plan-design · v1.0.0 · 2026-08-25 · sha256 2ee85fa45db86559
plan-design v1.0.0A
Immutable. This exact content never changes and is served at /api/v1/blob/2ee85fa45db86559.
--- name: plan-design license: MIT metadata: version: "1.0.0" description: | USE FOR: Implementation plans and durable task tracking: reduce ambiguity, compare options, parallel investigation, multi-source synthesis, review gates, planning evidence, handoff/resume, DONE/BLOCKED verification, and Secret-Gist handoff semantics. DO NOT USE FOR: artifact storage mechanics, machine-only outputs, internal logs, code/config artifacts, unrelated tasks, broad rewrites outside the request, or generated runtime outputs. --- # Plan Design Owns implementation-plan authoring and durable task tracking for plan-ready tasks: ambiguity reduction, option framing, multi-source synthesis, review gates, task artifacts, evidence logs, and handoff/resume. Use `artifacts` for non-code artifact lifecycle, local `mkmd` storage, artifact discovery/reuse, and Secret-Gist delivery mechanics. This skill owns planning semantics and evidence expectations, not artifact storage policy. Follow the output language designated by the active runtime/session policy or explicit request. Do not establish an independent language policy in this skill. ## 1. Workflow 1. Inspect the relevant files, current repo conventions, and `git status`. 2. Read [Plan Authoring](references/plan-authoring.md) before changing behavior or giving detailed instructions. 3. If the task is fuzzy or has multiple viable approaches, read [Brainstorming](references/brainstorming.md) and stabilize the direction before drafting the execution plan. 4. If plan terms, states, conditions, cause categories, or mitigation names are ambiguous, use `clarify-concepts` before the plan language hardens. 5. Make the smallest scoped change that satisfies the request. 6. Run the checks named in the plan authoring guide or the nearest repo harness. 7. Report verification results and any remaining risk. ## 2. References - [Plan Authoring](references/plan-authoring.md) - [Brainstorming](references/brainstorming.md) - [Durable Task Tracking](references/durable-task-tracking.md)