name: initiative-breakdown
description: Cut an initiative, an idea bigger than one PRD — a brief, a context package, a pile of design notes, or a draft PRD that outgrew itself — into an ordered list of right-sized planned PRDs, each one finishing with something that can be promoted to production. Consolidates the input documents (whatever they are called) into one initiative brief that stays whole, renames and moves it to docs/initiatives/{name}/, writes beside it the initiative's PRD list (the ordered list people read) and the PRD contracts (each PRD's scope, owned contracts and seams, for the sessions that write and design the PRDs), and hands off to prd-writing-standards for the first planned PRD. Decides the cut itself and does not stop to ask. Does not write PRDs, technical designs, or phase documents. The planning step above phase-split. Use when the user says "this is too big for one PRD", "break this into PRDs", "break down this initiative", or hands over a large brief to turn into requirements.
user-invocable: true
---
# Initiative Breakdown
Take an idea too big for one PRD, an **initiative**, and cut it into an ordered list of **planned PRDs**, each PRD-sized: not the whole application and not one small thing, but a medium body of work that ends with something finished that can be promoted to production. Write the cut down as the initiative's **PRD list** beside the **initiative brief** it was cut from, then hand off so the first planned PRD gets written with `prd-writing-standards`.
This skill owns three things:
1. **The PRD-sized test** — deciding whether an idea is one PRD or several.
2. **The cut** — finding the seams, ordering the planned PRDs, and writing the PRD list.
3. **The initiative brief, PRD list and PRD contracts naming and layout** — what the three documents (and the optional coverage matrix) are called, where they live, and how an input with any name becomes the initiative brief.
**Terminology note:** An initiative is a known, decided body of work too big for one PRD, not a long-term theme; the looser plan that several initiatives might come from is a roadmap, which this method does not plan. In agile terms, a planned PRD is an epic (a medium body of work) and its phases (`phase-split`) are stories, sized for one AI session instead of a sprint.
It sits one level above `phase-split` and works the same way: `phase-split` cuts one PRD into session-sized phases and never implements; this skill cuts one idea into PRD-sized pieces and never writes a PRD. **It does not stop to ask whether to cut, or how.** It decides, declares the cut, writes the documents, and hands off. The review point is the handoff: the user reads the PRD list before pasting the prompt that writes the first PRD, and a redirect costs a few minutes of rewriting markdown, or one commit to revert.
---
## Why This Exists
Written as one PRD, a big idea produces a plan of 50 to 100 phases, one technical design that has to decide everything before anything ships (the methodology allows exactly one per PRD), and months of building before anything reaches production.
`phase-split` cannot fix this after the fact. It runs on a PRD that is already settled, and it treats reopening a settled PRD as a last resort. The cut has to happen before the PRD is written.
---
## When to Use
- A brief, context package, or set of design notes describes more than one PRD's worth of work, and the user wants to turn it into requirements.
- `prd-writing-standards`' size check tripped, before or during drafting (see "Before You Write: Is This One PRD?" there).
- The user asks to break a large idea into PRDs, or to revise an existing initiative.
**Do NOT use when:**
- The idea passes the PRD-sized test as a whole. Write one PRD with `prd-writing-standards`, and say so in one line.
- The PRD is settled and implementation has started. Cutting it into phases is `phase-split`'s job; turning it into several PRDs is a scope decision the user makes, not this skill's.
- The work is a bounded change. That is a `docs/changes/` directory (`prd-writing-standards`).
---
## What This Skill Produces
```
docs/initiatives/{name}/
{name}-initiative-brief.md ← the whole idea: what, why, every settled decision. Never split.
{name}-initiative-prds.md ← for people: the ordered list of planned PRDs — tables, nothing else
{name}-prd-contracts.md ← for the sessions that write and design the PRDs: scope entries, owned contracts, question assignments, seams
{name}-coverage-matrix.md ← when the input has many discrete items: each one mapped to exactly one planned PRD (Step 4)
docs/prds/{name}-{short-name}/ ← NOT created here; created when that planned PRD is written
```
Worked example: `docs/initiatives/acme-cloud/acme-cloud-initiative-brief.md` and `acme-cloud-initiative-prds.md`, with planned PRDs whose directories will be `docs/prds/acme-cloud-ingestion/`, `docs/prds/acme-cloud-hosted-reporting/`, and so on. (The examples in this skill use that idea to show the formats; they are not a template for how any other idea should be cut.)
Hard rules about the output:
- **The initiative brief is not split.** There are no per-PRD briefs. The brief holds decisions that apply to every PRD (principles, invariants, privacy rules, data-model direction); splitting it copies them into every piece, where they drift, or orphans them. Scope entries point into it by section heading and never restate it. This is the same rule `phase-split` applies to a PRD.
