v1.0.0 to v1.0.0

2 added, 559 removed. Audit A to A.

---
name: track-management
description: Use this skill when creating, managing, or working with Conductor tracks - the logical work units for features, bugs, and refactors. Applies to spec.md, plan.md, and track lifecycle operations.
version: 1.0.0
---
# Track Management
Guide for creating, managing, and completing Conductor tracks - the logical work units that organize features, bugs, and refactors through specification, planning, and implementation phases.
## When to Use This Skill
- Creating new feature, bug, or refactor tracks
- Writing or reviewing spec.md files
- Creating or updating plan.md files
- Managing track lifecycle from creation to completion
- Understanding track status markers and conventions
- Working with the tracks.md registry
- Interpreting or updating track metadata
- ## Track Concept
-
- A track is a logical work unit that encapsulates a complete piece of work. Each track has:
-
- - A unique identifier
- - A specification defining requirements
- - A phased plan breaking work into tasks
- - Metadata tracking status and progress
-
- Tracks provide semantic organization for work, enabling:
-
- - Clear scope boundaries
- - Progress tracking
- - Git-aware operations (revert by track)
- - Team coordination
-
- ## Track Types
-
- ### feature
-
- New functionality or capabilities. Use for:
-
- - New user-facing features
- - New API endpoints
- - New integrations
- - Significant enhancements
-
- ### bug
-
- Defect fixes. Use for:
-
- - Incorrect behavior
- - Error conditions
- - Performance regressions
- - Security vulnerabilities
-
- ### chore
-
- Maintenance and housekeeping. Use for:
-
- - Dependency updates
- - Configuration changes
- - Documentation updates
- - Cleanup tasks
-
- ### refactor
-
- Code improvement without behavior change. Use for:
-
- - Code restructuring
- - Pattern adoption
- - Technical debt reduction
- - Performance optimization (same behavior, better performance)
-
- ## Track ID Format
-
- Track IDs follow the pattern: `{shortname}_{YYYYMMDD}`
-
- - **shortname**: 2-4 word kebab-case description (e.g., `user-auth`, `api-rate-limit`)
- - **YYYYMMDD**: Creation date in ISO format
-
- Examples:
-
- - `user-auth_20250115`
- - `fix-login-error_20250115`
- - `upgrade-deps_20250115`
- - `refactor-api-client_20250115`
-
- ## Track Lifecycle
-
- ### 1. Creation (newTrack)
-
- **Define Requirements**
-
- 1. Gather requirements through interactive Q&A
- 2. Identify acceptance criteria
- 3. Determine scope boundaries
- 4. Identify dependencies
-
- **Generate Specification**
-
- 1. Create `spec.md` with structured requirements
- 2. Document functional and non-functional requirements
- 3. Define acceptance criteria
- 4. List dependencies and constraints
-
- **Generate Plan**
-
- 1. Create `plan.md` with phased task breakdown
- 2. Organize tasks into logical phases
- 3. Add verification tasks after phases
- 4. Estimate effort and complexity
-
- **Register Track**
-
- 1. Add entry to `tracks.md` registry
- 2. Create track directory structure
- 3. Generate `metadata.json`
- 4. Create track `index.md`
-
- ### 2. Implementation
-
- **Execute Tasks**
-
- 1. Select next pending task from plan
- 2. Mark task as in-progress
- 3. Implement following workflow (TDD)
- 4. Mark task complete with commit SHA
-
- **Update Status**
-
- 1. Update task markers in plan.md
- 2. Record commit SHAs for traceability
- 3. Update phase progress
- 4. Update track status in tracks.md
-
- **Verify Progress**
-
- 1. Complete verification tasks
- 2. Wait for checkpoint approval
- 3. Record checkpoint commits
-
- ### 3. Completion
-
- **Sync Documentation**
-
- 1. Update product.md if features added
- 2. Update tech-stack.md if dependencies changed
- 3. Verify all acceptance criteria met
-
- **Archive or Delete**
-
- 1. Mark track as completed in tracks.md
- 2. Record completion date
- 3. Archive or retain track directory
-
- ## Specification (spec.md) Structure
-
- ```markdown
- # {Track Title}
-
- ## Overview
-
- Brief description of what this track accomplishes and why.
