planning-and-design · diff
git:20261119.236af74 to git:20261119.b9cdaab
10 added, 1 removed. Audit A to A.
What this update changes in the checks
No check changed: every fixed check gives the same answer before and after this update.
A tripped check is a label, not a verdict: read the matched text and the lines below. This week's updates that newly trip a check.
---
name: planning-and-design
description: >
Perform final planning/design in the Planning Orchestrator's current session
after the selected specialists return. Use for final plan/design and assembly
or an authorized planning correction. Do not dispatch a separate author, repeat
specialist requirements or SEIT work, or start implementation.
---
# Final Planning and Design
Controller procedure, not a configured specialist role or extra invocation. Use `../bearing-lite/SKILL.md` and its planning-assembly instructions.
## Inputs and loop
Consume confirmed alignment/scope (including the chosen process tier: `light` —
Orchestrator plus one author — `standard`, or `full`), the frozen requirement
skeleton (UIDs and titles) and frozen decisions established at specialist
dispatch, requirements and definitions, `mbse` (`roles.mbse.sessions.planning`)
architecture/model inputs, `integration_test`
(`roles.integration_test.sessions.planning`) boundary, assembly, and SEIT
contracts, evidence, selected routes/capabilities, cadence, authority, and
repository rules. `mbse` and `integration_test` start in parallel from the
frozen requirement skeleton and decisions when required by the process tier and
task; in `light` tier, skip unneeded specialist sessions (`required_sessions: []`)
- and keep the package proportional to the work. Any needed decision change
+ and keep the package proportional to the work. For a **contained tool change**,
+ tier resolution (`resolveProcessTier` in `hooks/verification.cjs`) selects the
+ lighter `light` planning tier only when every named criterion holds—tool change
+ (`tool_change: true`), one repository (`one_repository: true` or `repositories: 1`),
+ no new trust boundary (`new_trust_boundary: false`), no live host (`live_host: false`),
+ and no other `full`-tier risk factor or explicit owner tier—yielding fewer planning
+ sessions (`planning_sessions: 0`, `required_sessions: []`, planning stays in the
+ Planning Orchestrator), the same `hooks/plan-package.cjs` freeze (`same_freeze: true`),
+ and one review when requested (`reviews: 1`); any unmet or unknown criterion keeps
+ the prior tier. Any needed decision change
surfaced mid-wave waits for assembly rather than amending decisions mid-wave.
Reuse adequate sources for inactive roles; expose missing required inputs rather
than inventing them.
Any unresolved material scope, behavior, authority, risk, or
acceptance intent returns `REROUTE_SCOPE_DEFINITION` to combined alignment/scope in
this controller session; generate no `implementation.json` or Manifest and never
choose for the owner. Any scope decision that drops an acceptance item is an
owner question box (`OWNER_DECISION_REQUIRED`), even under delegation.
1. Verify settled intent and source/candidate bindings. Establish whether a
requirements register exists; if evidence cannot decide, ask the owner. Never
infer one; keep register references versus Lifecycle-local requirements distinct.
2. Author the technical plan and `design.md` from the completed inputs, keeping
**one plan per phase** (split multi-phase work into separate phase plans
instead of combining multiple phases into one plan). Decide per phase between
a **short reviewed command list** (`reviewed_command_list`) and **new reusable
tooling** (`new_reusable_tooling`), record why in the plan and
`journey_settings.tooling_choice`, and state its reuse whenever new tooling is
chosen (avoid building general tooling for one-off operational work). Preserve
registered IDs and definitions, published-standard clauses, trust boundaries, and recovery.
Copy the confirmed quantity-definitions table into the glossary verbatim (`references/artifact-grammar.md`).
Allocate requirements to components from the placement receipt per `references/allocation-inputs.md`.
Author the OOPDSA Implementation Design section per `references/oopdsa-design.md`; plan programs per `references/program-planning.md`.
Do not draft a duplicate requirements register or SEIT.