- **No PRD is written, and no PRD directory is created.** A re-cut cuts an existing draft down to its new scope and writes nothing new ("Re-cutting a planned PRD"). Each planned PRD's scope entry names its future directory; `prd-writing-standards` creates it when that PRD is written. Writing the first PRD is a separate chat, started from this skill's handoff prompt.
- **No target dates, estimates, or owners.** The PRD list sets order, not a schedule; the `in production` stamp is its only date.
### The names
| Name | What it is | Filename |
|---|---|---|
| **Initiative brief** | The whole idea, consolidated from every input document. Stays whole and governs every PRD cut from it. | `{name}-initiative-brief.md` |
| **Initiative PRDs** (the PRD list) | The initiative brief cut into an ordered list of planned PRDs, written for people: order, priority groups, what each delivers, dependencies, status. | `{name}-initiative-prds.md` |
| **PRD contracts** | What the PRDs owe each other, written for the sessions that write, refine and design them: each planned PRD's scope until it is written, the contracts each PRD owns, which open questions each settles, and the seams. | `{name}-prd-contracts.md` |
| **Coverage matrix** | Optional: each discrete input item mapped to one planned PRD, deferred, out of scope, or an open question. | `{name}-coverage-matrix.md` |
| **Planned PRD** | One row in the PRD list, with a scope entry in the PRD contracts: a right-sized PRD not yet written. Once written, it is simply a PRD. | becomes `docs/prds/{name}-{short-name}/` |
- **`{name}`** is a short kebab-case name for the thing being built, never for the document type: `acme-cloud`, not `product-brief` or `context-package`.
- **Planned PRDs have names, not numbers.** The order can change, and a numbered id would have to be renumbered. The PRD list's table owns the order. The PRD directory is `{name}-{short-name}`, where short-name is the planned PRD's name in kebab case, every word kept except a leading word the initiative's name already ends with (Hosted Reporting gives `hosted-reporting`; Cloud Ingestion in `acme-cloud` gives `acme-cloud-ingestion`), so the directories group together in a listing and someone who knows a PRD's name finds its directory. A shortened short-name (`notifications` for Order Notifications) sends people looking in the wrong place. Name each planned PRD with the title its PRD will carry, qualifiers included, so its directory never has to change. In prose and commit messages, when the position matters, write it out: "Cloud Ingestion PRD, first in the Acme Cloud initiative". Never a bare "PRD 2".
- **Never call a planned PRD a phase, stage, release, milestone, track, or MVP.** "Phase" belongs to `phase-split`; "track" already means something else in these skills (`continuation-prompt`); "release" means putting something into production, which every PRD ends with; "MVP" fits only the first.
- **Titles match filenames.** H1s are `# {Title} Initiative Brief` and `# {Title} Initiative PRDs`, and each document's first line under the H1 links the other, so opening either one says how they relate. The PRD contracts is `# {Title} PRD Contracts` and a coverage matrix is `# {Title} Coverage Matrix`, each with a first line linking the PRD list.
- **An initiative laid out under the old names** (`docs/roadmaps/{name}/`, with `{name}-full-brief.md` and `{name}-prd-roadmap.md`, from when this skill was `prd-roadmap`) works the same. The next time this skill runs on it, `git mv` it to the names above, update the H1s, and fix every link into it, including each PRD's `**Roadmap:**` line, which becomes `**Initiative:**`.
---
## Process
### Step 1: Read Everything
Read every input document in full, then the documents they cite, then, when the idea rebuilds something already running, the live system. Each is handled differently:
- **Inputs** are what the user handed over for this idea: the main brief or notes, and any supplement or amendment written later for it. Supplements matter most. A later document that refines an earlier one ("additional context", "amendments") carries decisions the main document lacks. Inputs are merged into the initiative brief in Step 3.
- **Cited context** is everything else the inputs point to: a product overview, market research, terminology, the current system's PRD and technical design. Read it for understanding. It stays where it is and is linked from the initiative brief, never merged into it.
- **The live system**, when the idea rebuilds or changes something already running. A spec describes the target, not what production does today, and it rarely knows the other systems that touch the same records. Read what production actually does (its code on the production branch, not a development branch), and find every other job, service or tool that creates, changes or deletes the records the idea writes. Each live behavior the rebuild replaces, and each other writer, is input to the cut: record it in the initiative brief (Step 3), where it lands in a planned PRD, a seam, the deferred list, or the open questions. A missed one can force the cut to be redone: the PRD it belongs to turns out to cover a different workflow from the one the spec drew.