-
- ## Functional Requirements
-
- ### FR-1: {Requirement Name}
-
- Description of the functional requirement.
-
- - Acceptance: How to verify this requirement is met
-
- ### FR-2: {Requirement Name}
-
- ...
-
- ## Non-Functional Requirements
-
- ### NFR-1: {Requirement Name}
-
- Description of the non-functional requirement (performance, security, etc.)
-
- - Target: Specific measurable target
- - Verification: How to test
-
- ## Acceptance Criteria
-
- - [ ] Criterion 1: Specific, testable condition
- - [ ] Criterion 2: Specific, testable condition
- - [ ] Criterion 3: Specific, testable condition
-
- ## Scope
-
- ### In Scope
-
- - Explicitly included items
- - Features to implement
- - Components to modify
-
- ### Out of Scope
-
- - Explicitly excluded items
- - Future considerations
- - Related but separate work
-
- ## Dependencies
-
- ### Internal
-
- - Other tracks or components this depends on
- - Required context artifacts
-
- ### External
-
- - Third-party services or APIs
- - External dependencies
-
- ## Risks and Mitigations
-
- | Risk | Impact | Mitigation |
- | ---------------- | --------------- | ------------------- |
- | Risk description | High/Medium/Low | Mitigation strategy |
-
- ## Open Questions
-
- - [ ] Question that needs resolution
- - [x] Resolved question - Answer
- ```
-
- ## Plan (plan.md) Structure
-
- ```markdown
- # Implementation Plan: {Track Title}
-
- Track ID: `{track-id}`
- Created: YYYY-MM-DD
- Status: pending | in-progress | completed
-
- ## Overview
-
- Brief description of implementation approach.
-
- ## Phase 1: {Phase Name}
-
- ### Tasks
-
- - [ ] **Task 1.1**: Task description
- - Sub-task or detail
- - Sub-task or detail
- - [ ] **Task 1.2**: Task description
- - [ ] **Task 1.3**: Task description
-
- ### Verification
-
- - [ ] **Verify 1.1**: Verification step for phase
-
- ## Phase 2: {Phase Name}
-
- ### Tasks
-
- - [ ] **Task 2.1**: Task description
- - [ ] **Task 2.2**: Task description
-
- ### Verification
-
- - [ ] **Verify 2.1**: Verification step for phase
-
- ## Phase 3: Finalization
-
- ### Tasks
-
- - [ ] **Task 3.1**: Update documentation
- - [ ] **Task 3.2**: Final integration test
-
- ### Verification
-
- - [ ] **Verify 3.1**: All acceptance criteria met
-
- ## Checkpoints
-
- | Phase | Checkpoint SHA | Date | Status |
- | ------- | -------------- | ---- | ------- |
- | Phase 1 | | | pending |
- | Phase 2 | | | pending |
- | Phase 3 | | | pending |
- ```
-
- ## Status Marker Conventions
-
- Use consistent markers in plan.md:
-
- | Marker | Meaning | Usage |
- | ------ | ----------- | --------------------------- |
- | `[ ]` | Pending | Task not started |
- | `[~]` | In Progress | Currently being worked |
- | `[x]` | Complete | Task finished (include SHA) |
- | `[-]` | Skipped | Intentionally not done |
- | `[!]` | Blocked | Waiting on dependency |
-
- Example:
-
- ```markdown
- - [x] **Task 1.1**: Set up database schema `abc1234`
- - [~] **Task 1.2**: Implement user model
- - [ ] **Task 1.3**: Add validation logic
- - [!] **Task 1.4**: Integrate auth service (blocked: waiting for API key)
- - [-] **Task 1.5**: Legacy migration (skipped: not needed)
- ```
-
- ## Track Registry (tracks.md) Format
-
- ```markdown
- # Track Registry
-
- ## Active Tracks
-
- | Track ID | Type | Status | Phase | Started | Assignee |
- | ------------------------------------------------ | ------- | ----------- | ----- | ---------- | ---------- |
