do-it-now · git:20260912.5c5b759 · 2026-09-12 · sha256 4d652ef2694020ad
do-it-now git:20260912.5c5b759A
Immutable. This exact content is served forever at /api/v1/blob/4d652ef2694020ad.
--- name: do-it-now description: 'Use when the user says do it now, ship it now, no phases, or finish it now, or would defer work to phases, rollouts, follow-up PRs, or TODOs. Not for remote, credential, publish, deploy, or irreversible changes.' --- # Do it now ## Contract | Field | Bound contract | |---|---| | Trigger | The user says do it now, ship it now, no phases, or finish it now, or the work would otherwise be split into phases, staged rollouts, follow-up PRs, or TODO-later remainders. | | Authority | Reversible local: write only the named local implementation artifacts that the ask puts in scope. Rollback is reverting this single change. | | Side effect | All in-scope implementation paths are written in one change. The change produces no TODO, stub, placeholder, NotImplemented, or follow-up remainder. | | Done | Every in-scope path is implemented in one change, and anything dropped is named in one line with its reason. | ## Inputs - The ask (required): the work to ship, including every path it puts in scope. - A phased skill or plan in play (optional): when present, its steps are collapsed into this single pass rather than executed across phases. ## Procedure 1. Execute the whole ask in one pass. No phase 1 and phase 2, no staged rollout, and no follow-up PR for work already in scope. **Done when:** the whole ask is executed in one pass. 2. Finish every opened path. Write the real implementation instead of leaving a TODO, stub, placeholder, or raised NotImplemented. **Done when:** every opened path has a real implementation. 3. When a phased skill or plan is in play, collapse it to one pass: run its steps back to back in this change and ship the result. While this posture is active it takes precedence over phase-based execution. **Done when:** any phased plan is collapsed into this change. 4. When the ask genuinely exceeds one pass, cut scope instead of deferring it. Name what was cut and why; never hand back a remainder. **Done when:** scope that cannot fit is cut and named rather than deferred. 5. Report only what shipped. Done names the code that is in the tree right now. **Done when:** the report names only code present in the tree. ## Failure and recovery - Unshipped remainder: a TODO, stub, placeholder, NotImplemented, or phase-2/later/follow-up label is unshipped work. Recover by writing the real implementation; if that is genuinely impossible in one pass, cut scope out loud in one line rather than carry pending work. - Scope exceeds one pass: cut scope, name what was cut and why in one line, and ship the reduced scope. Never return a deferred remainder or pretend the done predicate holds. - Partial result: nothing is labeled done until every in-scope path is implemented. A partial change is not done and is not reported as done. ## Output The complete change with every in-scope path implemented, plus one line naming anything cut and why if scope was reduced.