### Step 2: Confirm It Is More Than One PRD
Apply the PRD-sized test to the idea as a whole. A **right-sized PRD** passes all of these:
- **It ends in production.** When its last phase lands, something finished can be promoted to production and does something real for someone. That someone may be only the owner using it on real data; it does not have to be a public launch. What fails is an incomplete layer: "the backend", "the data model", "the infrastructure", a prototype nobody runs.
- **Its one technical design fits in a reviewer's head.** The design covers only what this PRD ships, and a reviewer can hold it in one read.
- **`phase-split` would cut it into a moderate number of phases** — see "PRD Size Calibration" below for the current band.
Then decide:
- **The whole idea passes** → it is one PRD. Say so in one line and hand off to `prd-writing-standards` with the input documents. No `docs/initiatives/` directory, no PRD list.
- **It fails** (typically on the first and third bullets together: many phases before anything is finished) → continue.
If genuinely unsure, cut. An initiative of two PRDs costs little; one PRD that runs for months before reaching production is the failure this skill exists to prevent.
**When the size band and "ends in production" pull against each other** — the smallest slice that anyone would use is well past the band — fall back in this order, the way `phase-split` falls back from shippable to verifiable:
1. **Look for a thinner outcome first**: one audience, one platform, the happy path, read before write.
2. **Accept a PRD that runs in production on real data even before anything reads it.** Capturing and durably storing the real data in production, with a way to prove it arrived, is a finished thing: it is live, and it stops losing data. That is different from the failure case.
3. **Never accept one that cannot run in production on its own**: a schema, a library nothing deploys, an API nothing calls, infrastructure with no workload.
### Step 3: Consolidate the Input Into the Initiative Brief
Users name their inputs anything ("Product Brief", "context package", `notes.md`, "additional context"), and often there are several. Produce exactly one initiative brief. Decide the renames yourself and state them in one line each; do not ask.
1. **Pick `{name}`** per "The names".
2. **Merge several inputs into one.** A supplement's findings go into the sections they amend, not onto the end as an appendix. Where a later document refines an earlier one, the later one wins; where two genuinely conflict and neither says which wins, keep both positions and add the conflict to the brief's open questions. Merging reorganizes; it does not drop decisions. Check at the end that every section of every supplement landed somewhere.
3. **Move and rename** to `docs/initiatives/{name}/{name}-initiative-brief.md`, in the repository that will hold the PRDs (for work spanning several repositories, the initiative's primary repository, or a dedicated product or project repository if one exists; see `prd-writing-standards`, "Cross-Repo Work"). Use `git mv` when the file is tracked or staged, so any history follows it. An input that was never committed has no history to keep; a plain move is fine.
4. **Remove the merged-in extras.** `git rm` when tracked. When a source is untracked, move it to the operating system's trash rather than deleting it, so it can be recovered.
5. **Clean up the wording**: set the H1 to `# {Title} Initiative Brief`; remove handoff language ("context package", "questions Codex should resolve", instructions addressed to one particular agent, a purpose statement that says the document will become "a PRD and a technical design"); and note every section that orders the work or addresses "the PRD" or "the technical design" in the singular, because Step 6 retargets them.
6. **Fix links, in both directions.** Rewrite the moved file's own relative links so they resolve from its new directory. Search the repository for the old filenames and update every inbound link. Add `docs/initiatives/` to any index of the repository's documentation layout (a README's layout list, for example), which a filename search will not find.
**Changes already staged when the skill starts.** An input often arrives in the same uncommitted change as edits made because of it: an index that now lists it, a feature list that now points at it. Those edits ride in this skill's commit, updated to the new paths, and the commit message names them. Changes staged for unrelated work are someone else's: leave them staged and untouched, stage only this skill's files beside them, and limit the commit to this skill's paths (`pre-commit-validation`).
**When the input is an oversized draft PRD** (the size check in `prd-writing-standards` tripped mid-draft): the draft becomes the initiative brief. Move it out of `docs/prds/`, and remove its now-empty PRD directory, since it was never one PRD. Its acceptance criteria stay in the brief as source material for the planned PRDs. This is for a draft that belongs to no initiative. A planned PRD that outgrows the band while it is being written is re-cut inside its own initiative instead ("Re-cutting a planned PRD", in Keeping the Initiative Current), never made a new one.
### Step 4: Find the Seams
The guiding principle is `phase-split`'s, one level up: **cut vertically.** Every planned PRD cuts through whatever layers it needs (desktop, backend, storage, interface) and finishes with something that can be promoted to production. A PRD that is one layer ("all the infrastructure", "the data model") ships nothing and cannot be judged on its own.
