git:20260610.77382aa to git:20260616.d9a9282

6 added, 30 removed. Audit A to A.

---
name: writing-plans
description: The spec-to-plan bridge. Routed to by /feature once the brainstormed spec is approved, and by /sprint before execution. Decomposes the spec into 2–5 minute tasks, each carrying its exact file path(s) and a concrete verification step that maps to a tdd obligation. Writes the plan to .codearbiter/plans/<slug>.md, ordered with dependencies flagged and an MVP slice identifiable. Nothing executes until every task has a path and a verification and the task set covers every acceptance criterion.
---
# writing-plans
Turn an approved spec into an executable plan. Routed to by `/feature` (after spec approval) and `/sprint`.
## Pre-flight
Read these, or STOP and surface the gap — never plan against an unapproved or missing spec:
- `${CLAUDE_PROJECT_DIR}/.codearbiter/specs/<slug>.md` — the approved brainstorming spec. The single source of acceptance criteria. Absent or unapproved → STOP and route back to `/feature`.
- `${CLAUDE_PROJECT_DIR}/.codearbiter/CONTEXT.md` — the `stage:` frontmatter (the maturity value) and project context.
- `${CLAUDE_PROJECT_DIR}/.codearbiter/tech-stack.md` — file layout, build/test/lint invocations. A verification step cites a real command from here, never a guess.
- `${CLAUDE_PROJECT_DIR}/.codearbiter/coding-standards.md` — structure and naming, so a task names the right path.
**If `--farm` was requested:** check that `FARM_API_KEY` is set in the environment (or `.env` at `${CLAUDE_PLUGIN_ROOT}/tools/.env`). If absent, BLOCK immediately — cite `${CLAUDE_PLUGIN_ROOT}/includes/farm.md` for setup instructions. Do not proceed; the farm dispatcher cannot run without an API key. Model selection happens later (at dispatch time in `subagent-driven-development`), so no model research is needed here.
## Phase 1 — Criterion extraction · gate: BLOCK
Lift every acceptance criterion from the spec verbatim and assign each a stable ID (`AC-01`,
`AC-02`, …). This list is the coverage ledger for the whole plan — Phase 4 checks the task set
against it.
A criterion the spec leaves ambiguous is a `[CONFIRM-NN]` against
`${CLAUDE_PROJECT_DIR}/.codearbiter/open-questions.md` — surface it, do not invent the intent.
Gate: every acceptance criterion in the spec captured as a numbered `AC-NN`. A partial ledger does
not pass.
## Phase 2 — Task decomposition · gate: BLOCK
Break the work into the smallest honest units. Each **task** is ~2–5 minutes of work and carries:
- **id** — `T-01`, `T-02`, … stable.
- **path(s)** — the exact file(s) the task touches, resolved against `coding-standards.md`. "Some files" is not a path.
- **verification** — one concrete command or observable that proves the task done (e.g., `<test cmd> -k test_token_expiry passes`, `endpoint returns 401 on missing header`). It cites a real `tech-stack.md` invocation or a directly observable behavior — never "looks right".
- **maps-to** — the `tdd` obligation this verification corresponds to. The verification *maps to* a tdd obligation; it does NOT replace tdd's own gates. `tdd` Phase 1 still derives and Phase 4 still verifies obligations against passing tests.
- **covers** — the `AC-NN`(s) this task advances.
Split anything that won't fit ~5 minutes or touches unrelated paths. Reject the trap of one
monolithic "implement the feature" task — that defeats the plan.
Gate: every task has at least one path AND a verification AND a `maps-to`. A task missing any of the
three blocks the plan.
## Phase 3 — Order & MVP slice · gate: BLOCK
Order tasks so each runs only after what it depends on. Flag every dependency explicitly
(`T-07 depends on T-03`). A cycle is a decomposition error — return to Phase 2 and split.
Group the ordered tasks so the **MVP slice** is identifiable: the minimal contiguous task set that
satisfies the spec's core acceptance criteria and is shippable on its own. Everything past the slice
is incremental.
Gate: a complete dependency order with no cycle, and an explicitly marked MVP slice.
## Phase 4 — Coverage proof & write · gate: BLOCK
Cross the ledger against the task set, both directions:
- Every `AC-NN` is covered by at least one task's `covers`. An uncovered criterion blocks — author the missing task.
- Every task advances at least one `AC-NN`. A task that covers nothing is scope creep — cut it or surface it.
Then write the plan to `${CLAUDE_PROJECT_DIR}/.codearbiter/plans/<slug>.md` — `<slug>` matching the
spec — with the `AC-NN` ledger, the ordered task table (id · path(s) · verification · maps-to ·
covers · depends-on · **status**, initialized `PENDING`), the marked MVP slice, and any out-of-scope
item tagged inline `[NEEDS-TRIAGE]`.
