing, rollover and shipping
+
+ Use these classes for LNG storage and voyage ageing; they complement, not replace, the liquefaction-train design above.
+
+ | Class | Package | Role and verified entry points |
+ |---|---|---|
+ | `LNGTankLayeredModel`, `LNGTankLayer` | `neqsim.process.equipment.lng` | Stratified tank state; `initialise(double)`, `step(double,double)`, `getLayers()` |
+ | `LNGAgeingScenario`, `LNGAgeingResult` | `neqsim.process.equipment.lng` | Process-equipment wrapper and time-series result; setters below, `getResults()`, `getBogMassFlowRate()`, `getLiquidComposition()` |
+ | `LNGVaporSpaceModel` | `neqsim.process.equipment.lng` | Headspace pressure and BOG bookkeeping; constructor `(double)`, `update(double,double,double,Map,double)` |
+ | `LNGRolloverDetector` | `neqsim.process.equipment.lng` | Stratification/inversion assessment; `assess(List<LNGTankLayer>)` |
+ | `TankHeatTransferModel`, `TankGeometry` | `neqsim.process.equipment.lng` | Zone-based heat ingress and tank geometry; `TankHeatTransferModel(TankGeometry,double)`, `TankGeometry(ContainmentType,double)` |
+ | `LNGBOGHandlingNetwork`, `LNGHeelManager` | `neqsim.process.equipment.lng` | BOG disposition and idealized cargo/heel mixing; `calculateDisposition(double)`, `calculateMixedComposition(Map<String,Double>,double,double)` |
+ | `LNGVoyageProfile`, `LNGSloshingModel` | `neqsim.process.equipment.lng` | Voyage conditions and sloshing model; `LNGVoyageProfile(String)`, `addSegment(Segment)` |
+ | `LNGShipModel` | `neqsim.process.equipment.lng` | Multiple tank scenarios and aggregate reporting; `addTank(LNGAgeingScenario)`, `run()`, `getTankResults()`, `getShipResults()` |
+ | `MethaneNumberCalculator` | `neqsim.process.equipment.lng` | Methane-number calculation from gas composition; `calculate(Map<String,Double>)` |
+ | `LNGTank`, `Tank`, `MountainCavern`, `VesselDepressurization` | `neqsim.process.equipment.tank` | Storage equipment, cavern and vessel depressurization models; use the equipment-specific API and tests before combining with ageing scenarios |
+
+ Minimal Java 8 ageing pattern, following the source example:
+
+ ```java
+ SystemInterface lng = new SystemSrkEos(111.0, 1.013);
+ lng.addComponent("methane", 0.92);
+ lng.addComponent("ethane", 0.05);
+ lng.addComponent("propane", 0.02);
+ lng.addComponent("nitrogen", 0.01);
+ lng.setMixingRule("classic");
+ Stream feed = new Stream("LNG feed", lng);
+ feed.setFlowRate(140000.0, "m3/hr");
+ feed.run();
+ LNGAgeingScenario scenario = new LNGAgeingScenario("Laden Voyage", feed);
+ scenario.setTankVolume(140000.0);
+ scenario.setInitialFillingRatio(0.98);
+ scenario.setSimulationTime(480.0);
+ scenario.setTimeStepHours(1.0);
+ scenario.setOverallHeatTransferCoeff(0.045);
+ scenario.setAmbientTemperature(308.15);
+ scenario.run();
+ List<LNGAgeingResult> results = scenario.getResults();
+ LNGAgeingResult finalState = results.get(results.size() - 1);
+ double finalBogRateKgHr = finalState.getBogMassFlowRate();
+ double finalTankPressureBara = finalState.getPressure();
+ ```
+
+ ### Storage-model gotchas
+
+ - Temperatures passed to `setAmbientTemperature` are K; tank pressure is bara; volume is m3; overall U is W/(m2 K); time and step are hours. Do not reuse the liquefaction builder's Celsius setter assumptions here.
+ - `LNGAgeingScenario` initializes layered storage from a single feed stream and configured fill ratio. Confirm feed composition, pressure, phase state, tank geometry and heat-transfer basis before treating results as cargo predictions.
+ - `LNGRolloverDetector` identifies a stratification risk from supplied layer states; it is not a validated rollover-event CFD or safety model.
+ - `LNGShipModel` runs each tank scenario independently, then aggregates each time-step's results. It does not solve a fully coupled shared BOG header, ship motion, loading dynamics or cargo interaction.
+ - `LNGHeelManager.calculateMixedComposition(...)` documents instantaneous ideal mixing. It does not model incomplete mixing or a transient interface.
+ - BOG disposition, methane number, sloshing, heat-transfer zones and geometry are separate model components. Do not infer full fidelity merely because the orchestrator exposes their classes.
+ - Results include composition/quality values and BOG rate; verify getter units in `LNGAgeingResult` before reporting. In particular `getBogMassFlowRate()` is kg/hr and `getTimeHours()` is hours.
+ - The ageing model's source and unit tests are regression evidence, not independent LNG cargo validation. Benchmark density, BOG, heat ingress and quality change against an approved reference case before design use.