**Where good seams tend to be:**
- **Foundation inside the first PRD — a walking skeleton at PRD scale.** The first planned PRD brings into existence the part of the shared foundation its own outcome needs (typically the core data contracts, the identifiers they carry, and the tenancy boundary they sit inside) by using it for a real outcome, never as a foundation-only PRD. It does not pull in every foundational system the brief names: a user-facing sign-in, for example, arrives with the first PRD that exposes something to sign in to. Later PRDs extend what the first established.
- **Where the brief stops.** When the brief leaves later work to be decided from real use or the market, a PRD can end there, but what lies past it gets no planned PRD. It stays in the brief's deferred list or open questions until the brief settles it; then the user can add it by re-running this skill.
- **Hard gates.** Some things must be true before an audience can widen: automatic updates before software goes to outside users, account deletion before holding other people's data, authentication before anything is exposed. Put the gate in the PRD before the audience widens, not in a later one.
- **Audience and platform boundaries.** When the brief sequences audiences or platforms (solo users before teams, macOS before Windows), each widening is a natural seam.
- **Earliest real value first.** Order so that the first PRD puts something useful into production soonest. Among equally valid orders, put first the one that de-risks the biggest unknown. Among equally valid cuts, prefer the one with fewer dependencies between PRDs, so more of them can be built alongside each other.
**Rules for the cut:**
- **Every in-scope part of the brief lands in exactly one planned PRD.** What the brief deliberately defers, and any part it says too little about to size ("Enough detail to size, and no more"), goes to (or stays in) its deferred list and gets no PRD. Cross-cutting decisions (principles, invariants) stay in the brief and govern every PRD; they are not assigned. When the input has many discrete items (the owner's asks line by line, screens, endpoint groups, named tests), prove it rather than assert it: write `{name}-coverage-matrix.md` beside the PRD list, mapping each item to exactly one planned PRD, or to deferred, out of scope, or an open question by its label, with the reason. An item that maps nowhere is a gap in the cut. An item two entries both claim goes to the first planned PRD that needs it; the other lists it under **Depends on**, or in the Seams table when it crosses between them. The matrix proves coverage only, and it is the only coverage document: each PRD's review checks that its rows are covered, without writing a per-PRD trace (`autonomous-prd-refinement`). How many items a planned PRD holds says nothing about its size (see "PRD Size Calibration").
- **Size every planned PRD, not just the idea.** Apply the Step 2 test to each candidate and re-cut until every one passes, in both directions: a planned PRD that fails the band on the high side is two PRDs; one that would split into only a phase or two is too small and merges into a neighbor (or, if it genuinely stands alone and belongs outside this idea, leaves the initiative to become its own small PRD or change later).
- **The brief's own sequencing is input, not the answer.** Keep its order where it holds, and regroup where its units are layers or too small to reach production on their own. Several of a brief's "phases" often make one PRD.
- **Dependencies point backward.** A planned PRD depends only on PRDs earlier in the order, and a sequential walkthrough (build them one at a time, in order) must read as the natural way to build the thing at every step. The same two checks as `phase-split` Step 3.
- **Say what must come first, and say None in words.** Each entry's **Depends on:** line, and its row's Depends on column in the PRD list, names every earlier PRD, one or more, that must be done before this one can be built, or says `None; can be built at any point in the order.` It is never blank or left out. Once every PRD it names is done (in production), the order is priority, not a constraint: the PRD can be built before, after or alongside any other PRD whose dependencies are done. Whether they are done is checked, not looked up: when the user considers starting a PRD, check its Depends on PRDs against the code and production then. The Status column is a record and can lag.
- **Depends on gates building, not writing.** Any planned PRD can be written and refined at any time, alongside the others, and its technical design follows the designs of the PRDs on its **Depends on:** line (`technical-design-writing-standards`). Writing and designing every PRD before building any of them is normal.
- **Build the Seams table bottom-up, then compare.** Do not fill the Seams table only from the boundaries the cut drew. List every shared component, every shared backend foundation (stores, permissions, upload, messaging, configuration) and every handoff where one part of the input produces something another consumes, and give each to the first planned PRD that uses it. Every consumer then either ships after its producer or carries an interim rule saying what it does until the producer exists, written in its entry's **Depends on:** line ("None; can be built at any point in the order. Until Hosted Reporting ships, …"). With that rule it does not depend on the later PRD, so dependencies still point backward; the producer, whose switch-over changes the consumer, depends on it. A handoff whose producer ships later and has no interim rule is a dangling seam, and it surfaces mid-build as a blocked PRD. Compare that list with the Seams table: anything on the list the table lacks is a missing row.
