neqsim-plant-layout-geometry · v1.0.0 · 2026-10-26 · sha256 2072ebcca8395520
neqsim-plant-layout-geometry v1.0.0A
Immutable. This exact content never changes and is served at /api/v1/blob/2072ebcca8395520.
--- name: neqsim-plant-layout-geometry version: "1.0.0" description: "Build and verify physical equipment, maintenance and access envelopes for onshore plots and offshore decks, with source-qualified constraints and honest feasibility. USE WHEN: placing equipment, comparing plant arrangements, checking layout clashes/clearance, or reserving maintenance and escape space." last_verified: "2026-10-25" --- # Physical layout geometry and checks Use `layout_model` and `layout_engine` through the study workflow. Read [the capability guide](../../../docs/development/PLANT_LAYOUT_STUDY.md) before interpreting a result. ## Coordinate and geometry contract Metres internally; kilograms for mass. Keep origin, axes, north/heading and elevation datum explicit. CAD millimetre/metre transforms need an exchange check. The first profile uses rectangular plots/decks and orthogonal box/envelope geometry. Preserve fixed coordinates. Reject nonfinite/negative dimensions, inverted boxes, unknown tags/decks and duplicate IDs. Separate physical, operational, maintenance and lifting envelopes; an object's own envelope is not a self-clash. Independently check placement completeness, allowed deck/orientation, transformed physical bounds, deck boundaries/height, 3D physical/obstacle clashes, maintenance space, reserved escape corridors, supplied mass limits and source-qualified separation rules. Inspect exact messages and units; a solver status does not replace independent checks. Route connectivity requires geometric corridor evidence and known exits. It does not prove escape capacity, travel-time adequacy or independence from common fire/gas exposure. Keep those requirements as specialist evidence gaps. ## Onshore profile Include land/battery limits, roads/fire access, occupied buildings, wind, drainage/flooding, tanks/containment, pipe racks, utilities, flare/vent exposure, construction transport, expansion and protected brownfield geometry. The box profile does not solve terrain, drainage, firewater coverage or consequence calculations; retain source-backed constraints or specialist handoffs for those matters. ## Offshore profile Include decks/modules, structural interfaces, wellbay/risers, accommodation/refuge, lifesaving access, ventilation and congestion, cranes/laydown/removal, dropped objects and fire/blast divisions. Require dry, operating and test mass/CoG cases plus construction/maintenance cases where relevant. A supplied deck mass limit is not a structural assessment. Floating facilities also require hull, heading, turret/mooring/riser, motion/drainage and stability interfaces. Do not apply fixed-platform qualification to an FPSO automatically. ## Requirements and optimization Standard-derived numbers require inspected text, document/edition/clause, applicability and an executable check with evidence. Source access metadata alone leaves the requirement NOT_EVALUATED. Approved project screening assumptions are identified separately. Do not import illustrative distances from issue discussions as normative requirements. Distinguish hazardous-area classification under IEC 60079-10-1 from major-accident consequence/QRA assessments. Feasibility precedes cost/length scoring. Never soften a required safety constraint into a weighted penalty. Record backend, seed, grid, candidate/runtime limits and solver status; bounded search does not establish global optimality. Use deliberate collision, maintenance, blocked-corridor, missing-evidence and rotation fixtures from the regression suite. Unsupported irregular geometry, detailed piping/stress, hazard contours, structures and marine engineering need qualified adapters and evidence before their checks can pass.