name: release-readiness
description: Go / no-go gate before any deployment. Checks failure modes, rollback plan, cost, production bar, and definition of done. Trigger before releasing to any environment that carries real consequences.
---
# Release Readiness
> **A working demo is not evidence of production readiness. Production readiness is proven through sustained operation, incident handling, cost predictability, and controlled evolution.**
This skill enforces the production bar. It produces a go / no-go verdict with a signed checklist. No checklist = no go.
## When to use
- Before deploying to staging or production
- Before handing a system to another team
- Before declaring a sprint or milestone complete
- When someone says "it works on my machine"
## Procedure
1. **Validate the definition of done** — confirm that acceptance criteria from the spec are met. "Looks good" is not a criterion. Run the actual validation commands.
- 2. **Check all quality gates pass**:
+ 2. **Check all quality gates pass** under the approved release ADR and profile.
+ Require candidate/artifact-bound receipts from the declared executor; a hosted CI
+ outage never permits silently dropping a gate. Run the
+ [release structural preflight](../operating-model-bootstrap/references/release-contract.md)
+ after the artifact exists and before promotion, then independently verify its
+ receipts. Structural PASS neither authenticates approvals nor proves test outcomes.
+ The commands below are defaults; use the project's declared equivalents:
- `make lint` — style and static analysis clean
- `make typecheck` — no type errors
- `make test` — unit tests green
- `make e2e` — end-to-end tests green (or equivalent for your stack)
- No outstanding HIGH or CRITICAL findings from security scan
3. **Name the failure modes** — at minimum:
- What happens if the service is unavailable?
- What happens under unexpected load?
- What happens if a dependency (external API, database, queue) is degraded?
- What is the data-loss risk?
4. **Confirm rollback exists and is tested** — a rollback plan that has never been tested is not a rollback plan. If the rollback has not been exercised, flag it.
5. **Estimate cost impact** — LLM calls, storage writes, egress, third-party API calls. Any unbounded cost vector must be capped or accepted explicitly.
6. **Confirm monitoring and alerting** — what fires when this breaks? Who gets the alert? What is the on-call runbook?
7. **Check data boundaries** — does the release touch PII, regulated data, or cross a tenant boundary? If yes, confirm the appropriate controls are in place.
8. **Sign off** — record: who reviewed, what was checked, what was accepted as known risk, and the go/no-go verdict.
## Outputs
- Signed release checklist (append to PR or release doc)
- Go / no-go verdict
- List of accepted known risks with named owners
## Guardrails
- **No go without a rollback plan.** "We'll figure it out" is not a rollback.
- - **Green CI is necessary, not sufficient.** CI validates happy paths. Release readiness validates failure modes.
+ - **Passing declared gates is necessary, not sufficient.** Release readiness also
+ checks failure modes, authority, artifact identity and observation in either mode.
- **Cost estimates are not optional.** An unbounded LLM call in a hot path is a production incident waiting to happen.
- **Monitoring must exist before go-live, not after.** "We'll add monitoring later" means the first incident is invisible.
## Anti-rationalization table
| Excuse | Counter |
|---|---|
| "CI is green, we're good to go" | CI checks known paths. Release readiness checks failure modes CI doesn't cover. |
| "We'll monitor it after launch" | The first failure will be invisible. Add monitoring before go-live. |
| "Rollback is just redeploy the previous version" | Untested. Run the rollback in staging first. |
| "Cost is fine, it's low traffic" | Low traffic + an LLM loop bug = runaway spend. Cap it. |