bearing-lite · diff
git:20261119.b9cdaab to git:20261119.553c988
1 added, 1 removed. Audit A to A.
What this update changes in the checks
No check changed: every fixed check gives the same answer before and after this update.
A tripped check is a label, not a verdict: read the matched text and the lines below. This week's updates that newly trip a check.
---
name: bearing-lite
description: >
Coordinate a Bearing lifecycle as Planning or Implementation Orchestrator only
when the owner explicitly requests Bearing for that mode. Do not activate for
ordinary work, model or role selections, assigned packets, implementation work
without that request, or advisory-hook suggestions.
---
# Bearing Orchestrator
Coordinate planning, implementation, verification, validation and delivery. Preserve scope, agents, authority and evidence.
Own lifecycle state and owner communication; unrequested review stays inactive. Resolve wave escalations using `references/owner-stops.md`.
After opt-in, bind the session/task in the project plan per `templates/task.md`; installation, old plans, or role names never activate hooks. On resume, follow `references/resume.md` first; continue the recorded mode and next unfinished action.
Use the [catalog reference](references/profiles.md) to select a profile. An
explicit setup or catalog-edit request uses [onboard-bearing](../onboard-bearing/SKILL.md).
## Modes
- **Planning Orchestrator:** owns context, specialist dispatch, final plan/design, owner agreement, and the written handoff; does not dispatch implementation.
- **Implementation Orchestrator:** checks handoff and follows `references/coordinator-migration.md` for wave duties and frozen legacy assignments.
1. **Intake:** use `../intake/SKILL.md` to confirm repository and task location. Reuse confirmed inputs; ask only on material ambiguity. Start the Orchestrator in a directory that survives cleanup (outside disposable task worktrees) and name the worktree explicitly for short commands so no Orchestrator process holds a worktree open during cleanup. Once the profile is bound, launch an enabled Scribe once at the start of the Lifecycle at its frozen cadence (`roles.scribe.cadence`, `event` default); never invent or launch a disabled/omitted Scribe.
2. **Architectural Alignment and Scope:** use `../architectural-alignment/SKILL.md`
in the controller session to establish architecture, constraints, and shared
scope. Reuse the previous `repository-map.md` after a freshness check,
refreshing only stale or newly affected parts. Own the workspace and map; add
no second scope stage or agent.
3. **Planning:** select the process tier (`light` — Orchestrator plus one author —
`standard`, or `full`) by the stated risk rule in
`references/planning-assembly.md`, including the
- [live-host and contained-tool-change tier rules](references/verification.md#process-tier-resolution)
+ [live-host tier exception](references/verification.md#process-tier-resolution)
when applicable. Coordinate only the profile-enabled
specialists required by that tier and task, then author final plan/design and
assemble the package using `references/planning-assembly.md`. Specialists run
only their own artifact checker; the repository gate runs once at assembly, and
evidence returns digests, commands, and exit codes, not narrative logs. Run
requested planning review after assembly, before owner confirmation/handoff.
4. **Implementation:** at intake, verify the `final_freeze_receipt` in
`handoff.md` using the [handoff template](templates/handoff.md). If the receipt
is absent, invalid, or `draft`-only, return to planning before dispatch.
Once verified, consume the handoff. In selected TDD, run the frozen Test Implementer (`roles.test_implementer`)
before Product Implementer. Send `work_class: light` slices to a selected Light Implementer; `reclassify: judgement`
returns them to Implementer. [Evaluate readiness across the frozen graph](references/coordinator-migration.md#completion-notifications-and-recovery)
and start every ready slice whose declared `inputs` and dependencies are met
and whose held `resource` (host, repository, worktree, or `resource_groups`)
and `write_set` are free. Honor the frozen dispatch authority and agent cap.
Run the first implementation slice as a preflight slice with every planned
command in dry-run or `--version` form on every target host in parallel, and
end any phase that builds a host by running that repository's real gate on it.
When `snapshot.fellow` is present, follow the [Fellow consultation guide](references/consultation.md).
Consult before a major decision (with options and a leaning in hand), when
stuck after two genuine attempts, facing unexplained behavior, or preparing
a workaround. Also consult before declaring a task done and when the owner asks.
The Implementation Orchestrator owns new waves.
For a frozen legacy Coordinator assignment, use its pinned runtime or obtain an explicit handover
before continuing.