- | [user-auth_20250115](tracks/user-auth_20250115/) | feature | in-progress | 2/3 | 2025-01-15 | @developer |
- | [fix-login_20250114](tracks/fix-login_20250114/) | bug | pending | 0/2 | 2025-01-14 | - |
-
- ## Completed Tracks
-
- | Track ID | Type | Completed | Duration |
- | ---------------------------------------------- | ----- | ---------- | -------- |
- | [setup-ci_20250110](tracks/setup-ci_20250110/) | chore | 2025-01-12 | 2 days |
-
- ## Archived Tracks
-
- | Track ID | Reason | Archived |
- | ---------------------------------------------------- | ---------- | ---------- |
- | [old-feature_20241201](tracks/old-feature_20241201/) | Superseded | 2025-01-05 |
- ```
-
- ## Metadata (metadata.json) Fields
-
- ```json
- {
- "id": "user-auth_20250115",
- "title": "User Authentication System",
- "type": "feature",
- "status": "in-progress",
- "priority": "high",
- "created": "2025-01-15T10:30:00Z",
- "updated": "2025-01-15T14:45:00Z",
- "started": "2025-01-15T11:00:00Z",
- "completed": null,
- "assignee": "@developer",
- "phases": {
- "total": 3,
- "current": 2,
- "completed": 1
- },
- "tasks": {
- "total": 12,
- "completed": 5,
- "in_progress": 1,
- "pending": 6
- },
- "checkpoints": [
- {
- "phase": 1,
- "sha": "abc1234",
- "date": "2025-01-15T13:00:00Z"
- }
- ],
- "dependencies": [],
- "tags": ["auth", "security"]
- }
- ```
-
- ## Track Operations
-
- ### Creating a Track
-
- 1. Run `/conductor:new-track`
- 2. Answer interactive questions
- 3. Review generated spec.md
- 4. Review generated plan.md
- 5. Confirm track creation
-
- ### Starting Implementation
-
- 1. Read spec.md and plan.md
- 2. Verify context artifacts are current
- 3. Mark first task as `[~]`
- 4. Begin TDD workflow
-
- ### Completing a Phase
-
- 1. Ensure all phase tasks are `[x]`
- 2. Complete verification tasks
- 3. Wait for checkpoint approval
- 4. Record checkpoint SHA
- 5. Proceed to next phase
-
- ### Completing a Track
-
- 1. Verify all phases complete
- 2. Verify all acceptance criteria met
- 3. Update product.md if needed
- 4. Mark track completed in tracks.md
- 5. Update metadata.json
-
- ### Reverting a Track
-
- 1. Run `/conductor:revert`
- 2. Select track to revert
- 3. Choose granularity (track/phase/task)
- 4. Confirm revert operation
- 5. Update status markers
-
- ## Handling Track Dependencies
-
- ### Identifying Dependencies
-
- During track creation, identify:
-
- - **Hard dependencies**: Must complete before this track can start
- - **Soft dependencies**: Can proceed in parallel but may affect integration
- - **External dependencies**: Third-party services, APIs, or team decisions
-
- ### Documenting Dependencies
-
- In spec.md, list dependencies with:
-
- - Dependency type (hard/soft/external)
- - Current status (available/pending/blocked)
- - Resolution path (what needs to happen)
-
- ### Managing Blocked Tracks
-
- When a track is blocked:
-
- 1. Mark blocked tasks with `[!]` and reason
- 2. Update tracks.md status
- 3. Document blocker in metadata.json
- 4. Consider creating dependency track if needed
-
- ## Track Sizing Guidelines
-
- ### Right-Sized Tracks
-
- Aim for tracks that:
-
- - Complete in 1-5 days of work
- - Have 2-4 phases
- - Contain 8-20 tasks total
- - Deliver a coherent, testable unit
-
- ### Too Large
-
- Signs a track is too large:
-
- - More than 5 phases
- - More than 25 tasks
- - Multiple unrelated features
- - Estimated duration > 1 week
-
- Solution: Split into multiple tracks with clear boundaries.