The status column is the pipeline's resume ledger: `subagent-driven-development` flips a task to
`ACCEPTED` the moment it accepts it, so an interrupted run (crash, compaction, closed session) is
re-entered by `/feature` at the first non-`ACCEPTED` task instead of restarted from brainstorming.
Gate: bijective coverage proven — no criterion without a task, no task without a criterion — and the
plan written to disk. This clears the path to execution: `executing-plans` (checkpointed, via
`/feature`) or `subagent-driven-development` (autonomous, via `/sprint`) — each routes every task
through `tdd`. The plan never hands off to `tdd` directly.
### Phase 4-farm extension (only when `--farm` was requested)
- After the bijective coverage gate passes and the `.md` plan is written, produce the machine artifact
- the farm dispatcher needs — **one MVP slice at a time, not the whole plan up front.** Front-loading
- every failing test for the entire plan would be the waterfall this skill otherwise rejects (Phase 3),
- and it maximizes the cost of a mid-flight spec change. So the farm artifact is scoped to the **current
- slice** (the MVP slice on the first pass; the next contiguous group on later passes). For each task in
- the current slice, in dependency order:
-
- 1. Route through `tdd` Phase 1 (derive obligations) + Phase 2 (write the failing test). The test file
- must exist on disk and fail before continuing. Record the test file path for this task.
- 2. Confirm the test is actually failing (run the gate command from `tech-stack.md`; it must exit non-zero).
- A test that passes before implementation means the obligation is wrong — STOP and revisit Phase 2.
-
- Then write `${CLAUDE_PROJECT_DIR}/.codearbiter/plans/<slug>.plan.json` (the current slice's tasks only)
- conforming to `${CLAUDE_PLUGIN_ROOT}/tools/plan.schema.json`:
-
- - `meta.name` ← slug
- - `meta.repo` ← project name from CONTEXT.md
- - `meta.model` and `meta.apiBaseUrl` — **leave unset**. These are written by `subagent-driven-development`'s model research step at dispatch time. Writing them here would bake in a potentially stale selection.
- - Per task: `id` ← T-NN (normalized to kebab-case), `description` ← task description,
- `filesInScope` ← path(s) from the task table, `test.path` ← the failing test written above,
- `gate.commands` ← verification command from task table plus full-suite and lint/typecheck from
- `tech-stack.md`, `deps` ← dependency ids (empty array if none), `context` ← a minimal slice of
- relevant types/interfaces (omit if the test file plus task description is self-contained), `maxRetries` ← omit to use the farm default.
- - **`gate.commands[0]` MUST be the task's narrow behavioral test** (the command that runs just
- `test.path`), with the full suite and lint/typecheck following. The farm's mutation guard re-runs
- `gate.commands[0]` per mutant; if the first command were the full suite, mutation testing would be
- prohibitively slow.
-
- Validate the JSON against the schema before writing (load the schema from `${CLAUDE_PLUGIN_ROOT}/tools/plan.schema.json` and check). A schema-invalid plan BLOCKS.
+ When `--farm` was requested, after the bijective coverage gate passes and the `.md` plan is written,
+ produce the farm artifact (`plan.json`) — **one MVP slice at a time** — per
+ `${CLAUDE_PLUGIN_ROOT}/skills/writing-plans/references/farm-plan.md`. Load that leaf and follow it;
+ it owns the per-task failing-test + schema-valid `plan.json` procedure.
- Gate: all failing tests written and confirmed failing; `plan.json` written and schema-valid. Both artifacts exist before handing off to `subagent-driven-development`.
+ Gate: all failing tests written and confirmed failing; `plan.json` written and schema-valid. Both
+ artifacts exist before handing off to `subagent-driven-development`.
## Hard rules
- MUST NOT plan against an absent or unapproved spec — STOP and route back to `/feature`.
- MUST NOT emit a task without an exact path AND a concrete verification step.
- MUST NOT let a task's verification stand in for a `tdd` gate — it maps to a tdd obligation, it does not replace one.
- MUST NOT write the plan while any acceptance criterion is uncovered or any task covers nothing.
- MUST NOT guess a verification command — cite `tech-stack.md` or STOP.
- MUST NOT resolve an ambiguous criterion by guessing — raise a `[CONFIRM-NN]`.
- MUST NOT emit `plan.json` in `--farm` mode without writing and confirming each failing test first.
- MUST NOT set `meta.model` or `meta.apiBaseUrl` in `plan.json` — these belong to the dispatch step.
- MUST NOT proceed with `--farm` if `FARM_API_KEY` is absent — cite `${CLAUDE_PLUGIN_ROOT}/includes/farm.md` and BLOCK.