name: audit-before-you-build
description: >
Use as the FIRST step of any implementation task handed to you from a
checklist, ticket, milestone, or spec — the first step is an existence
check, not a design. Trackers record conversations, not deliverables, so
grep for the item's key nouns and cross-check spec status before writing
code, then pivot "build X" to "verify X and close the gaps" when it already
exists. Triggers on "implement this ticket", "build feature X", "next
milestone item", "from the checklist", "start this task", "add X".
---
# Audit Before You Build
**Type:** Open-source — client-agnostic methodology, no project-specific detail.
**Created by akbarsha — https://github.com/iamakbarsha1**
Distilled from cases where a checklist item was already ~90% shipped as a side
effect, and where "all issues closed" hid whole unbuilt layers — building from
the tracker text would have duplicated working code or missed real gaps.
**Licence:** Released under CC BY 4.0 — share and adapt for any purpose with
credit. Full text: `LICENSE` at the repository root.
**Feedback & Support:** If a rule here proves wrong or needs sharpening,
open an issue on the repository or contact the author at the profile link
above. If the problem is the agent not following a rule below rather than
the rule itself, that's an execution failure — acknowledge and correct it.
## The core rule
A ticket, checklist, or spec line records a conversation about intent — it is
not a reliable record of what has or hasn't been built. Code drifts from the
tracker in both directions: features ship as side effects of other work
without their item being ticked, and closed items leave real layers unbuilt.
So the first step of "build X" is never design — it's an existence check. Grep
the codebase for the item's key nouns, cross-check the spec's own status
markers, and only then decide whether the task is "build", "finish", or
"verify and close".
This is an existence check on the deliverable inside your own codebase; a
viability check on an external tool that must run on a host failing one of its
declared constraints is a different first step — use
`third-party-tool-onboarding`.
This also audits code against a task handed to you; auditing an existing whole
configuration against an external write-up — a per-surface
COVERED/PARTIAL/MISSING delta — is `harness-config-audit`.
## When this fires
**Where:** The first move on any implementation task handed over as a ticket,
checklist line, milestone item, or spec row — before any design work, and
before the first new file exists.
**The case this came from.** A milestone item turned out to be roughly 90%
implemented already, as a side effect of an earlier change. Grepping the
feature's route name surfaced it immediately and turned "build" into a small
gap-closing task — but only because the grep came before the design. The
tracker still had the item open, and said nothing about the code.
**Another shape it takes.** *(Illustrative: A sprint item reads "add
pagination to the orders list". The endpoint already accepts `limit` and
`cursor`, added months earlier for an internal tool and never documented, so
the real work was wiring the UI — instead a second, incompatible page-number
scheme lands in the same handler and both are maintained for a year.)*
## Checks
- **Grep for the item's key nouns before designing.** Take the concrete terms
from the task — paths, function names, table/column names, endpoint routes,
spec keywords — and grep for each. Existing hits mean the work is partly or
wholly done. *(A milestone item was ~90% already implemented as a side
effect of an earlier change; grepping the feature's route name surfaced it
immediately, turning a "build" into a small gap-closing task.)*
- **Cross-check the tracker against code and spec status, both ways.** "Closed"
does not mean "built" and "open" does not mean "absent". Read the spec's own
Status headers and the code stubs together. *(Illustrative: An "all issues closed"
milestone hid two entire layers that were never implemented — the tracker
said done, the code said empty.)*
- **Pivot the verb when reality disagrees.** If the audit shows the thing
exists, restate the task honestly — "verify the existing X and close gaps A
and B" instead of "build X" — and say so before writing code. Duplicating
working code is worse than a slow start. *(Illustrative: A ticket read "build the CSV
export endpoint"; the audit found a working export handler behind a feature
flag, so the task was restated as "flip the flag and add the missing
filename sanitization" before any code was written.)*
## Pre-flight check — before you write implementation code from a task
- [ ] You grepped the codebase for the task's key nouns (paths, names, spec
terms) and know what already exists.
- [ ] You cross-checked tracker status against actual code AND spec status
markers, not just the ticket text.
- [ ] If the thing partly exists, you restated the task as verify/finish and
said so before building.
If any box is unchecked, you're building on the tracker's word — go audit the
code first.