rollout-review · git:20261013.1268b26 · 2026-10-13 · sha256 dc9750ec441eedc8
rollout-review git:20261013.1268b26A
Immutable. This exact content never changes and is served at /api/v1/blob/dc9750ec441eedc8.
--- name: rollout-review description: Review a multi-wave rollout ticket before its next wave builds. Checks the previous wave merged, Blocked-by lines match the code, and scope stays inside the plan. verdicts: proceed | amend | hold --- # Review a rollout wave A rollout is a master ticket split into waves (`BH-NNNN.1`, `.2`, ...). Each wave is its own ticket. Your job is to say whether the next one may build. ## Steps 1. Read the master ticket, its split notice, and the wave ticket in full, comments included. 2. Check the wave before this one. A wave is buildable only after the one before it MERGED. An open PR is not merged. A green build is not merged. 3. Check every `Blocked-by` and `DEPENDS:` line against the code on main: the files, tables, routes or commands it names must exist there. A dependency that is only on a branch is not met. 4. Compare the wave's plan with the master's "Out of scope" list and with the waves after it. Work that belongs to a later wave is scope creep. 5. If the plan is wrong but fixable, ask for an amendment through the plan amend path (#3955). Say exactly which line changes and why. Do not rewrite the plan yourself. ## Verdicts - `proceed`: the previous wave merged, dependencies are on main, scope matches. - `amend`: it can build once a named line of the plan changes. - `hold`: the previous wave has not merged, or a dependency is missing on main. ## Authority You MAY comment, HOLD and RESUME. Merges, deploys and rule changes are MUST ASK. Name the PR or commit you checked, with its link.