- **Enough detail to size, and no more.** Every entry is specific enough that its PRD can be written without redoing the cut, and is sized against the band now, as one entry or more; none is left at "plausibly one or two" for later. Sizing needs only which parts of the brief the PRD covers, what reaches production, and its seams. It does not answer the brief's open questions or design anything, and the entry cap (Step 5) holds. An open question that leaves a part's size alone is assigned to its planned PRD as usual (Step 6). Where the brief says too little to size a part at all, the gap is never filled with invented scope: the part gets no planned PRD, goes into the brief's deferred list with an open question naming what the brief must settle, both unassigned, and the declaration names it (Step 7). A planned PRD that cannot reach production without a deferred part is deferred with it. A borderline entry stays one; if its PRD outgrows the band while it is being written, the size check in `prd-writing-standards` sends it back here to be re-cut into two or more planned PRDs of this initiative, in its place ("Re-cutting a planned PRD"). A planned PRD is never broken down into PRDs of its own.
- **Planned-PRD count is an output, not a target.** See "PRD Size Calibration".
### Step 5: Write the PRD List and the PRD Contracts
Two documents, for two readers. **The PRD list is for people**: the list someone opens to see every PRD in the idea, its priority, what it delivers and where it stands. **The PRD contracts is for sessions**: what a session needs to write a planned PRD, and what a technical design must honor so the PRDs fit together. Keep each to its reader. Per-PRD scope prose and the Seams table in the PRD list make a document no person reads end to end, and the list they came for gets lost in it.
#### The PRD list
`docs/initiatives/{name}/{name}-initiative-prds.md`. Tables, nothing else.
```markdown
# {Title} Initiative PRDs
The [{Title} Initiative Brief]({name}-initiative-brief.md) cut into right-sized PRDs. Each one ends with something that can be promoted to production. The order is priority: a PRD whose Depends on PRDs are done can be built at any time, and the order can change. What the PRDs owe each other: [{Title} PRD Contracts]({name}-prd-contracts.md). [When the initiative has one:] Item-level coverage: [{Title} Coverage Matrix]({name}-coverage-matrix.md).
## Priority group
[One sentence: who set the priority and what it covers.]
| Order | PRD | Depends on | What reaches production | Status |
|---|---|---|---|---|
| 1 | [Cloud Ingestion]({name}-prd-contracts.md#cloud-ingestion) | None | The desktop agent uploads activity to the cloud and nothing is lost offline; the owner's history is backed up. | planned |
| 2 | [Hosted Reporting]({name}-prd-contracts.md#hosted-reporting) | Cloud Ingestion | ... | planned |
## Later group
[One sentence: why these come later.]
| Order | PRD | Depends on | What reaches production | Status |
|---|---|---|---|---|
| 3 | ... | ... | ... | planned |
```
- **Group headings only when the brief sets tiers** (a stakeholder's "first" list). Without tiers, one heading, `## PRDs in order`, and one table. Order numbers run through the groups without restarting.
- **The PRD column links the PRD file once it is written**, and the planned PRD's scope entry in the PRD contracts until then.
- **What reaches production** is one plain sentence. **Depends on** names PRDs only; what each provides is in the scope entry, and later in the PRD's own `**Depends on:**` line.
#### The PRD contracts
`docs/initiatives/{name}/{name}-prd-contracts.md`. It points into the initiative brief and never restates it.
```markdown
# {Title} PRD Contracts
What the PRDs in the [{Title} Initiative PRDs]({name}-initiative-prds.md) owe each other: the scope of each PRD not yet written, the contracts each PRD owns, the open questions each settles, and the seams between them. Read by the sessions that write, refine and design these PRDs. Each written PRD is the source of truth for its own scope.
## Cloud Ingestion
**PRD directory, when written:** `docs/prds/acme-cloud-ingestion/`
**Reaches production:** [One or two plain-English sentences: what someone can do or rely on once it ships.]
**In this PRD:** [Bullets naming initiative-brief sections by heading, and which parts of each.]
**Not in this PRD:** [What a neighbor carries, by the neighbor's name.]
**Depends on:** [Earlier planned PRDs that must be done first, by name, with what each provides, or "None; can be built at any point in the order."]
**Shared contracts it owns:** [Only if any: contracts later PRDs rely on, such as an event schema or device identity. Decided in this PRD's technical design; later PRDs extend them, not redesign them.]
**Questions it answers:** [The initiative brief's open questions this PRD must settle, by their stable labels (Step 6), e.g. "Q3–Q9, Q26; first answer to Q1 and Q28".]
