team-security-review · git:20261021.9571168 · 2026-10-21 · sha256 01dfb07bcda19598
team-security-review git:20261021.9571168A
Immutable. This exact content never changes and is served at /api/v1/blob/01dfb07bcda19598.
--- name: team-security-review description: 'Use for running the Team security review phase only on explicit request. Never infer from a plain security review request. Reviews and fixes the branch.' effort: medium argument-hint: "[docs/plans/<id>/]" --- # Team Security Review Before each dispatch or retry, read [host dispatch](../team/references/15-host-dispatch.md) and supply its resolved installed paths. Before artifact work, read [artifact schema](../team/references/artifacts.md). Before the tier sort, read [finding format](../team/references/findings.md). Before each consuming step, read its linked shared rules from this installed skill directory. If a required read fails, stop that step with the exact path. Never use checkout fallback or recursive loading. Before finalizing prose you author, read the [writing standards](../team/references/writing.md). Relay completed reviewer reports unchanged. ## Core contracts - Run after CODE REVIEW passes. Require the `team-code-review` entry conditions, plus a newest `review-<n>.md` that is PASS and current. - Dispatch `security-reviewer` alone. No other phase dispatches it. - Run the review loop that the `team-code-review` execution reference states, with the deltas in [Execution](references/02-execution.md). - Write one `security-review-<n>.md` per completed round. Never overwrite a record. - Seed TodoWrite with `Security review round <n>`. Retry as `Security review round <n+1> (<b> Blocking, <m> Major open)`. - **Never** stop to ask the user which Blocking or Major items to address (the no-consult rule). - The loop has no count cap. It ends only when no Blocking or Major finding remains. - At PASS, when the TodoWrite ledger holds a `PR` phase item, return to the `/team` phase loop in the same turn. Otherwise, print the Next line that [Execution](references/02-execution.md) step 9 names. - Never load `team-code-review` or `team-pr`. ## Procedure references Read each reference completely when reaching that stage. Follow them in order. 1. [Input](references/01-input.md) 2. [Execution](references/02-execution.md) ## Applied principles Read and apply: [execution rules](../team/references/execution.md).