implementation-planning · diff
git:20260627.37ddf8c to git:20260627.9d6a7b2
7 added, 7 removed. Audit C to C.
What this update changes in the checks
No check changed: every fixed check gives the same answer before and after this update.
A tripped check is a label, not a verdict: read the matched text and the lines below. This week's updates that newly trip a check.
Title: Implementation Planning
Keywords: plan, implementation, task-breakdown, bite-sized, file-paths, code-plan, TDD-plan
Agents: planning, product
When to use: When you have sprint acceptance criteria or requirements and need to create a detailed, step-by-step implementation plan before writing code.
Version: 1.0.0
Last updated: 2026-03-18
Write comprehensive implementation plans assuming the implementing agent has zero codebase context. Document everything: which files to touch, exact code patterns, how to test, bite-sized steps (2-5 minutes each). Plans follow TDD: each task starts with a failing test. This skill complements `sprint-decomposition` — decomposition identifies WHAT tasks to do; this skill details HOW to do each task.
---
## When to Use
- After `sprint-decomposition` produces the task list
- When a task is complex enough to need step-by-step instructions
- When the implementing agent needs exact file paths, code snippets, and test commands
- Before handing off to `agent-task-execution` workflow
**Do not use for:**
- Simple single-file changes (direct agent dispatch is sufficient)
- Tasks already detailed in the sprint spec
---
## Workflow
### Step 1 — Scope Check
If the sprint covers multiple independent subsystems, each should get its own plan. Each plan should produce working, testable software on its own.
### Step 2 — Map File Structure
Before defining tasks, map out which files will be created or modified:
- Design units with clear boundaries and well-defined interfaces
- Each file should have one clear responsibility
- Follow established project patterns (see `memories/engineering-code-patterns.md`)
- In this codebase: follow the module checklist in CLAUDE.md
### Step 3 — Write Bite-Sized Steps
**Each step is one action (2-5 minutes):**
```markdown
### Task N: [Component Name]
**Files:**
- - Create: `src/backend/src/modules/<module>/<name>-service.ts`
- - Modify: `src/backend/src/app.ts` (wire service + routes)
- - Test: `src/backend/src/__tests__/modules/<module>/<name>-service.test.ts`
+ - Create: the backend modules
+ - Modify: the backend (wire service + routes)
+ - Test: the backend
**Acceptance criteria:** [verbatim from sprint spec]
- [ ] **Step 1: Write the failing test**
[Exact test code following test-patterns skill]
- [ ] **Step 2: Run test to verify it fails**
- Run: `npx vitest run src/backend/src/__tests__/modules/<module>/<name>-service.test.ts`
+ Run: `npx vitest run the backend
Expected: FAIL with "function not defined" or similar
- [ ] **Step 3: Write minimal implementation**
[Exact implementation code following service-pattern / component-pattern]
- [ ] **Step 4: Run test to verify it passes**
- Run: `npx vitest run src/backend/src/__tests__/modules/<module>/<name>-service.test.ts`
+ Run: `npx vitest run the backend
Expected: PASS
- [ ] **Step 5: Commit**
`git add <files> && git commit -m "feat(<module>): add <feature>"`
```
### Step 4 — Include Required Context
For each task, include:
- **Exact file paths** — never "create a service somewhere"
- **Complete code** — not "add validation" but the actual validation code
- **Exact test commands** with expected output
- - **Build verification** — `npx tsc -p src/shared/tsconfig.json` etc.
+ - **Build verification** — `npx tsc -p the shared packagetsconfig.json` etc.
- **Pattern references** — which skill to follow (service-pattern, component-pattern, etc.)