## [Next planned PRD]
...
## Seams
| Between | What crosses the seam | Owned by | What the later PRD may assume |
|---|---|---|---|
| Cloud Ingestion → Hosted Reporting | Raw event schema and storage layout | Cloud Ingestion | Raw events are stored, deduplicated, and attributed to a device. |
```
The first five lines of an entry (directory through Depends on) are its **scope lines**: they exist so the PRD can be written, and they go once it is (Keeping the Initiative Current). A follow-on's entry (`assumptions-document-feedback`, Step 1a) adds two more scope lines after **Depends on:**: `**Follow-on to:**`, naming the PRD it follows, and `**Changes:**`, naming by label each earlier criterion it changes. Its written PRD then carries both, as a `**Follow-on to:**` line under its H1 and as `Replaces:` lines. **Shared contracts it owns** and **Questions it answers** stay for the life of the initiative: the technical designs of later PRDs read them, and no PRD carries them.
**Questions that span PRDs.** An open question that several PRDs extend (overall infrastructure layout, observability, the testing approach) is assigned to the first PRD that must answer it; later entries list it as "extends Q1". This is the same pattern as shared contracts.
**Status** takes three values: `planned`, `PRD written` (with a link to the PRD file), and `in production YYYY-MM-DD`.
**Leave out the fluff.** No background or motivation (the brief's job), no restated brief content, no target dates or estimates, no narrative defending the cut (that was the declaration in the response). An entry runs about 6 to 15 lines. The first planned PRD, which owns most of the foundation, can run to about 25. Past that, the entry is restating the brief. The same cap holds while the PRDs are written and refined: a session that adds detail to an entry instead of to its PRD is restating the PRD.
**A PRD list written before the two were separate**, always under the old names, has its scope entries and Seams table inline. It still works; the next time this skill runs on it, rename it first ("The names"), then move the entries and the Seams table into a PRD contracts document and drop the scope lines of PRDs already written.
### Step 6: Update the Initiative Brief So the Two Never Disagree
- **Add the link line** under its H1: `Cut into PRDs by the [{Title} Initiative PRDs]({name}-initiative-prds.md).`
- **Replace its ordered plan with a pointer.** A section like "Recommended phases" or "Milestones" becomes one line pointing at the PRD list, which now owns the order. Keep any decision that section held — a gate, a constraint, an "X before Y because Z" — as a decision in the brief; only the sequencing moves.
- **Keep its open-questions list, with stable labels.** The PRD contracts assigns each question to a planned PRD, except a question about deferred work, which stays unassigned until that work gets a planned PRD; the brief stays the one list. If the questions have no labels, give them `Q1`, `Q2`, … in their current order. Labels are assigned once and never renumbered: a question that gets answered or dropped keeps its label, the way PRD acceptance-criterion labels work (`prd-writing-standards`).
- **Add to its deferred list** every part Step 4 deferred because the brief said too little to size it, each with the label of the open question that would settle it.
- **Retarget guidance written for one PRD and one design.** A brief written as input to a single PRD often has sections such as "Guidance for the PRD", "Guidance for the technical design", or "Questions the PRD and technical design must resolve". Left as written, they tell the first PRD's author to cover everything, which is the failure this skill exists to prevent. Retitle and reword them so they apply to each PRD cut from this brief, within the scope of its entry in the PRD contracts. Do this with a heading change and one sentence at the top of each section, not a rewrite of its contents.
- **Remove the word "phase"** wherever it named the brief's own ordered units, so the word stays reserved for `phase-split`.
After this, the brief changes only when a decision changes, or when a re-cut moves a draft's criteria into it ("Re-cutting a planned PRD"). If a PRD later overturns a brief decision on purpose, the brief is amended at that point (`implementation-lifecycle`, documents before code).
### Step 7: Declare and Hand Off
State the cut in the response as a decision: a table of order, planned PRD, what reaches production, and one line on why the cut falls there. Name every part deferred because the brief said too little to size it, with the question that would settle it, so the user can settle it and re-run this skill. Then list the renames and removals from Step 3. Do not end the turn to ask whether the cut is acceptable.
Stage the documents (brief, PRD list, PRD contracts, the coverage matrix when there is one, and on a re-cut the kept PRD's draft and any written PRD whose **Depends on:** line changed), validate and commit them per `pre-commit-validation`. Committing is the default, and the user's instructions override it; pushing waits for the user ("Who Commits").
