description: LNG liquefaction modelling in NeqSim. USE WHEN: building or sizing a liquefaction plant (SMR, DMR, C3MR, cascade, nitrogen expander), calibrating a mixed refrigerant, computing liquefaction specific energy or power, scaling to trains, choosing gas-turbine against electric drive and the resulting carbon intensity, or sizing LNG storage and cargo loading. Covers LNGProcessBuilder, LNGProcessModel, the mandatory specific-energy benchmark gate, and the LNG bubble-point trap.
---
# LNG liquefaction with NeqSim
## When to use this
Any task that turns a treated gas stream into LNG and needs a defensible power, specific energy,
train count, storage volume or carbon intensity. Pair with `neqsim-process-modeling` for the
upstream treatment train and `neqsim-equipment-cost-estimation` for the cost side.
## The one thing that will bite you
**A shipped mixed-refrigerant inventory is not a design.** Liquefaction specific energy is a
strong function of refrigerant composition and circulation ratio — those *are* the cycle design.
A builder with a fixed default inventory will return whatever that inventory gives, which can be
two to three times outside the published band for the cycle, with no warning.
**Therefore: calibrating the refrigerant and passing the specific-energy benchmark is a mandatory
gate, not a refinement.** Never scale an uncalibrated train to plant size.
Reference bands (specific energy on the feed-to-LNG basis):
| Cycle | kWh/kg LNG | Notes |
|---|---|---|
| Single mixed refrigerant (SMR) | 0.19 – 0.43 | Typical reference ~0.26 |
| Dual mixed refrigerant (DMR) | 0.25 – 0.35 | |
| Propane-precooled MR (C3MR) | 0.27 – 0.35 | Baseload workhorse |
| Cascade | 0.30 – 0.38 | |
| Nitrogen expander | 0.45 – 0.70 | Small scale / FLNG, simplicity over efficiency |
Source: Pereira et al., *Energy Conversion and Management* 272 (2022) 116364, and the open
liquefaction literature. Always cite the band you validate against.
## Core API
```java
LNGProcessBuilder builder = new LNGProcessBuilder("SMR train");
builder.setFeedStream(treatedGas);
builder.setLngTemperature(-160.0); // degC
builder.setLngPressure(1.08); // bara
// Refrigerant is configurable — set it, do not accept the default
builder.setRefrigerantComposition(
new String[] {"nitrogen", "methane", "ethane", "propane", "i-butane"},
new double[] {0.08, 0.34, 0.34, 0.12, 0.12});
builder.setRefrigerantCirculationRatio(2.5); // kmol refrigerant per kmol feed
builder.setRefrigerantSuctionPressure(4.0); // bara
builder.setRefrigerantDischargePressure(45.0); // bara
builder.setRefrigerantCoolingTemperature(30.0);// degC after the aftercooler
ProcessSystem train = builder.buildSMR();
train.run();
```
Other cycles: `buildDMR()`, `buildC3MR()`, `buildCascade()`, `buildNitrogenExpander()`.
## The calibration workflow (do this every time)
```python
def specific_energy(comp, fractions, ratio, suction, discharge):
b = LNGProcessBuilder("cal")
b.setFeedStream(feed)
b.setRefrigerantComposition(comp, fractions)
b.setRefrigerantCirculationRatio(ratio)
b.setRefrigerantSuctionPressure(suction)
b.setRefrigerantDischargePressure(discharge)
p = b.buildSMR()
p.run()
power_kW = sum(u.getPower("kW") for u in compressors_in(p))
lng_kg_per_h = lng_stream.getFlowRate("kg/hr")
return power_kW / lng_kg_per_h
# 1. Sweep circulation ratio and discharge pressure
# 2. Accept the first combination inside the published band
# 3. ASSERT it is inside the band before going further
assert 0.19 <= se <= 0.43, "SMR train outside the published specific-energy band"
```
Circulation ratio is the strongest single lever; discharge pressure is the second. Suction
pressure mainly sets the cold-end approach.