### Step 5 — Plan Review
After writing the plan:
1. Verify every acceptance criterion maps to at least one task
2. Verify file paths exist or will be created by preceding tasks
3. Verify dependency order (shared → backend → frontend)
4. Verify TDD steps are present for each task
---
## Plan Document Format
```markdown
# Sprint X.Y.Z — Implementation Plan
**Goal:** [One sentence]
**Architecture:** [2-3 sentences about approach]
**Build order:** shared → backend → frontend
---
### Task 1: [Title]
**Agent:** [backend | frontend | ...]
**Files:** [explicit paths]
**Depends on:** [task numbers or "none"]
**Acceptance criteria:** [which AC items]
[Bite-sized steps with code, tests, commands]
### Task 2: ...
```
---
## Key Principles
- **Exact file paths always** — implementing agents should never search for files
- **Complete code in plan** — not summaries or placeholders
- **TDD built-in** — every task starts with a failing test
- **DRY, YAGNI** — don't plan features beyond what's specified
- **Build verification** — each task includes build check after implementation
- **Frequent commits** — one commit per task minimum
---
## Anti-Patterns
- Vague instructions ("update the backend") instead of exact file paths
- Missing test steps — every task must include TDD cycle
- Skipping dependency order — shared types must precede backend/frontend
- Orphaned acceptance criteria — every AC must map to a task
- Over-planning — don't detail simple single-file changes
---
## Checklist
- [ ] Scope checked (single subsystem per plan)
- [ ] File structure mapped before task definition
- [ ] Every step is bite-sized (2-5 minutes, one action)
- [ ] Exact file paths for all creates/modifies
- [ ] Complete code included (not placeholders)
- [ ] TDD cycle in every task (test → fail → implement → pass → commit)
- [ ] Build verification included
- [ ] Every acceptance criterion maps to a task
- [ ] Dependency order respected (shared → backend → frontend)
---
## Related Skills
- `sprint-decomposition` — identifies tasks; this skill details them
- `task-routing` — assigns tasks to agents
- `agent-task-execution` — executes the plan this skill produces
## Input Schema
```yaml
input:
sprint_spec_path:
type: string
required: true
- description: "Path to the sprint spec file (e.g., docs/product/phases/phase-N/sprint-X.Y.Z.md)"
+ description: "Path to the sprint spec file (e.g., docs)"
task_list:
type: array
items:
type: object
properties:
task_number: { type: integer }
description: { type: string }
agent: { type: string }
size: { type: enum, values: [S, M, L] }
files: { type: array, items: string }
required: true
description: "Task table from sprint-decomposition to create detailed implementation plans for"
plan_scope:
type: enum
values: [full-sprint, single-task]
required: false
default: full-sprint
description: "Whether to plan the entire sprint or a single task"
```
## Output Schema
```yaml
output:
implementation_plan:
type: object
properties:
goal: { type: string }
architecture_summary: { type: string }
build_order: { type: string }
task_plans:
type: array
items:
type: object
properties:
task_number: { type: integer }
title: { type: string }
agent: { type: string }
files: { type: array, items: string }
depends_on: { type: array, items: integer }
acceptance_criteria: { type: array, items: string }
steps:
type: array
items:
type: object
properties:
step_number: { type: integer }
action: { type: string }
code: { type: string }
test_command: { type: string }
expected_result: { type: string }
unmapped_criteria:
type: array
items: string
description: "Any acceptance criteria not covered by task plans (should be empty)"
```
## Quality Gate
- Every acceptance criterion from the sprint spec maps to at least one task plan step
- Every task plan includes TDD steps (failing test, implementation, passing test)
- All file paths are explicit and verified against the project structure
- Dependency order is respected (shared types -> backend -> frontend -> tests -> docs)
## Chain Metadata
```yaml
chain_metadata:
skill_slug: "implementation-planning"
stage: "S2"
suggested_next:
- slug: "agent-task-execution"
stage: "S2"
reason: "Detailed implementation plans are ready for sub-agent dispatch and execution"
- slug: "tdd-discipline"
stage: "S3"
reason: "Implementation plans include TDD steps that must be followed during execution"
```
## Error Handling
- If the sprint spec is missing acceptance criteria or has ambiguous requirements, halt planning and request clarification before producing step-by-step plans
- If file paths referenced in task plans do not exist and are not created by a preceding step, flag the gap and adjust the plan to include the creation step
- If a task is too large (L-sized with 10+ steps), split into sub-tasks with their own TDD cycles and dependency ordering
- If the plan scope is single-task but the task has unmet dependencies, include the dependency context in the plan header and note what must be completed first