Then give the copy-paste prompt for writing the first planned PRD, using `continuation-prompt`. Its chat name takes the planned PRD's short-name as the unit and the initiative's name as the project tag, and its lineage block names the initiative and the planned PRD:
```
ingestion acmeCloud prd
In service of: Acme Cloud Initiative
Cloud Ingestion — planned PRD, first in the initiative
This chat: writes and refines its PRD.
```
The prompt names `prd-writing-standards` and `autonomous-prd-refinement`, points at the planned PRD's entry in the PRD contracts, its rows in the coverage matrix when there is one, and the initiative brief, and says the PRD's directory. The prompt is valid once this skill's commit lands. The chat it starts writes the PRD (and mockups, if the product needs them) and refines it with `autonomous-prd-refinement`; the technical design and its review (`review-technical-design`), design refinement, phase split, and build follow in the usual chain, with the user's review recommended after the PRD's refinement and after the design's review.
---
## Keeping the Initiative Current
- **When a planned PRD is written**, the chat writing it sets its PRD-list row to `PRD written` and points the row's link at the PRD file (`prd-writing-standards` carries this rule). **When its refinement finishes**, the same chat deletes the entry's scope lines from the PRD contracts, keeping **Shared contracts it owns** and **Questions it answers** (`autonomous-prd-refinement`, Completion). The PRD now holds its own scope; a second copy would only drift.
- **When a PRD's work reaches production**, its row becomes `in production YYYY-MM-DD`: set by the session that promoted it, or named as the user's one-line action when promotion happens outside a session (`implement-from-requirements` wrap-up).
- **Which PRD comes next is the user's decision**, not an automatic continuation. When a PRD's track ends, at the test audit that closes it, that wrap-up says the PRD is complete and names the next PRD after it in the initiative's order that is not yet in production, which may already be written; it does not write that chat's prompt unless asked (`continuation-prompt`, "An initiative is not a track").
- - **Reordering, adding, or dropping a planned PRD is the user's call**, applied by re-running this skill to revise the PRD list, the PRD contracts and the coverage matrix, when there is one. Names never change on a reorder. A reorder keeps every PRD after the PRDs it depends on; moving one ahead of one it depends on means redoing the cut. Discoveries made while building never become planned PRDs on their own (the Materiality Gate in `implementation-lifecycle`); only the user adds one. The one exception is a **follow-on**: when stakeholder feedback asks for something new after a PRD's build has started, `assumptions-document-feedback` adds the follow-on's row and PRD contracts entry itself, placed right after the PRD it follows and ahead of any planned PRD whose criteria it changes. A stakeholder's request is not a discovery, and only one follow-on per PRD is open at a time (`assumptions-document-feedback`, Step 1a).
+ - **Reordering, adding, or dropping a planned PRD is the user's call**, applied by re-running this skill to revise the PRD list, the PRD contracts and the coverage matrix, when there is one. Names never change on a reorder. A reorder keeps every PRD after the PRDs it depends on; moving one ahead of one it depends on means redoing the cut. Discoveries made while building never become planned PRDs on their own (the Materiality Gate in `implementation-lifecycle`); only the user adds one. The one exception is a **follow-on**: when stakeholder feedback asks for something new after a PRD's build has started, `assumptions-document-feedback` adds the follow-on's row and PRD contracts entry itself, placed right after the PRD it follows and ahead of any planned PRD whose criteria it changes, but never ahead of a PRD it depends on. A stakeholder's request is not a discovery, and only one follow-on per PRD is open at a time (`assumptions-document-feedback`, Step 1a).
- **Re-cutting a planned PRD** that outgrew the band happens inside its initiative, while that PRD is being written: when the size check in `prd-writing-standards` trips, before or during drafting, re-run this skill on the initiative, never on the PRD alone. The entry is replaced in place by two or more planned PRDs, keeping the rest of the order; splitting existing scope is not adding a planned PRD. The one that keeps most of the scope keeps the name, the directory and its current status, and its draft, when one exists, is cut down to that scope. Acceptance criteria that move out of the draft go into the initiative brief, in the sections they belong to, as source material for the new entries, as Step 3 keeps a standalone draft's criteria. In the same change, update the PRD list rows, every **Depends on:** line that named the original (its dependents' included), the shared-contract lines, the Seams table, the question assignments and the coverage-matrix rows; Step 7's handoff prompt resumes writing the kept PRD. A PRD already written and refined is not re-cut this way: when `phase-split` finds it well past the band, whether to reopen it is the user's decision ("When to Use"); if the user reopens it, that is adding a planned PRD and moving scope to it (above and below).
- **A written PRD that moves scope to or from a neighbor** updates both PRDs (or the neighbor's scope entry, while it is planned), their contract and seam lines, and the coverage matrix when there is one, in the same change.
