cvg-plan-loop · git:20260913.5b2ea3c · 2026-09-13 · sha256 4c1bb55157b81c69

cvg-plan-loop git:20260913.5b2ea3cA

Immutable. This exact content is served forever at /api/v1/blob/4c1bb55157b81c69.

---
name: cvg-plan-loop
description: Orchestrate a monitored planning loop where a planner drafts the plan and independent plan review with focused rechecks gates completion. Use when the user asks to create or revise a plan through supervised specialist sessions on Codex threads or Claude Code background agents.
argument-hint: "[planning goal, requirements path, behavior contract path, or planning prompt]"
---

# Plan Loop

Use this skill for plan-only cvg-multi-session orchestration.

Read `references/cvg-multi-session-protocol.md` once when entering the loop, then apply the protocol gates from `cvg-multi-session`:

- transport binding gate,
- real specialist session gate,
- orchestrator callback transport gate,
- waiting handoff gate,
- cvg-plan-review-feedback gate,
- independent-review exit gate.

Do not implement product code in this workflow.

## Phase 0: Orchestrator Setup

Record:

- current orchestrator session id (Codex thread id; on Claude Code the harness tracks it),
- worktree or repo path,
- current `git rev-parse HEAD` if available,
- dirty worktree state,
- source prompt or input document,
- expected plan path or target docs directory when known,
- the loop ledger path, created per the Gate 5 loop-ledger rule.

Classify dirty files:

- plan-owned files,
- unrelated user artifacts,
- files the planner must not touch.

## Phase 1: Planner Handoff

Spawn the planner as a real specialist session (Gate 0 spawn operation) and
record the id returned by the tool. Verify it per Gate 1; if it is not
verifiable, do not continue.

Planner prompt must include:

- role: planner,
- callback destination per Gate 2,
- required planning skill, such as `cvg-plan` or another user-specified plan skill,
- source prompt, requirements path, or exact user goal,
- repo path and starting state,
- dirty-state warning when present,
- plan-only boundary,
- output path rules,
- task-specific external side-effect boundary,
- callback transport block,
- callback template.

Do not restate the planning skill's process or paste broad repo rules, likely
files, or local policy summaries unless they are the user's source authority.

Planner callback template:

```text
I am the planner. My specialist id is <planner-id>. This planning round is complete. Plan path: <absolute path>. Key status: <brief>. Please decide the next step.
```

Complete the waiting handoff per Gate 3 and end the active turn.

## Phase 2: Fresh Plan Review

After the planner callback is visible, spawn a new fresh reviewer specialist
session and verify its id per Gate 1.

Reviewer prompt must include:

- original user outcome, non-goals and authorized changes,
- required independent reviewer signatures, if the user specified any,
- role: fresh plan reviewer,
- the line `Do not consult project memory, prior sessions, rollout summaries, or external history. The repository's own git history (log, blame, commit messages) is repo evidence, not external history.` before the required skill line,
- callback destination per Gate 2,
- required cvg-plan-review skill, such as `cvg-plan-review`,
- original planning goal or source prompt,
- plan path,
- repo path,
- read-only boundary,
- blocker-only reporting rule,
- task-specific external side-effect boundary,
- callback transport block,
- callback template.

Do not paste the full planning prompt or all context documents when the plan
links its authorities and the reviewer can read the worktree.

Reviewer callback template:

```text
I am the fresh reviewer. My specialist id is <reviewer-id>. This first-pass full review is complete. Verdict: <clean / blocking findings>. Findings: <none or numbered concise list>. Please decide the next step.
```

Complete the waiting handoff per Gate 3 and end the active turn while waiting.

Blocking plan findings include:

- missing required surface,
- incomplete behavior contract coverage,
- wrong ownership boundary,
- unclear external or API contract,
- missing migration, rollback, deletion, privacy, or safety lifecycle,
- insufficient test or verification gate,
- plan criterion that cannot be implemented as written,
- unsafe side-effect assumption.

## Phase 3: Return Review Feedback to Planner

If the reviewer reports blockers, send the reviewer feedback to the same verified planner session with the continue operation (Gate 0).

Adjudicate per Gate 4 before routing; retain original findings and reasons in
the loop ledger.

The feedback prompt must include:

- callback destination per Gate 2,
- reviewer specialist id,
- required feedback skill: `cvg-plan-review-feedback`,
- original planning goal and source prompt,
- current plan path and related contracts,
- exact reviewer findings and evidence-based adjudications under a
  `Plan Review Feedback Input` section,
- task-specific external side-effect boundary,
- callback transport block,
- callback template.

Do not restate the feedback skill's intake, classification, or revision rules.

Complete the waiting handoff per Gate 3 and end the active turn.

## Phase 4: Focused Re-Review

After the planner feedback callback is visible and a reviewable plan revision exists, send a focused re-review request to the same verified reviewer session with the continue operation.

Focused scope:

- verify old blockers were addressed,
- check directly related contradictions introduced by the revision,
- do not redo broad review unless the plan's core design changed.

The focused re-review prompt must include the callback
transport block and exact callback template.

Complete the waiting handoff per Gate 3 and end the active turn.

If the planner reports a contract decision, escalation, or clarification need, route that callback to the appropriate reviewer or user decision before requesting re-review.

If same reviewer still finds blockers, repeat Phase 3.

If the same reviewer passes, evaluate completion in Phase 5.

## Phase 5: Review Exit

Apply Gate 5 for completion, new full-review conditions, adjudications and the
original repair-round cap. When another full review is warranted, use the
Phase 2 prompt and verify the new specialist identity. Carry non-blocking P2
notes into the completion summary.

## Completion Summary

Report:

- plan path,
- planner specialist id,
- reviewer specialist ids,
- callback transport status,
- blockers and planner `cvg-plan-review-feedback` results,
- independent review verdict and focused rechecks,
- known gaps.