name: feature-decomposition
description: >
- Deciding whether a feature should be split at all and, when it should, into what: child features only
- where they carry independent value someone can state, Tech Features for independently useful
- engineering outcomes, and below both a flat list of implementation resources with identifiers,
- dependencies and their own validation. Use when a feature is about to be implemented as one
- undifferentiated lump, when a small change is being ceremonially split into items nobody
- needs, when work has to be ordered because parts depend on each other, when two people or two
- sessions will share the work, or when progress cannot be reported because there is nothing to
- report progress against. Does not write the plan around the breakdown
- (feature-implementation-plan), does not track the resulting statuses
- (feature-progress-tracking), and does not estimate any of it
- (estimation-under-uncertainty).
+ Deciding whether a feature should split and, when useful, defining independently valuable Product
+ or Tech child features. During definition, stays at outcomes, owners and acceptance; during
+ engineering delivery preparation, defines implementation resources with stable identifiers,
+ dependencies and validation. Use when several outcomes are bundled together, a small change is
+ being over-split, dependencies or shared work need a breakdown, or progress lacks meaningful units.
+ Does not approve scope or acceptance, write the implementation plan (feature-implementation-plan),
+ track delivery statuses (feature-progress-tracking), or estimate effort (estimation-under-uncertainty).
---
# Feature Decomposition
## Purpose
Decomposition commonly earns its cost through work that can be **validated
independently**, work that must be **ordered** because of a real dependency, and work that will
be **shared** across people or sessions. Outside those, a breakdown is a table of contents for a
change that would have been easier to read as a diff.
- The output that always matters is the **resource list**. Child Product/Tech Features above it are
- optional and must remain valuable, independently decidable/deliverable, and testable; resources are
- what gets implemented, validated and tracked.
+ Child Product/Tech Features must remain valuable, independently decidable/deliverable, and testable.
+ During delivery preparation, **resources** are what gets implemented, validated and tracked.
+ The calling stage determines which of these outputs is needed.
- ## Workflow
+ ## Choose the current stage
+ Inspect the request, current definition/analysis revision, accepted scope and any existing breakdown
+ before adding items. Reuse supplied IDs and authorization. If the requested stage is materially
+ unclear, resolve that boundary before creating a delivery breakdown.
+
+ - **Definition:** decide whether child features earn their cost. Return `PF-*` or `TF-*` with value,
+ beneficiary, independently checkable acceptance, dependencies and the reason for the split, or
+ a concise reason to keep one feature. Product owns Product Feature intent and `BAC-*`; Engineering
+ owns Tech Features and technical criteria. Within a product-owned definition, flag technical
+ enablement for the engineering handoff instead of deciding its solution or `TC-*`. Preserve
+ proposed versus accepted status. Do not create delivery `RES-*`, file tasks or status ledgers
+ merely because `collaborative-feature-definition` invoked this skill.
+ - **Delivery preparation or revision:** use the resource workflow below against the applicable
+ scope and acceptance baseline. Carry criteria from their owning stage; missing or changed
+ acceptance is a question for that owner, not permission to invent intent in the breakdown.
+
+ ## Delivery resource workflow
+
1. **Test whether to decompose at all.** If the feature is one resource, say so and produce a
one-line list. That is a complete answer.
- 2. **Produce the resource list first**, from the impact map. Each element in the map becomes a
- resource or joins one; nothing in the map is unaccounted for.
+ 2. **Produce the resource list first**, from the impact map. Account for each entry as scoped work,
+ validation coverage or an evidenced unchanged dependency. A `READ` entry need not become an edit:
+ link the resource that verifies its relied-on behavior or cite applicable existing evidence.
Reuse the current map/scope revision. If none exists, record a minimal source-to-resource
mapping for the known work; leave material unknowns open rather than inventing files or scope.
- 3. **Give each resource a `RES-*` identifier, a dependency list and a validation** — the fields are in
- `references/resource-catalogue.md`. A resource with no stated validation is not finished
- being defined.
+ 3. **Reuse each resource's `RES-*` identifier or assign one to new work**, with dependencies and
+ validation. Read `references/resource-catalogue.md` for fields, examples and revision rules.
+ A resource with no stated validation is not finished being defined.
4. **Create child features only when the grouping adds an independently valuable outcome.** A Product
Feature uses `PF-*`; a Tech Feature uses `TF-*` and names measurable engineering value.