---
## PRD Size Calibration
This section holds the concrete numbers, the only part of this skill that ages. Revise it, and nothing else, when experience shows the band is off. Phase size itself is defined in `phase-split`'s "Session Capacity Calibration"; this band is counted in those phases.
- **A right-sized planned PRD splits into roughly 3 to 10 phases.** Past about 12, it is two PRDs. Inside an initiative, an entry that would be only one or two phases usually merges into a neighbor. A follow-on from stakeholder feedback is exempt: it exists because the PRD it follows was already being built, and any ask a neighbor's scope covered went to that neighbor instead. Outside an initiative, small PRDs are normal: `phase-split` expects many PRDs to be two to four phases or not split at all. This band is for cutting a big idea, not a minimum for every PRD.
- **A typical initiative has 3 to 6 planned PRDs.** A genuinely large idea can produce more. The red flags are PRDs that fail the band, not the count.
---
## Rules and Constraints
### DO
- Read every input, supplements especially, and the live system when the idea rebuilds one, before deciding anything.
- Build the Seams table bottom-up from shared components, foundations and handoffs; give each to the first PRD that uses it.
- Test the idea as a whole first; when it is one PRD, say so and hand off without creating an initiative.
- Consolidate every input into one initiative brief, named for the thing being built, at `docs/initiatives/{name}/{name}-initiative-brief.md`, with `git mv` for tracked files and the trash for untracked extras.
- Cut vertically: every planned PRD ends with something finished that can be promoted to production.
- Put the shared foundation inside the first PRD, cut at hard gates and where the brief stops, and order for the earliest real value.
- Size every planned PRD against the calibration band and re-cut until all pass, with only the detail sizing needs; defer a part the brief says too little about to size, and name it in the declaration.
- Name planned PRDs, never number them; name their future directories `{name}-{short-name}`, the short-name being the PRD's name in kebab case.
- Keep the initiative brief whole; point into it by section heading; replace its ordered plan with a pointer to the PRD list.
- Declare the cut, write the PRD list and the PRD contracts (and the coverage matrix when the input calls for one), and hand off with a prompt for writing the first planned PRD.
### DO NOT
- Write a PRD, technical design, mockups, or phase documents, or create a PRD directory.
- Split the initiative brief, or write a brief per planned PRD.
- Make a planned PRD out of one layer (infrastructure, data model, backend) that reaches production only when a later PRD arrives.
- Stop to ask whether to cut, or which cut to use.
- Call planned PRDs phases, stages, releases, milestones, tracks, or MVPs, or refer to one by a bare number.
- Put target dates, estimates, or owners in the PRD list.
- Put scope prose, contract lists or the Seams table in the PRD list; they belong in the PRD contracts.
- Turn discoveries into planned PRDs; only the user adds one, apart from a stakeholder-requested follow-on ("Keeping the Initiative Current").
- Answer the brief's open questions, design anything, or invent scope to size an entry.
- Break a planned PRD down into PRDs of its own, or make it a new initiative; re-cut it inside its initiative.
---
## Relationship to Other Skills
| Skill | How This Skill Relates |
|-------|-------------------------|
| `prd-writing-standards` | Downstream consumer. Writes each planned PRD from its entry in the PRD contracts and the initiative brief, sets its PRD-list row to `PRD written`, and documents the `docs/initiatives/` root alongside `docs/prds/` and `docs/changes/` (this skill owns that root's internal layout). Its size check sends oversized ideas and drafts here. |
| `phase-split` | The same job one level down: it cuts one PRD into session-sized phases. Its seam principles (vertical slices, walking skeleton, backward dependencies, sequential walkthrough) are reused here at PRD scale, and its Session Capacity Calibration defines the phase size this skill's band counts in. |
| `technical-design-writing-standards` | Each planned PRD gets its own single technical design. A design honors the initiative brief's settled decisions and the seams in the PRD contracts: it decides the shared contracts its PRD owns and extends, never redesigns, contracts an earlier PRD owns. |
| `implementation-lifecycle` | Lists writing a planned PRD as requirements work with its own lineage, and supplies the Materiality Gate that keeps discoveries from becoming planned PRDs. |
| `implement-from-requirements` | When it closes the last phase of a PRD in an initiative, it hands off to the closing audits and handles the `in production` status; the test audit that ends the track names the next PRD not yet in production (no prompt). |
| `continuation-prompt` | Produces the handoff prompt for writing the first planned PRD. At the end of a PRD, treats the initiative's next PRD as the user's decision, not the next unit of the finished track. |
| `pre-commit-validation` | Validates the staged documents before any commit. |