## Scaling to a plant
Scale on **specific energy**, not by multiplying a single train's absolute power, so the train
count and the plant rate stay consistent:
```python
train_mtpa = lng_kg_per_h * 8766 * availability / 1e9
n_trains = ceil(plant_mtpa / train_mtpa)
plant_power = specific_energy * plant_mtpa * 1e9 / (8766 * availability) # kW
```
Then add, as separate items:
- **End-flash and BOG compression**: typically 5–8 % of refrigeration power.
- **Utilities** (cooling pumps, air, N2, instrument): typically 8–10 %.
A common sanity number: total FLNG/plant power lands near **0.35–0.40 kWh/kg** once end-flash and
utilities are included, against 0.26–0.32 for the refrigeration cycle alone.
## The LNG bubble-point trap
Flashing an LNG composition at its storage temperature and pressure with `TPflash` frequently
returns **vapour**, giving a density near 2 kg/m³ instead of 430–460 kg/m³ — and the error then
propagates silently into cargo size, storage volume and cargo count.
```python
# WRONG — may land on the vapour side
fluid.setTemperature(-160.0, "C"); fluid.setPressure(1.08, "bara")
ops.TPflash(); rho = fluid.getDensity("kg/m3") # 1.9 kg/m3 !
# RIGHT — put the fluid on the saturation line first
fluid.setPressure(1.08, "bara")
ops.bubblePointTemperatureFlash()
fluid.initProperties()
rho = fluid.getPhase("oil").getDensity("kg/m3") # ~440 kg/m3
```
Always cross-check LNG density against a reference equation (CoolProp methane saturated liquid is
close enough for a screening study; expect SRK to sit within ~4 %).
## Driver selection and carbon intensity
This is usually the largest ESG lever in an LNG study and is cheap to compute:
```python
# Gas-turbine drive
fuel_kg_per_h = power_kW / (gt_efficiency * LHV_kWh_per_kg)
co2_kg_per_h = fuel_kg_per_h * 2.72 # kg CO2 per kg of natural gas
intensity = co2_kg_per_h / lng_kg_per_h * 1000.0 # kg CO2 per tonne LNG
# Electric drive
co2_kg_per_h = power_kW * grid_intensity_kg_per_kWh
```
Typical outcomes: gas-turbine drive ~180–220 kg CO2 per tonne of LNG; electric drive from a
low-carbon grid ~5–15 kg CO2/t. Electric drive also **releases the fuel gas back into production**
— quantify that, because it extends plateau life and is often worth more than the emission saving.
## Storage and marine sizing
```python
cargo_m3 = carrier_size_m3 * 0.985 # allow for heel and trim
cargo_t = cargo_m3 * lng_density / 1000.0
cargoes_per_y = plant_mtpa * 1e6 / cargo_t
days_between = 365.25 / cargoes_per_y
berth_occupancy = cargoes_per_y * turnaround_hours / (365.25 * 24)
loading_rate = cargo_m3 / loading_hours # m3/h -> number of arms
```
Rules of thumb: one berth serves up to ~50 % occupancy comfortably; storage of 1.5–2 cargo
volumes (roughly 5 days of production) is the usual minimum; 16-inch arms carry ~3000–4000 m³/h
each.
## Validation gate for any LNG deliverable
1. Specific energy inside the published band for the chosen cycle — **assert it**.
2. LNG density cross-checked against a reference equation.
3. Feed-to-LNG mass balance closes (account for NGL extraction, fuel and end-flash).
4. Feed rate cross-checked against a published plant of similar capacity
(~160–170 MMscfd per MTPA for a lean feed; higher for a rich feed with NGL extraction).
## Related skills
- `neqsim-process-modeling` — building the treatment train that feeds the liquefier
- `neqsim-water-dewpoint-dehydration-screening` — molecular-sieve specification upstream
- `neqsim-equipment-cost-estimation` — costing the trains (watch the correlation validity range)
- `neqsim-ccs-hydrogen` — if the CO2 removed upstream is captured rather than vented