5. **Keep enabling work as resources by default.** A migration, component, infrastructure change, or
test harness is `RES-*` unless it independently reduces risk/cost or enables a usable capability
with its own acceptance. Do not manufacture a Tech Feature from a phase or layer.
6. **Order the resources** by their dependencies, and say where the order is forced versus
merely convenient.
Check missing IDs and cycles. A cycle calls for clarifying a shared contract, splitting a
producer from its consumer, or merging inseparable work; do not invent a linear order over it.
7. **Say why the shape is what it is** — including "not decomposed, because it is one resource".
## When to decompose
| Signal | Decompose? |
| ------------------------------------------------------------- | ---------- |
| Parts can be validated independently | Yes |
| Parts must be ordered because one produces what another needs | Yes |
| Parts will be worked by different people or across sessions | Yes |
| Part of it could ship without the rest | Yes |
| It is one file, one test, one behaviour | No |
| The split would be by layer for its own sake | No |
| The parts are only separable on paper | No |
- Splitting one behaviour across a controller story, a service story and a repository story
- produces three items none of which can be validated alone. That is not decomposition; it is
- transcription of the layer diagram.
+ These signals justify considering a split at the current stage, not a fixed item count. Shared
+ work or a dependency alone does not establish independent child-feature value. Splitting one behavior
+ into controller, service and repository stories usually leaves incomplete outcomes. Layer-specific
+ delivery resources can still be useful for a real handoff or staged contract, with validation and
+ integration prerequisites explicit; they do not become child features merely by being testable.
## Decision rules
```text
IF a child cannot state independent product or engineering value and its own acceptance
- THEN it is not a child feature; keep its work as RES-* under the parent.
+ THEN it is not a child feature. At definition, record any enabling need for the owning stage;
+ during delivery breakdown, keep its work as RES-* under the parent.
IF a resource has many dependencies
THEN verify each necessary input and distinguish implementation, validation and release order.
A legitimate integration resource may consume many outputs; count alone does not justify a split.
IF two resources always change together and are always validated together
THEN consider merging unless ownership, staged compatibility or a real handoff requires separation.
IF a resource cannot be validated without another resource existing
THEN say so in its validation, and let the order follow from it.
IF a resource lacks a path to in-scope impact and acceptance
THEN identify the missing mapping or scope decision. One impact entry can justify several
resources, and one resource can satisfy several entries; counts are not a scope test.
IF a resource is "write the tests"
THEN it is misplaced: tests belong to the resource whose behaviour they establish.
A separate test resource is legitimate only for shared harness or fixture work.
- IF the feature is Light
+ IF preparing a delivery breakdown for a Light feature
THEN return one concise resource with its validation when it remains one local outcome.
If material dependencies or boundaries emerge, report the changed driver for reclassification;
this analysis does not itself authorize implementation.
```
## Constraints
- **Do not split to look thorough.** Three resources implemented and tracked beat eleven
resources of which six are one line each.
- **Do not decompose by layer by default.** Decompose by behaviour, and let a behaviour touch
several layers.
- **Every resource traces to the impact map and to scope.** A resource that traces to neither is
scope creep with an identifier.
- **Do not estimate here.** Sizes and dates are a separate concern with separate discipline.
- Preserve supplied Java/framework/runtime and compatibility constraints in each affected
resource. Decomposition does not choose upgrades or a new technical baseline.
## Output
+ At definition, return only the child-feature decision and its stage-owned evidence described above.
+ For delivery preparation, use a proportionate version of this breakdown:
+
```text
+ Baseline <scope and acceptance revision/source>
Decomposition child features and resources | resources only | none
Because <the signal that decided it>
PF-01 <independently valuable product outcome and BAC-*>
RES-01 <resource>
RES-02 <resource>
TF-01 <independently valuable engineering outcome and TC-*>
RES-03 <resource>
Parent resources (including work not assigned to a child)
RES-04 <resource>
Dependencies RES-02 needs RES-01's column; RES-03 needs RES-02's contract
Ready first RES-01, RES-04 (no dependency between them)
Then RES-02 -> RES-03; RES-04 may proceed independently
```
Execution consumes resource scope, acceptance, ownership and dependencies together. Independence
in the graph permits parallel planning only when shared-file/resource ownership is also resolved.
Before handoff, check scope coverage, unique/stable IDs, an acyclic dependency graph and validation
for each resource; report unresolved dependencies rather than claiming the breakdown ready.
+ A defined breakdown does not establish accepted scope, implementation or observed validation.