workflow-launch-ready · git:20260821.2a41031 · 2026-08-21 · sha256 2aa192051155eb87
workflow-launch-ready git:20260821.2a41031A
Immutable. This exact content never changes and is served at /api/v1/blob/2aa192051155eb87.
--- name: workflow-launch-ready description: > Full launch preparation sweep for a new app or major release. Use when "prepare for launch", "launch week", "everything before going live", "is the app launch-ready?", "pre-launch sweep", or "ship it to the world". Local working-tree PR prep → workflow-release-prep. license: MIT --- # workflow-launch-ready — Full Launch Preparation **Degree of freedom: MIXED.** Skip/condition judgment `[HIGH freedom]`; sweep order and quality-gate NO-GO block `[LOW freedom — run exactly]`. The pre-launch sequence. Run once, get the complete picture across SEO, PWA, performance, quality, and post-launch monitoring. Local dirty-tree → merge-ready PR is **`workflow-release-prep`**, not this. ## How to reason 1. **Scope** — new app / major release, not a dirty-tree PR 2. **Sweep** — which steps apply; which are honest skips 3. **Verdict** — LAUNCH-READY / WITH CONDITIONS / NOT READY 4. **Handoff** — day-1 loop scheduled; blockers named ## Worked example > **Scope:** first public launch of a Next.js + Supabase app; single locale; PWA wanted. > **Sweep:** SEO + PWA + bundle + quality-gate; skip i18n with a note. > **Verdict:** NOT READY — quality-gate NO-GO on missing RLS on `profiles`. > **Handoff:** fix RLS, re-run Gate 2, then `deploy-verify`; do not treat this as `workflow-release-prep`. ## Self-critique before reporting - **Not a PR-prep** — local dirty tree was not routed here - **Skips named** — PWA/i18n skipped only when inapplicable, in the table - **NO-GO blocks launch** — quality-gate NO-GO is NOT READY, not "with conditions" - **Right owner** — merge-ready PR → `workflow-release-prep`; npm package → `deploy-npm` --- ## Sweep sequence [LOW freedom — run exactly] ``` 1. SEO → enhance-web-seo (meta, OG, JSON-LD, sitemap, canonicals) 2. PWA → enhance-pwa (manifest, service worker, offline, install) 3. BUNDLE → audit-bundle-size (first-load JS ≤ 200 KB goal) 4. i18n → audit-i18n (if multi-locale: natural copy, no hardcoded strings) 5. QUALITY GATE → workflow-quality-gate (red-team + security + perf + unit tests) 6. DEPLOY → deploy-verify (post-deploy smoke after the release) 7. ITERATE → iterate-post-launch (close loop on day-1 production signals) ``` Skip steps 2 (PWA) and 4 (i18n) if not applicable — note the skip in the checklist. --- ## Step 1: SEO (read enhance-web-seo) [HIGH freedom] > Read the `enhance-web-seo` skill and follow it. Every public page needs: `<title>`, `meta description`, OG tags, canonical URL, structured data (JSON-LD), and a sitemap entry. --- ## Step 2: PWA (read enhance-pwa) [HIGH freedom] > Read the `enhance-pwa` skill and follow it. Required: Web App Manifest + service worker with offline fallback. Lighthouse PWA score ≥ 90 before launch. --- ## Step 3: Bundle size (read audit-bundle-size) [HIGH freedom] > Read the `audit-bundle-size` skill and follow it. Target: first-load JS ≤ 200 KB gzip. All routes lazy-loaded. --- ## Step 4: i18n (read audit-i18n — skip if single locale) [HIGH freedom] > Read the `audit-i18n` skill and follow it. Priority: no hardcoded user-facing strings, natural copy in all supported locales, correct date/number/currency formatting. --- ## Step 5: Quality gate (read workflow-quality-gate) [LOW freedom — hand off] > Read the `workflow-quality-gate` skill and follow it. This step runs test-red-team, audit-security, audit-performance, and test-unit internally. A NO-GO verdict from this step blocks launch. --- ## Step 6: Deploy & smoke (read deploy-verify) [LOW freedom — hand off] > Read the `deploy-verify` skill and follow it. Run immediately after the production deploy. Confirm no new Sentry errors, schema is healthy, and critical flows work. --- ## Step 7: Day-1 iteration loop (read iterate-post-launch) [LOW freedom — hand off] > Read the `iterate-post-launch` skill and follow it. Schedule this 24–48 hours after launch. Pull first real-user signals and prioritize the first fix pass. --- ## Launch checklist output [LOW freedom — run exactly] ```markdown ## Launch Readiness — [App] — [Date] ### Verdict: LAUNCH-READY / LAUNCH WITH CONDITIONS / NOT READY | Step | Status | Open items | |------|--------|------------| | SEO | ✅ / ⚠️ / ❌ | [list] | | PWA | ✅ / ⚠️ / ❌ / skipped | [list] | | Bundle size | ✅ / ⚠️ / ❌ | [X KB] | | i18n | ✅ / ⚠️ / skipped | [list] | | Quality gate | GO / NO-GO / CONDITIONAL | [see gate report] | | Deploy smoke | ✅ / ❌ | [notes] | | Day-1 plan | scheduled / not yet | [date] | ### Blockers (must fix before launch) [list] ### Post-launch backlog (fix within 48 h) [list] ```