geode-workflow · git:20260907.97cb78b · 2026-09-07 · sha256 2e654a48f1cd9b87
geode-workflow git:20260907.97cb78bA
Immutable. This exact content is served forever at /api/v1/blob/2e654a48f1cd9b87.
--- name: geode-workflow description: GEODE evidence-first development workflow. Use for feature work, provider/model changes, GUI/computer-use work, PDF/document ingestion, observability/schema/event/state changes, verification planning, GitFlow merge prep, and requests to "follow the workflow" or "scaffold the process". --- # GEODE Workflow Use this skill as GEODE's default execution scaffold. It replaces the older issue-first workflow with an evidence-first loop: inspect existing code, ground external contracts, define the observable surface, implement narrowly, verify, then report honestly. ## Core Loop Follow the [canonical workflow](../../../docs/workflow.md#core-loop) and its [execution scope](../../../docs/workflow.md#execution-scope). Produce the requested reviewable result; load only the references relevant to the task. For abstraction, naming, type/class, schema, test, site, or version decisions, use `$geode-code-conventions`. ## Reference Routing Read only the reference needed for the current task: | Need | Read | |---|---| | Phase-by-phase checklist for ordinary code work | `references/phase-checklist.md` | | Abstraction, naming, type/class, schema, test, site, and version conventions | `$geode-code-conventions` (follow its task-specific SOT routing) | | Provider/model/API capability claims | `references/provider-grounding.md` | | Schema/log/event/state/trajectory consistency | `references/observability-contract.md` | | Same-task Codex–GEODE production and comparison | `references/codex-geode-paired-coding.md` | | Test, lint, type, prompt, full-suite reporting, or failure-to-rule review | `references/verification-gates.md` | | Branch, PR, merge, and cleanup operations | `references/gitflow.md` | For simple docs or trivial bug fixes, use the core loop and skip references that do not affect the task. ## Non-Negotiables - Do not switch branches inside an active worktree. - Do not revert unrelated dirty work. - Architecture/extensibility implementation work starts only after a roadmap-only claim PR moves the package from `READY` to `IN_PROGRESS` on canonical `develop` and names its owner/implementation branch. Claim and reconciliation PRs establish that prerequisite; they do not require an earlier claim. The implementation PR preserves the claimed status and never predicts `IN_DEVELOP` or `DONE`. - Register architecture scope discovered during implementation through a separate roadmap-only GAP-registration PR. Registration may add an `OPEN` package without a prior claim, but does not authorize implementing it. - Within the architecture/extensibility program, use `origin/main` only for a tracking-only roadmap `DONE` worktree after release. Its PR targets `main`, carries no implementation code, and is followed by a CI-gated `main -> develop` sync. - Do not mark unsupported provider behaviour as supported without grounding. - Do not add ad hoc observability strings when the capability/evidence vocabulary should be extended. - Do not log raw screenshots, base64 blobs, API keys, tokens, passwords, or secret fragments. - Do not imply a full-suite pass if only targeted checks ran. ## Output Contract When finishing, include: - implementation summary - key files changed - verification commands and results - known failures, skipped gates, or live-test uncertainty - GitFlow state if any branch/PR/merge action was requested