5. **Review:** use the approved slice, phase, or lifecycle cadence. On a
multi-slice phase or wave, requested independent assurance may start on
finished slices' immutable receipts and the pinned candidate while the last
slice runs. The same session joins the last slice's receipts before its
verdict on the final integrated candidate and preserves single-run role and
gate budgets. Follow the [dispatch timing](references/assurance-policy.md#dispatch-timing-222)
for early assurance. Dispatch each remaining owner-requested review immediately after the
recorded boundary passes deterministic checks. The approved
task plan supplies task and rolling batch boundaries. A recorded request
requires no further approval. An independent evaluator is a reviewer.
Preserve selected assistance tools; preauthorize bounded same-session repair in the
original packet and consume consolidated evidence without per-finding approval. For
a review before a first live apply, include the frozen host and class rows and
the exact proposed operand list, not only the executor diff. Add no quality agents.
6. **Landing and closeout.** Follow the [landing order](references/task-state.md#landing-a-closed-unit).
After focused checks, push and open a draft PR for its number, complete the
requested review and any review repair, commit the `CHANGELOG` link and
number-dependent text, then gate once after the review repair on that final
head and push the verified commit to the draft. If a push runs the gate,
reuse its result for the unchanged head with matching input hashes. Mark
ready and merge the same head with its exact-head receipt. A change after
gating is a procedure defect. Check deliverables and evidence. Distinguish
author checks, requested review, merge, deployment, and activation; report remaining obligations.
## Planning handoff
Write `handoff.md` using `templates/handoff.md` and the Prompt skill (`../prompt/SKILL.md`) in the confirmed plan directory when planning is complete. Include `final_freeze_receipt` (`stage: "final"`, `outcome: "PASS"`, `manifest_digest`, command, and exit code from `hooks/plan-package.cjs`; a `draft` freeze does not satisfy it), exact plan paths and digests, scope, owner decisions and authority,
selected models/harnesses/capabilities, candidate and worktree, assignments and write sets, commands, evidence, review status, blockers, and the next action. When work crosses a target host, state in the plan and `handoff.md` how the exact candidate and its proof travel to the target host, who may approve that transport (owner or explicit delegate within `authority.json`), and what may land locally when the host gate cannot run.
Honor the approved `planning_to_implementation_clean_session` setting. When
true, recommend a new Implementation Orchestrator session with this handoff.
When false, continue from the durable handoff here. Resolve an unset choice
during integrated owner confirmation. The owner opens a fresh session.
The implementation session consumes settled planning; it does not repeat it.
Handoff and closeout pass `journey` to `hooks/closeout.cjs`; untranscribed decisions, authority events, or landings refuse them until the configured recorder transcribes them. On `mode: "handoff"`, `hooks/closeout.cjs` also requires a valid `final_freeze_receipt` and refuses the handoff when absent or `draft`-only.
## Dispatch and recovery
Preserve the recorded profile; use `references/profiles.md` for authorized amendments.
Launch each selected agent assignment once. Every packet carries a time target
and "at the limit, return what you have and list the gaps". Extra invocations, retries, repairs,
or resumed agent runs require explicit authority; self-correction stays in-run.
Launch an enabled Scribe once at the start of the Lifecycle and use that one session at its frozen cadence (`event` default); never relaunch it per event or phase. When disabled or omitted, Orchestrator records history.
Register native completion notifications at dispatch. Wait through the harness's event mechanism; wake when an agent response arrives.
Consume each response once and dispatch newly ready work. Never poll logs, processes,
status, or worktrees, or use timers/sleep loops for periodic “still running” checks.
If event waiting is unavailable, return `WAITING_ON`; resume on the actual response.
Use `references/task-state.md` for state integrity, `references/resume.md` for resume and Scribe coverage, and `references/owner-stops.md` for authority/intent stops. Never replay completed stages or change routes.
Selected or required capabilities activate; unavailability, including a needed MBSE route omitted or disabled, is a typed capability gap, not substitution, not success, not invented behavior. Unselected and unrequired absence remains inactive, not a global failure.
Return `READY`, `WAITING_ON`, `OWNER_DECISION_REQUIRED`, or `COMPLETE` with mode,
stage, candidate, completed work, evidence, blocker, and next action.
Never expand scope, author delegated artifacts, invent decisions, or pass missing evidence.
Any scope decision that drops an acceptance item is an owner question box (`OWNER_DECISION_REQUIRED`), even under delegation.