-
- ### Too Small
-
- Signs a track is too small:
-
- - Single phase with 1-2 tasks
- - No meaningful verification needed
- - Could be a sub-task of another track
- - Less than a few hours of work
-
- Solution: Combine with related work or handle as part of existing track.
-
- ## Specification Quality Checklist
-
- Before finalizing spec.md, verify:
-
- ### Requirements Quality
-
- - [ ] Each requirement has clear acceptance criteria
- - [ ] Requirements are testable
- - [ ] Requirements are independent (can verify separately)
- - [ ] No ambiguous language ("should be fast" → "response < 200ms")
-
- ### Scope Clarity
-
- - [ ] In-scope items are specific
- - [ ] Out-of-scope items prevent scope creep
- - [ ] Boundaries are clear to implementer
-
- ### Dependencies Identified
-
- - [ ] All internal dependencies listed
- - [ ] External dependencies have owners/contacts
- - [ ] Dependency status is current
-
- ### Risks Addressed
-
- - [ ] Major risks identified
- - [ ] Impact assessment realistic
- - [ ] Mitigations are actionable
-
- ## Plan Quality Checklist
-
- Before starting implementation, verify plan.md:
-
- ### Task Quality
-
- - [ ] Tasks are atomic (one logical action)
- - [ ] Tasks are independently verifiable
- - [ ] Task descriptions are clear
- - [ ] Sub-tasks provide helpful detail
-
- ### Phase Organization
-
- - [ ] Phases group related tasks
- - [ ] Each phase delivers something testable
- - [ ] Verification tasks after each phase
- - [ ] Phases build on each other logically
-
- ### Completeness
-
- - [ ] All spec requirements have corresponding tasks
- - [ ] Documentation tasks included
- - [ ] Testing tasks included
- - [ ] Integration tasks included
-
- ## Common Track Patterns
-
- ### Feature Track Pattern
-
- ```
- Phase 1: Foundation
- - Data models
- - Database migrations
- - Basic API structure
-
- Phase 2: Core Logic
- - Business logic implementation
- - Input validation
- - Error handling
-
- Phase 3: Integration
- - UI integration
- - API documentation
- - End-to-end tests
- ```
-
- ### Bug Fix Track Pattern
-
- ```
- Phase 1: Reproduction
- - Write failing test capturing bug
- - Document reproduction steps
-
- Phase 2: Fix
- - Implement fix
- - Verify test passes
- - Check for regressions
-
- Phase 3: Verification
- - Manual verification
- - Update documentation if needed
- ```
-
- ### Refactor Track Pattern
-
- ```
- Phase 1: Preparation
- - Add characterization tests
- - Document current behavior
-
- Phase 2: Refactoring
- - Apply changes incrementally
- - Maintain green tests throughout
+ ## Detailed patterns and worked examples
- Phase 3: Cleanup
- - Remove dead code
- - Update documentation
- ```
+ Detailed pattern documentation lives in `references/details.md`. Read that file when the navigation tier above is insufficient.
## Best Practices
1. **One track, one concern**: Keep tracks focused on a single logical change
2. **Small phases**: Break work into phases of 3-5 tasks maximum
3. **Verification after phases**: Always include verification tasks
4. **Update markers immediately**: Mark task status as you work
5. **Record SHAs**: Always note commit SHAs for completed tasks
6. **Review specs before planning**: Ensure spec is complete before creating plan
7. **Link dependencies**: Explicitly note track dependencies
8. **Archive, don't delete**: Preserve completed tracks for reference
9. **Size appropriately**: Keep tracks between 1-5 days of work
10. **Clear acceptance criteria**: Every requirement must be testable