3. Build coherent bounded slices and dependency-based waves with exact write sets,
real `inputs`, held `resource` (host, repository, or worktree when exclusive), acceptance, commands, shared resources, and serialization reasons. Tests meet
`../test-engineer/references/shared-machine-tests.md`; engine-backed cases carry
`resource_group`/`expected_gate_seconds`, waves `added_gate_seconds`/`resource_groups`.
Prioritize prerequisite work and parallel ready work; avoid overloaded batches and false serial chains between slices that share no input or resource (`plan-package.cjs` flags them at assembly without refusing the freeze).
Make the first implementation slice a preflight slice that runs every planned command in dry-run or `--version` form on every target host in parallel; any phase that builds a host ends by running that repository's real gate on it. When work crosses a target host, state in the plan and `handoff.md` how the exact candidate and its proof travel to the target host, who may approve that transport (owner or explicit delegate within `authority.json`), and what may land locally when the host gate cannot run.
4. Assemble `implementation.json` and the DoD Manifest (one plan per phase). Copy specialist-owned
decisions faithfully per `../bearing-lite/references/planning-assembly.md`;
choose no new roles or capability defaults. Record `planning_wave` (`required_sessions`, `review_requested`); append post-approval corrections to `planning_corrections` without mutating round 1.
5. Check your own final package: run the repository gate once at assembly
alongside the register precheck at its final stage with `--seit`, every
pending binding completed, and `plan-package.cjs draft` (planning specialists
run only their own artifact checker, never the repository gate). Record
evidence as digests, commands, and exit codes, not narrative logs. Repair
your owned artifacts in-session and rerun affected checks. Under the zero
author-known relaunch budget (`0` relaunches), apply purely mechanical ID and
hash binding fixes in-session and record each edit in an edit record (`planning_wave.edit_records[]`
with `path`, `kind`: `"hash_binding"` | `"id_binding"`, `field`, `before`,
`after`, `before_sha256`, `after_sha256`, `reason`) so adopted specialist
returns remain valid across those mechanical binding refreshes while any change
of meaning to a consumed input still blocks adoption; never
rewrite meaning silently—any change of meaning returns to the owning author
(`mbse` or `integration_test`, including a meaning defect found at assembly)
under the **one closing return** authorized by the Planning Orchestrator (the
same closing return path used for a `GAPS` return, resuming the author's own
session once—which does not count as a relaunch—recorded with `author`,
`reason`, `items`, `candidate`, and resulting `READY`), and missing
specialist facts stay gaps returned to their owner, never authored by the
Orchestrator itself. When a specialist's own artifacts are complete and its
open items are externally owned, accept `CANDIDATE_READY` with
`external_open_items` (which spends no closing return) and close or route
each listed external item so its declared owner closes it before planning
review or final freeze. Author returns check only each author's own and
upstream authored artifacts and do not depend on generated
`implementation.json`; follow the planning return order: Orchestrator inputs,
then `integration_test`, then verify-only `mbse`, then regeneration of
`implementation.json` (and if any verify-only author return explicitly reads
`implementation.json`, regenerate `implementation.json` first so it never
reads a stale copy).
6. Requested planning review opens only after `hooks/planning-review.cjs`
`evaluatePlanningReview()` passes its guards (`manifest_not_generated` without
the rendered Manifest). Then obtain one integrated owner confirmation (never
insert a profile or route pause), run the final freeze, write the handoff,
and recommend a new Implementation Orchestrator session.
## Return and recovery
Return `READY`, `REROUTE_SCOPE_DEFINITION`, `WAITING_ON`, or
`OWNER_DECISION_REQUIRED` with candidate, paths, checks (digests, commands, and
exit codes, not narrative logs), open items, and next
action. Every packet dispatched carries a time target and "at the limit, return
what you have and list the gaps". An authorized named delta packet applies named findings only, through
`references/correction-loop.md` and `hooks/correction-delta.cjs`, within its
existing authority and allowance; specialist-owned rows return to their author,
and delta packets let the author fix its own defects found in the delta (never
forbid self-repair with "nothing else changed").
This controller author check is not independent review or an extra agent pass.